Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | L1 | Accepted-AOC agreement executed | |
| 2 | L2₹4.2 L+₹14,145.45 (3.49%)Rejected-Finance | L2 | Rejected-Finance 2nd lowest tenderer |
Tender Value
₹4.5 L
EMD Value
₹11,156
Closing Date
16 Aug 2022, 6:00 pmClosed
Assistant Engineer
LSGD Sub Division, Pulikeezhu, Valanjavattom P.O, Thiruvalla
Annual Plan-Pulikeezhu BP 2022-23- Vettiyathupady-Pondoorpadam road side wall construction and interlocking in ward 6 of Kadapra GP-Project No. 06/2022
2022_LSGD_501987_1
07/AE/LSGD/PKZ/2022-23
Open Tender
Civil Works - Roads
Item Rate
180 days
Pulikeezhu
Please refer Tender documents.
7 documents required · 7 mandatory
₹985
Yes
₹11,156
Yes
10 Apr 2023
4 Aug 2022
20 Aug 2022
4 Aug 2022
16 Aug 2022
4 Aug 2022
Amount
Side wall Construction
11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth
75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
OD19843/2022-2023:Filling with contractors own earth (excluding rock) in trenches, plinths, sides of foundations, etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.50 m as per direction of site Engineer in charge
OD19850/2022-2023:Supplying and fixing good quality granite name board with an area of 0.50 m2 engraving letters as per directions of Engineer in charge
BENOI V P
Bidder Name
BENOI V P
BENISH TOM BABU
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_719213.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .