| 1 | L-1₹1.1 CrAccepted-AOC 366 GIANI ZAIL SINGH NAGAR ROPAR PB 140001 | ROPAR | ROPAR | PUNJAB | 140001 | ₹1.1 Cr | L-1 | Accepted-AOC Rate found L-1 |
| 2 | L-2₹1.2 Cr+₹12.7 L (11.9%)Rejected-Finance | ₹1.2 Cr+₹12.7 L (11.9%) | L-2 | Rejected-Finance Rates found L-2 |
Tender Value
Refer Docs
Closing Date
2 Aug 2021, 12:00 pmClosed
Chief Engineer Project Deepak
HQ CE Project Deepak, chakker Barrier, Hari Nager , Shimla
P AND L COMPACTION OF 200 MM THICK GSBC IN SINGLE LAYER 150 MM THICK WMM 75 MM THICK DBM AND 40 MM THICK BC INCLUDING PREPARATION OF SUB GRADE APPLYING PRIME COAT AND TACK COAT ALL AS PER PS SPN KM 34 PT300 KM 121PT 500 AND KM 169 ON M S ROAD
2021_BRO_458522_1
CE Project Deepak-04 of 2021-22
Open Tender
Civil Works
Works
365 days
Manali Sarchu Road
As per tender document
9 documents required · 9 mandatory
₹0
Exempted
Shimla
23 Oct 2021
9 Jul 2021
3 Aug 2021
9 Jul 2021
2 Aug 2021
14 Jul 2021
9 Jul 2021 - 13 Jul 2021
13 Jul 2021
Amount
Part (I) At Km 34.300 on Manali Sarchu (Dett Marhi) Alt 3301-3600 mtr
Preparation of sub-grade in SMB by excavating up to 200 mm average depth, dressing excavated earth to required camber super elevation and compaction with power roller including watering & disposal of surplus earth within a lead of 30 mtr and as specified in particular specification.
Preparation of sub-grade in HR by excavating up to 200 mm average depth, filling with small stone metal out of excavated material, dressing excavated earth to required camber super elevation and compaction with power roller including disposal of surplus material within a lead of 30 mtr and as specified in particular specification.
Providing, laying and compaction of GSBC 200 mm thick (compacted) in single layer over prepared sub grade conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of WMM 150 mm thick (compacted) over finished GSBC layer conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of DBM 75 mm thick (compacted) over finished WMM layer with minimum 4.5% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of BC 40mm thick (Compacted) over finished DBM layer with minimum 5.4% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing and applying prime coat on prepared WMM surface including cleaning of road surface and spraying bitumen emulsion (SS-1 grade) @ 7.50 Kg/10 Sqm using bitumen pressure distributor conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing and applying of tack coat on prepared DBM surface including cleaning of road surface and spraying bitumen emulsion (RS-1 grade) @ 2.50 Kg/10 Sqm using bitumen pressure distributor conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Part (II) At Km 121.500 on Manali Sarchu (Dett Stingri) Alt 3301-3600 mtr
Preparation of sub-grade in SMB by excavating up to 200 mm average depth, dressing excavated earth to required camber super elevation and compaction with power roller including watering & disposal of surplus earth within a lead of 30 mtr and as specified in particular specification.
Preparation of sub-grade in HR by excavating up to 200 mm average depth, filling with small stone metal out of excavated material, dressing excavated earth to required camber super elevation and compaction with power roller including disposal of surplus material within a lead of 30 mtr and as specified in particular specification.
Providing, laying and compaction of GSBC 200 mm thick (compacted) in single layer over prepared sub grade conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of WMM 150 mm thick (compacted) over finished GSBC layer conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of DBM 75 mm thick (compacted) over finished WMM layer with minimum 4.5% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of BC 40mm thick (Compacted) over finished DBM layer with minimum 5.4% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing and applying prime coat on prepared WMM surface including cleaning of road surface and spraying bitumen emulsion (SS-1 grade) @ 7.50 Kg/10 Sqm using bitumen pressure distributor conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing and applying of tack coat on prepared DBM surface including cleaning of road surface and spraying bitumen emulsion (RS-1 grade) @ 2.50 Kg/10 Sqm using bitumen pressure distributor conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification..
Part (III) At Km 169.000 on Manali Sarchu (Dett Zing Zing Bar) Alt 3901-4200 mtr
Preparation of sub-grade in SMB by excavating up to 200 mm average depth, dressing excavated earth to required camber super elevation and compaction with power roller including watering & disposal of surplus earth within a lead of 30 mtr and as specified in particular specification.
Preparation of sub-grade in HR by excavating up to 200 mm average depth, filling with small stone metal out of excavated material, dressing excavated earth to required camber super elevation and compaction with power roller including disposal of surplus material within a lead of 30 mtr and as specified in particular specification.
Providing, laying and compaction of GSBC 200 mm thick (compacted) in single layer over prepared sub grade conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of WMM 150 mm thick (compacted) over finished GSBC layer conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of DBM 75 mm thick (compacted) over finished WMM layer with minimum 4.5% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing, laying and compaction of BC 40mm thick (Compacted) over finished DBM layer with minimum 5.4% Bitumen (VG-10) content to total mix conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing and applying prime coat on prepared WMM surface including cleaning of road surface and spraying bitumen emulsion (SS-1 grade) @ 7.50 Kg/10 Sqm using bitumen pressure distributor conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification.
Providing and applying of tack coat on prepared DBM surface including cleaning of road surface and spraying bitumen emulsion (RS-1 grade) @ 2.50 Kg/10 Sqm using bitumen pressure distributor conforming to MORT&H specifications for Road and Bridge works (Fifth revision) and as specified in particular specification..
LSR Logistics Private Limited
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .