Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.0 LAccepted-AOC | 1 | Accepted-AOC agreement executed | |
| 2 | Rejected-Technical | - | Rejected-Technical REJECTED | |
| 3 | Rejected-Technical | - | Rejected-Technical REJECTED |
| Sl No | Description | Qty | Unit | C R REJI L2 | BABU JOSEPH L3 | BAIJU V V L1 |
|---|---|---|---|---|---|---|
| 1.00side protection | ||||||
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 102 | cum | 221.24 ₹22,566.48 Lowest | 386 ₹39,372 | 322.65 ₹32,910.3 |
| 1.00 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 25.5 | cum | 7,590.8 ₹1,93,565.4 | 8,960 ₹2,28,480 | 7,466.99 ₹1,90,408.25 Lowest |
| 1.00 | 75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 53.55 | cum | 5,428.5 ₹2,90,696.18 | 6,380 ₹3,41,649 | 5,322.59 ₹2,85,024.69 Lowest |
| 1.00 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20 | 2.52 | cum | 8,588.8 ₹21,643.78 | 9,275 ₹23,373 | 7,729.91 ₹19,479.37 Lowest |
| 1.00 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.18 | tonne | 87,981.1 ₹15,484.67 | 95,000 ₹16,720 | 79,182.22 ₹13,936.07 Lowest |
| 1.01 | OD399291/2022-2023:Random rubble masonry in cement mortar 1:5 for sub structure without Bond stone including cost of all materials,labour etc complete. | 53.55 | cum | 6,995.1 ₹3,74,587.61 | 8,000 ₹4,28,400 | 6,665.35 ₹3,56,929.49 Lowest |
Tender Value
₹10.0 L
EMD Value
₹24,964
Closing Date
24 Aug 2023, 10:00 amClosed
SUPRENDING ENGINEER
CORPORATION ENGINEER,KOCHI CORPORATION
PROTECTION WALL- STONE MASONRY
2023_LSGD_595588_2
SYE2/1505/21
Open Tender
Civil Works - Roads
Item Rate
90 days
KOCHI CORPORATION
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,356
Yes
₹24,964
Yes
30 Jul 2026
16 Aug 2023
1 Sept 2023
16 Aug 2023
24 Aug 2023
16 Aug 2023
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_883338.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .