| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.1 Cr+₹17.4 L (6.05%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L2₹3.1 Cr+₹17.4 L (6.05%)Admitted-Finance | L2 | Admitted-Finance | ||
| 4 | L3₹3.1 Cr+₹20.3 L (7.05%)Admitted-Finance | L3 | Admitted-Finance | ||
| 5 | L4₹3.1 Cr+₹23.2 L (8.05%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
25 Jun 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUBHASISH DAS SARKAR/SSE/NBDD
Annex Building, Uttarkanya, Fulbari, Jalpaiguri
Construction of PCC road from Rajnagar Jama Masjid towards Balutola via Dharampur Bazar under Chowki Mirdadpur GP within Manikchack Dev. Block in the District of Malda. (Length - 3167.00 m, Width -3.75m).
2025_NBDD_858083_4
NBDD/BS/SE/ NIe-T-35/2025-26 (Sl. No. 01 to 06)
Open Tender
CIVIL WORKS
Percentage
240 days
Malda
Please refer Tender documents.
7 documents required · 7 mandatory
₹5.8 L
Yes
20 Feb 2026
3 Jun 2025
27 Jun 2025
3 Jun 2025
25 Jun 2025
3 Jun 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Road Work
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORD
(I) By Manual Means
a) In area of non-thorny jungle | 1.58 | Hectare | 53,604.78 | ₹84,909.97 |
| 2 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required
slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 for Rural Roads of MORD. (Mode of measurement: pre works and post works)
(e) Carriage up to total lead of 5.0 km | 9,842.39 | Cum | 300.1 | ₹29,53,655.59 |
| 3 | Granular Sub-base with Graded Material B. By Mix in Place Method : Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(ii) Grading - III : | 1,211.38 | Cum | 1,946.34 | ₹23,57,757.95 |
| 4 | Water Bound Macadam Base Course
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(ii) Grading-II Aggregate (53 mm to 22.4 mm) Using Stone Screening Type B (11.2 mm) | 908.53 | Cum | 2,755.78 | ₹25,03,704.54 |
| 5 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 13,405.91 | Sqm | 28.6 | ₹3,83,451.92 |
| 6 | Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
(d) M-30 Grade:
(i) Using concrete mixer.
Pakur Variety | 2,422.76 | Cum | 6,764.2 | ₹1,63,88,042.68 |
| 7 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
(b) Where staging is not required | 1,898.78 | Sqm | 255.05 | ₹4,84,274.72 |
| 8 | Construction of Shoulders
B. Hard Shoulders
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by consolidating Jhama metal (63 mm to 45 mm) with moorum screening : | 290.73 | Cum | 2,431.24 | ₹7,06,833.31 |
| 9 | Turfing with Sods
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Clause 307 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). | 1,900.2 | Sqm | 20.5 | ₹38,952.12 |
| 10 | Cross Draingae Work
Dismantling of Cement Concrete Pavements Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 for Rural Roads of
MORD. | 62.06 | Cum | 1,246.62 | ₹77,365.41 |
stage.html
html • 0.04 MB
technical_1923839.pdf
techsummary_1923839.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tendernotice_2.pdf
PDF • 0.51 MB
Tendernotice_3.pdf
PDF • 2.03 MB
BOQ_1923839.xls
BOQ • 0.31 MB
BOQ.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .