Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance A 183 TTC INDUSTRIAL AREA KHAIRANE MIDC THANE BELAPUR ROAD NAVI MUMBAI THANE MAHARASHTRA 400705 | THANE | MAHARASHTRA | 400705 | Admitted-Finance |
| 2 | Admitted-Finance 31 NEELGIRI IND ESTATE T J ROAD SEWRI W MUMBAI MAHARASHTRA 400015 | MUMBAI | MAHARASHTRA | 400015 | Admitted-Finance |
| 3 | Rejected-Technical SECTOR 40 10TH FLOOR L T SEAWOODS TOWER 1 B WING 46 KONKAN RAIL VIHAR ROAD SEAWOODS THANE MAHARASHTRA 400706 | THANE | MAHARASHTRA | 400706 | Rejected-Technical Techno Commercially not accepted |
Tender Value
Refer Docs
Closing Date
15 Apr 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Bhupendra Singh
6th floor Service block North yard Mazagon Dock Shipbuilders Ltd Dockyard Road Mumbai 400010
Hiring of services for Shafting engineering jobs of Yard 12651
2021_MDL_85605_1
8000000979
Limited
Miscellaneous Services
Service
870 days
MDL Mumbai
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
Exempted
30 Apr 2021
1 Apr 2021
16 Apr 2021
1 Apr 2021
15 Apr 2021
1 Apr 2021
120 days
Initial Positioning/ Fit Up of Stern tube, A- Bracket, P-Bracket- Initial Positioning/Fit Up of ‘Stern Tube’, ‘A-Bracket’ and ‘P-Bracket’ as per the ‘Line of Sight’ after Stern-drop measurement and closing of all Shipping-in opening
Control welding, NDT checks and thermal stress relieving of Stern tube, A- Bracket, P-Bracket- Controlled welding and thermal stress relieving of Stern tube, A- Bracket, P-Bracket and intermittent readings to be monitored to avoid welding distortion
Line of Sight using Optical / Laser- Line of sight is done to check the position of “A” Bracket, Stern Tube, “P” bracket and Temporary supports and Equipment with respect to shaft line
Measurement of Chock height - Measurement and analysis of Chock height for Gear box, Thrust block, Stern tube bearings, P-Bracket bearings, A-Bracket bearings and finalisation of Final LoS
Final LoS- Final LoS for Bearings alignment of A-Bkt, P-Bkt, Stern tube, Thrust block, Gear box
Resin Chocking of Bearings and bolting of bearing housing- Resin chocking is for A-Bracket, P-Bracket, Stern tube bearing housing and Shaft sighting for reconfirming of LoS, drilling, tapping and bolting
Erection of temporary supports- Erection of temporary supports Position temporary supports and align on LoS as per MSI document.
Embarkation Outboard Shafting and Installation- Embarkation of Stern tube shaft, deep sea seal, OKF Flange coupling, ESPD, OKC (Sleeve) coupling, Propeller shaft.
Alignment and Installation of OKC sleeve coupling, ESPD and OKF flange coupling, - Alignment and Installation of OKC sleeve coupling, ESPD and OKF flange coupling,
Measurement of Bearing clearances- Bearing clearance and Poker Gauge Readings A-Bracket, P-Bracket, Stern tube bearings
Installation of Deep sea seal and Testing- Installation of Deep sea seal, Air pressure test and Hydro test and run-in alignment
Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning device- Installation of ‘Rope Guard’, ’Net Cutter, and ‘Faring Cones’ and shaft turning device
Gap and Sag alignment- Gap and Sag alignment of TB Aft Flange wrt OKF Coupling, TB Fwd Flange wrt Intermediate Shaft Aft Flange, Intermediate Shaft Fwd Flange wrt GB Output Shaft Flange
Setting the size of Distance Ring - Measurement of final size of Distance Ring and to be machined
Gear box tooth contact checks- MRG Tooth Contact Check 1: With ‘MRG Output Shaft’ disconnected from ‘Intermediate Shaft’ 2. With ‘MRG Output Shaft’ connected from ‘Intermediate Shaft’
Final shaft coupling connection- Final connection of Shaft line to TB and MRG
Jack load test of Gear box, Thrust bearing and stern tube shaft- Jack load test of Gear box, Thrust bearing and stern tube shaft when MRG on Jack screws
Main reduction gear Chock fasting- Gearbox base to be chock fasted a per MSI and OEM recommendation after satisfactory and acceptance of OEM
Thrust bearing chocking- Final chocking of TB
Final Jack load checks and MRG tooth contact checks- Final jack load checks and MRG Teeth Contact Check 3 (Final): With ‘MRG Output Shaft’ connected with ‘Intermediate Shaft’ and Chocking to Foundation
Installation of Bulkhead seal Torsion meter, Oil distribution box, Earthing device.- Balance Installation Activities: including ‘Shaft Brake’, ‘Bulkhead Seal’, ‘Torsion Meter’, ‘Earthing device’ and ‘CPP Oil Distribution Box’.
Bearing Jack load test after Propeller blade installation- Bearing Jack load test after Propeller blade installation and feathering checks of CPP System
Installation of Bulkhead Seals- Installation of Bulkhead Seals at Fr.#56 & Fr.#65
YEOMAN MARINE SERVICES PVT. LTD.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Restricted Tender
This is a Limited tender. Documents are accessible only to bidders authorized by the issuing authority on the government portal.
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .