| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAdmitted-Finance | ₹6.2 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | joy thomas L1 |
|---|---|---|---|---|
| 1.00 | Welding by gas or electric plant including transportation of plant at site etc. complete. | 540 | cm | 15 ₹8,100 |
| 2.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 2 | cum | 16,000 ₹32,000 |
| 3.00Centering and shuttering including strutting, propping etc. and removal of form for : | ||||
| 3.10 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 10 | sqm | 1,000 ₹10,000 |
| 4.00Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. | ||||
| 4.10 | a) Thermo-Mechanically Treated bars of grade Fe-500D or more | 400 | Kg | 125 ₹50,000 |
| 5.00 | Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). | 15 | sqm | 500 ₹7,500 |
| 6.00 | Making template for fixing foundation bolts as per the lay out of foundation bolts using 3Nos of 4mm thick ACP sheet of size up to 500 mmx 500 mm each and making 5 nos of holes upto 32 mm dia in each plate to suit the 28mm foundation bolts and interconnecting the plates by MS angles of section L40xL40x4 mm with minimum 3 Nos of 8 mm dia bolts on each end and transportation from Anjumana to Companypady near Aluva including loading,unloading and lifting up to roof top at G+2 level complete as per the direction of Engineer in charge. | 1 | job | 10,000 ₹10,000 |
| 7.00 | Placing of anchor bolts in sets corresponding to the requirement of tower erection including all labours and handling charges and checking with template in line , level, plumb etc. as per direction of Engineer - in- charge.complete. | 15 | Nos. | 150 ₹2,250 |
| 8.00 | Dismantling with care superstructure of three legged communication tower (upto 20Mtr height roof top tower ) including dismembering Structural sections of the tower viz.angles,flats, channels, gusset plate, base plate, bolts, nuts, ladder, working platform, cable tray, antenna fixtures, lightning arrestor , and lifting down from roof top to ground floor building etc and stacking within 50 Mtr lead etc., complete as directed by the Engineer - in Charge. (The rate shall be inclusive of cost of providing safety measures, insurance charges and all labour involved in the operation including hire charges and mobilisation charges of tools and plants etc. and nothing extra shall be paid on any account.) | 3 | MT | 17,000 ₹51,000 |
Tender Value
₹5.6 L
EMD Value
₹11,159
Closing Date
21 May 2026, 6:00 pmClosed
EE(C),BCD,EKM
BSNL Civil Division Karakkatt road EKM
Erection of 20m RTT at companypady including dismantling of 20m RTT at Anjumana RP 0335 Transportation to newsite construction of column beam structure foundation Erection Painting Earthing providing platform for equipment room covered
2026_BSNL_277788_1
02/EE-BSNL/CD/EKM/2026-27
Open Tender
Civil Works - Buildings
60 days
Anjumana
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
AO(Cash),O/o PGMT,BSNL,EKM
₹11,159
25 May 2026
16 May 2026
23 May 2026
16 May 2026
21 May 2026
16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Welding by gas or electric plant including transportation of plant at site etc. complete. | 540 | cm | - | - | BI01010001010000000000000515BI0100001142 |
| 2 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 2 | cum | - | - | BI01010001010000000000000515BI0100001143 |
| 3Centering and shuttering including strutting, propping etc. and removal of form for : | ||||||
| 3.1 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 10 | sqm | - | - | BI01010001010000000000000515BI0100001145 |
| 4Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. | ||||||
| 4.1 | a) Thermo-Mechanically Treated bars of grade Fe-500D or more | 400 | Kg | - | - | BI01010001010000000000000515BI0100001147 |
| 5 | Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). | 15 | sqm | - | - | BI01010001010000000000000515BI0100001148 |
| 6 | Making template for fixing foundation bolts as per the lay out of foundation bolts using 3Nos of 4mm thick ACP sheet of size up to 500 mmx 500 mm each and making 5 nos of holes upto 32 mm dia in each plate to suit the 28mm foundation bolts and interconnecting the plates by MS angles of section L40xL40x4 mm with minimum 3 Nos of 8 mm dia bolts on each end and transportation from Anjumana to Companypady near Aluva including loading,unloading and lifting up to roof top at G+2 level complete as per the direction of Engineer in charge. | 1 | job | - | - | BI01010001010000000000000515BI0100001149 |
| 7 | Placing of anchor bolts in sets corresponding to the requirement of tower erection including all labours and handling charges and checking with template in line , level, plumb etc. as per direction of Engineer - in- charge.complete. | 15 | Nos. | - | - | BI01010001010000000000000515BI0100001150 |
| 8 | Dismantling with care superstructure of three legged communication tower (upto 20Mtr height roof top tower ) including dismembering Structural sections of the tower viz.angles,flats, channels, gusset plate, base plate, bolts, nuts, ladder, working platform, cable tray, antenna fixtures, lightning arrestor , and lifting down from roof top to ground floor building etc and stacking within 50 Mtr lead etc., complete as directed by the Engineer - in Charge. (The rate shall be inclusive of cost of providing safety measures, insurance charges and all labour involved in the operation including hire charges and mobilisation charges of tools and plants etc. and nothing extra shall be paid on any account.) | 3 | MT | - | - | BI01010001010000000000000515BI0100001151 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.82 MB
NIT02twranjumana.pdf
Tender Documents • 1.81 MB
BOQ_324376.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid