Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.7 L+₹4,710.09 (2.73%)Accepted-AOC | L2 | Accepted-AOC K Selected Contractor Kuttan Pillai |
Tender Value
₹1.7 L
EMD Value
₹4,308
Closing Date
16 Dec 2022, 5:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, MI Subdivision, Chengannur
Earth work excavation Dismantling CC Reconditioning and repairing
2022_Irrig_539019_1
IRR/KP/TR/5455/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Thazhakkara
Please refer Tender documents.
9 documents required · 9 mandatory
₹555
Yes
₹4,308
Yes
1 Feb 2023
13 Dec 2022
22 Dec 2022
13 Dec 2022
16 Dec 2022
13 Dec 2022
13 Dec 2022 - 16 Dec 2022
Amount
Annual maintenance
OD12081/2022-2023:Charges for the dismantling the pump cleaning inside greasing , bearing , overhauling , assembling painting etc.
OD12086/2022-2023::Man for cleaning , silt clearing suction pit, silt and debris deposited in & around pump house, in the suction pit ,other emergency works etc.
OD12088/2022-2023:"Conveyance of pump,motor , starter, main switch etc.from LI station / store, to work shop including loading,unloading,placing in position and lorry conveyance etc complete." and re conveyance after repair/rectification conveyance 0.5 day+ man 0.5+0.5 re conveyance 0.5 day+ man 0.5+0.5
OD12090/2022-2023::Dismantling the 15 HP motor at the work shop for rectification such as removing the rotor ,damaged bearings, and varnishing the winding etc with great care and re assembling after rectification as per the direction of the officer
OD12091/2022-2023:Supplying rubber packing sheet for joining the pump with suction pipe
OD12092/2022-2023:Supply and providing bearing grease
OD12093/2022-2023::Supply and providing gland packing
OD12094/2022-2023:Supply and provide starter oil
OD12095/2022-2023:Supplying Insulation tape
OD12121/2022-2023:Fabricating, supplying and fitting 250 mm dia MS pipe (2.7m length) using 8mm thick plate with two end 300mm dia MS flanch using 12 mm thick. Welding, grinding, drilling holes, IR sheet, Nut and bolt and painting with synthetic enamel paint over a priming coat. Including all labour charges etc complete
OD12096/2022-2023:Supplying and installation of bulb
OD12116/2022-2023:Supplying and fixing new pulley and accessories including lathe work for making the pulley suit to axle , etc complete
OD12097/2022-2023:Supplying cotton waste
OD12098/2022-2023:Supplying iron nut and bolt
OD12099/2022-2023:Dismantling and overhauling 8'' foot valve including replacing the flap etc. complete
OD12100/2022-2023:Charges for fitting the pump with motor to checking the alignment setting on bed and trial running, including power supply connections and pipe connections etc. complete
OD12102/2022-2023:Conveyance of pump, motor and its accessories from murinjapuzha store to LI station including loading, unloading, placing in position and lorry conveyance etc complete. conveyance 0.5 day+ man 0.5+0.5 re conveyance 0.5 day+ man 0.5+0.5
OD12105/2022-2023:Re-Conveyance of pump, motor and its accessories from LI station to murinjapuzha store including loading, unloading, placing in position and lorry conveyance etc complete. conveyance 0.5 day+ man 0.5+0.5 re conveyance 0.5 day+ man 0.5+0.5
K J SIMON
Bidder Name
Kuttanpillai
K J SIMON
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_784531.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .