Loading…
Loading…
Tender Value
₹2.5 Cr
EMD Value
₹1 L
Closing Date
18 Jul 2026, 5:00 pm
Executive Engineer
Office of the executive engineer LID And EW Division Wayanad DP
GENERAL-Kerala state budget 2024-25 - Public works - Kattikkulam Mullankolly Olenchery road - Thirunelly GP - 300 lakhs- Kattikkulam Mullankolly Olenchery road - Thirunelly GP - 300 lakhs-General Civil Work - QUOTATION
2026_LSGD_859359_3
D2-1281/2026(3)
Open Tender
Civil Works - Roads
365 days
Kalpetta
Please refer in tender documents
7 documents required · 7 mandatory
₹0
₹1 L
Yes
6 Jul 2026
6 Jul 2026
20 Jul 2026
6 Jul 2026
18 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SIDE PROTECTION (MoRTH) | |||||
| 1.001 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br> | - | cum | - | - |
| 1.002 | OD504716/2025-2026:DRY RUBBLE MASONRY with hard stone, in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications (Base Data-MoRD 75.7.1) | - | cum | - | - |
| 1.003 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | - | cum | - | - |
| 1.004 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br> | 1 | cum | - | - |
| 1.005 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | - | MT | - | - |
| 2CULVERT&DRAINAGE (MoRTH) | |||||
| 2.001 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br> | 1 | cum | - | - |
| 2.002 | OD504772/2025-2026:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. (Base Data- DSR 60.7.2) | 1 | cum | - | - |
| 2.003 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 1 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.19 MB
Tendernotice_2.pdf
PDF • 0.07 MB
Tendernotice_3.pdf
PDF • 0.25 MB
Tendernotice_4.pdf
PDF • 0.14 MB
Tendernotice_5.pdf
PDF • 0.07 MB
Tendernotice_6.pdf
PDF • 0.10 MB
BOQ_1453028.xls
BOQ • 0.33 MB
viewsbdmerged.pdf
Tender Documents • 2.33 MB
Download all tender documents and submit your bid