| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance | ₹3.4 L | L1 | Accepted-Finance BID RANK L1 |
| 2 | L2₹3.4 L+₹2,800.07 (0.83%)Rejected-Finance | ₹3.4 L+₹2,800.07 (0.83%) | L2 | Rejected-Finance BID RANK L2 |
| 3 | L3₹3.5 L+₹13,782.26 (4.06%)Rejected-Finance | ₹3.5 L+₹13,782.26 (4.06%) | L3 | Rejected-Finance BID RANK L3 |
Tender Value
₹3.8 L
EMD Value
₹7,600
Closing Date
17 Jul 2026, 10:00 amClosed
EE HPPWD DIVISION BHAWARNA
EE HPPWD DIVISION BHAWARN
SH Construction of Boundary wall) (Deposit work
2026_PWD_138435_10
2737-46 dated 06-07-2026 Bhawarna
Open Tender
Civil Works
Percentage
90 days
BHAWARNA
Please refer Tender documents.
13 documents required · 13 mandatory
₹350
₹7,600
22 Aug 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation, trenches etcetera in earth work involving all classification of soil such as pick work, pick jumper work, blasting work, soft or hard rocks including chiseling/wedging out of rocks where blasting work is prohibited or any other mixed variety of intermediate soil, dewatering and removal of slush if arrisen during course of construction and lifts upto all heights including stacking the excavated soil not more than three meters clear from the edge of the excavation and then returning the stacked soil in 15 cm (fifteen centimeters) thick layers when required into plinths, sides of foundation etcetera consolidating each deposited layer by ramming and watering and then disposing of all surplus excavation earth within all leads,lifts by any mode of transportation and other incidental, as per the direction and entire satisfaction of Engineer-In-Charge. Any loss to the private and public property during course of construction shall be absolute responsibility of the contractor. Rate inclusive royalty, malkana, toll tax, GST and other taxes imposed by the government. | 8.42 | Per Cubic metre | 250 | ₹2,105 |
| 2 | Providing and laying mechanically mixed and vibrated concrete for plain/ reinforced concrete in open foundation for all type of structure complete of plain cement concrete nominal mix 1:3:6 ( One cement : three sand : six graded crushed/ broken stone aggregate 20mm (twenty millimetre) nominal size on ground or under water and curing complete including pumping or bailing out water , dewatering removal of slush as required at site which may arise at the time of laying concrete complete for all heights/ depths including the cost of form work as per drawings and M.O.R.D. technical specification section 800, 900 and 1200 as per the direction of the Engineer-in-Charge . Including carriage of material within all leads and lifts and other incidental . The rate is including octrai, royality, Malkana. toll tax, sale tax, GST or other taxes imposed by the Government. | 14.72 | Per Cubic metre | 4,200 | ₹61,824 |
| 3 | Second class brick work using common burnt clay building bricks in cement mortar 1:6 (one cement isto six sand) in super structure upto all floor lavels as per PWD specification drawing and design and curing complete including curing complete scaffolding. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge. Rate inclusive toll tax, GST and any other taxes imposed by the government. | 2.95 | Per Cubic metre | 8,500 | ₹25,075 |
| 4 | Second class half brick work using common burnt clay building bricks in cement mortar 1:4 (one cement isto four sand) in super structure up to all floor level as per PWD specification, drawing and design and curing complete including scaffolding. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge. Rate is inclusive of toll tax, GST and any other taxes imposed by the government. | 105 | Per Square metre | 850 | ₹89,250 |
| 5 | 15mm (Fifteen milimetre) thick cement plaster in single coat on the rough side of brick/concrete/stone walls for exterior plastering upto any floor level including arrises, internal rounded angles, chamfers and/or rounded angles not exceeding 80mm (eighty millimetre) in girth, with cement mortar 1:6 (one cement isto six sand) complete including curing as per PWD specification including cost and carriage of material with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge. Rate is inclusive of toll tax, GST and any other taxes imposed by the government. | 304.98 | Per Square metre | 180 | ₹54,896.4 |
| 6 | Finishing wall with Apex weather proof exterior emulsion of Asian paint/ Nerolak Suraksha paint/ Berger paint/Dulux paint of approved brand and manufacture and of required shade on undecorated wall surfaces (Two or more coats) to give an even shade after thoroughly brushing the surface to remove all dirt, dust and remains of loose powdered material including cost and carriage of material with in all leads, lifts and other incidentals as per specificatins, approved drawing as per the direction and entire satisfaction of Engineer-in-Charge. Rate is inclusive of sale tax, toll tax, GST and any other taxes imposed by the government. | 304.98 | Per Square metre | 90 | ₹27,448.2 |
| 7 | Steel work welded in built up sections trusses and frame work including cutting hoisting and fixing in position and applying a primer coat of red lead paint in In gratings framed guard bars,ladders,railling,brackets and similar works. and the like. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge. Rate inclusive toll tax, GST and any other taxes imposed by the government. | 1,194.88 | Per kilogram | 95 | ₹1,13,513.6 |
| 8 | Painting two coats (excluding priming coat) on new steel surfaces with Dulux Multi Surface paint of required shade applied at the rate of 0.90 ltr/10 sqm (zero decimal nine zero litre per ten square metre) over an under coat of primer applied at the rate of 0.80 ltr/ 10 sqm (zero decimal seven five litre per ten square metre) including cleaning the surfaces of all dirt, dust and other foreign matters and sand papering and knotting as per PWD specification including cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-in-Charge. Rate is inclusive of toll tax, GST and any other taxes imposed by the government. | 49.12 | Per Square metre | 120 | ₹5,894.4 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
Tendernotice_2.pdf
PDF • 0.61 MB
SBD10.pdf
Tender Documents • 5.56 MB
BOQ_205099.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .