Tender Value
₹92.7 L
EMD Value
₹2.3 L
Closing Date
14 Oct 2026, 4:00 pm
Superintending Archaeologist
Superintending Archaeologist, Archaeological Survey of India, Vadodara Circle, Vadodara.
Towards earth work in excavation by manual means in foundation trenches or drains, supplying and filling in plinth with sand under floors, brick work, hiring charges of hydraulic machine, stone work, steel work welded, etc. as mentioned in BoQ.
2026_ASI_927307_1
T/260/2026-Vadodara Circle-2855
Open Tender
Civil Works
Works
150 days
Pavagadh
Please refer tender documents.
8 documents required · 8 mandatory
₹0
₹2.3 L
Yes
23 Sept 2026
23 Sept 2026
15 Oct 2026
23 Sept 2026
14 Oct 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Execution of work under following items | |||||
| 1.01 | Towards earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. (Including all the materials & labour charges etc. complete as direction by site in charge) | 121.49 | Cu.mt. | 270.17 | ₹32,822.95 |
| 1.02 | Towards the filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m (Including all the materials & labour charges etc. complete as direction by site in charge) | 5.9 | Cu.mt. | 203.43 | ₹1,200.24 |
| 1.03 | Towards supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (Including all the materials & labour charges etc. complete as direction by site in charge) | 8.56 | Cu.mt. | 2,204.24 | ₹18,868.29 |
| 1.04 | Towards providing and laying in position cement concrete (pcc) of specified grade excluding the cost of cantering and shuttering - All work up to plinth level: 1:3:6 (1 Cement: 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) (Including all the materials & labour charges etc. complete as direction by site in charge) | 17.12 | Cu.mt. | 7,571.17 | ₹1,29,618.43 |
| 1.05 | Towards centring and shuttering including strutting, propping etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts (Including all the materials & labour charges etc. complete as direction by site in charge) | 601.77 | Sq.mt. | 997.73 | ₹6,00,403.98 |
| 1.06 | Towards providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centring, shuttering, finishing and reinforcement - All work up to plinth level: 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). (Including all the materials & labour charges etc. complete as direction by site in charge) | 95.05 | Cu.mt. | 9,388.58 | ₹8,92,384.53 |
| 1.07 | Towards the steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. (Including all the materials & labour charges etc. complete as direction by site in charge) | 8,805.32 | KG | 111.94 | ₹9,85,667.52 |
| 1.08 | Towards the brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in: Cement mortar 1:4 (1 cement: 4 coarse sand) (Including all the materials & labour charges etc. complete as direction by site in charge) | 33.69 | Cu.mt. | 9,698.5 | ₹3,26,742.46 |
| 1.09 | Towards hiring charges of hydraulic machine per hour bases including the fuel charges for the removal of bamboos, debris and other unnecessary vegetation before the execution of works including all charges etc complete as directed by engineer-in-charge. (Including all the materials & labour charges etc. complete as direction by site in charge) | 60 | EACH | 1,000 | ₹60,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.32 MB
BOQ_974480.xls
BOQ • 0.26 MB
citi.pdf
Tender Documents • 3.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .