Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹8.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹8.6 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | AJITH KUMAR SN L1 | Ajesh SN L2 |
|---|---|---|---|---|---|
| 1.00Sedimentation Tank 1 & 2 - Washing & Cleaning | |||||
| 1.00 | 100.53.1.a:Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns, disposing the the slurry / waste materials away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the existing structure and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete. | 18,096 | sqm | 38 ₹6,87,648 Lowest | 40 ₹7,23,840 |
| 1.00 | 100.98.1008:Engaging Coolie. | 30 | no | 300 ₹9,000 Lowest | 325 ₹9,750 |
| 1.00 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 50 | sqm | 20 ₹1,000 Lowest | 22 ₹1,100 |
| 2.00Flocculation Tank - Washing & Cleaning | |||||
| 2.00 | 100.53.1.a:Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns, disposing the the slurry / waste materials away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the existing structure and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete. | 2,120 | sqm | 23 ₹48,760 Lowest | 25 ₹53,000 |
| 2.00 | 100.98.1008:Engaging Coolie. | 30 | no | 300 ₹9,000 Lowest | 325 ₹9,750 |
| 2.00 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. | 200 | Kwh | 15 ₹3,000 Lowest | 18 ₹3,600 |
| 2.00 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 280 | sqm | 150 ₹42,000 Lowest | 175 ₹49,000 |
| 2.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 500 | sqm | 12 ₹6,000 Lowest | 15 ₹7,500 |
Tender Value
Refer Docs
EMD Value
₹33,105
Closing Date
30 Jul 2026, 5:00 pmClosed
AEE
H Q Sub Division
O M Water Supply Schemes TWSS Periodical washing and cleaning of Sedimentation Tank and Flocculation Tank at 36 MLD WTP for the year 2026 2027 General Civil Work
2026_KWA_862528_1
1417/2026
Open Tender
Civil Works - Water Works
Item Rate
365 days
Thiruvananthapuram
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,760
₹33,105
Yes
3 Aug 2026
25 Jul 2026
31 Jul 2026
25 Jul 2026
30 Jul 2026
25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sedimentation Tank 1 & 2 - Washing & Cleaning | |||||
| 1.001 | 100.53.1.a:Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns, disposing the the slurry / waste materials away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the existing structure and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete. | - | sqm | - | - |
| 1.002 | 100.98.1008:Engaging Coolie. | - | no | - | - |
| 1.003 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | - | sqm | - | - |
| 2Flocculation Tank - Washing & Cleaning | |||||
| 2.001 | 100.53.1.a:Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns, disposing the the slurry / waste materials away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the existing structure and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete. | - | sqm | - | - |
| 2.002 | 100.98.1008:Engaging Coolie. | - | no | - | - |
| 2.003 | 100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete. | - | Kwh | - | - |
| 2.004 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | - | sqm | - | - |
| 2.005 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.95 MB
Tendernotice_2.pdf
PDF • 0.04 MB
BOQ_1458812.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].