Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹43.5 LAccepted-Finance | L-1 | Accepted-Finance Admitted | |
| 2 | L-2₹48.4 L+₹4.9 L (11.3%)Accepted-Finance | L-2 | Accepted-Finance Admitted | |
| 3 | L-3₹54.0 L+₹10.5 L (24.1%)Accepted-Finance 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | L-3 | Accepted-Finance Admitted | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹43.5 L
EMD Value
₹44,000
Closing Date
19 Jun 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle, 220 KV S/S Campus Natwa, Mirzapur
Increasing capacity of (2x40) to (2x40 1x63) MVA at 132 KV S/S Aurai under ETD-IV Varanasi
2023_UPTCL_809500_1
short term e-T. No. 13/2023-24/ETC/Mzp
Open Tender
Electrical Works
Fixed-rate
90 days
Aurai
As per tender specification
2 documents required · 2 mandatory
₹1,770
Executive Engineer, ETD, Mirzapur
₹44,000
17 Aug 2023
6 Jun 2023
20 Jun 2023
6 Jun 2023
19 Jun 2023
6 Jun 2023
Amount
Shifting, erection, centrifuging of oil, earthing and commissioning and other associated works of new 132/33 KV, 63 MVA T/F at 132 KV Sub station Aurai
Shifting of new 63 MVA T/F from unloading place to plinth (up to 20 Meter distance) Including turning of tank, if required, including all T&P and work required to complete the job satisfactorily along with all accessories from unloading place to near T/F erection site.
Additional shifting of 63 MVA T/F for 100 meter @ 5 Meter/job.
Complete Erection of 63 MVA T/F by erection of rediators, conservator tank, all bushing with their turrests, connecting oil pipe, cooling fans, motor drive mechanism with tap changer, RTCC panel, and associated oil pipe line etc. to complete the job satisfactorily including first filling of oil and topping up of T/F oil in tank, radiator pipe lines, conservator tank etc. and attending oil leakage, if any and all other associated work for satisfactory completion of work along with arrangement of labour and T&P to complete the job in all respect. (Hydra, crane, special tools, will be arranged by contractor)
Raising the height of 3 Nos. ALP structure for 30 KV LA after dismantling of LA and structure and againg its erection, replacement of all the Panther conductor, jumpering of 33 KV side of 63 MVA, 132/33 KV T/F from 33 KV Bushing to 33 KV Bus Bar with ACSR Moose conductor, fixing of all the isolator clamps, CB clamps, LA clamps, CT clamps suitable for proper size of Moose conductor and jumpering of all the 33 KV side equipment.
Laying termination of new control cables for 63 MVA T/F from control and relay panel of marshalling box/equipment JB etc. for new 63 MVA T/F as per cable schedule and inter connection with control cable at marshalling box and OLTC panel to RTCC panel to each fan with re-ferruling and re-dressing with proper glang & ferrule etc as per drawing schedule.
Centrifuging of complete 63 MVA T/F oil in T/F & Tank by connecting Centrifuging pipes, circulating the T/F oil through centrifuging machine to be provided by the contrator & taking the BDV value of the oil periodically till the required value is achieved as per direction of supervising engineer all T&P, labour and centrifuging machine shall be provided by the contractor.
Earthing of erected 63 MVA T/F main tank, neutral bushing, marshaling box, OLTC, RTCC panel etc at two points using 75x10/50x6mm. M.S. flat (MS flat and earthing electrodes shall be provided by the contractor) the above also includes painting of earthing strip with one coat of red oxide primer and two coat of bus green synthetic enamled paint.
Delta earthing of 63 MVA T/F HV/LV neutral bushing with 70x10 mm M.S. Flat and earthing electrode shall be provided by contractor on his own cost th above also includes painting of earthing strip with one coat of red oxide primer and two coat of bus green synthetic enamled paint.
Raising the height of 3 Nos. ALP structure for 30 KV LA after dismantling of LA and structure and its erection.
Carriage of 20 KL oil tanker/drum for the centrifuging of transformer oil where it is available within distance of 100 km approx.
Conducting BDV, PPM and DGA tests of transformer oil 63 MVA T/F job includes 03 nos. sample collectiong of T/F oil in suitable container tank and its transportation to NABL and submitting its test report. First job after completiong of work land second job after charging of 15 days.
Shifting & Reconstruction of 132 KV Aurai-Bhadohi Bay for Utilization of new 63 MVA T/F Bay and constrution of 132/33 KV Transformer bay at 132 KV S/S Aurai
Dismentling of different equipments by way of opening of Jumpers,Cable connection, Earthing etc & shifting from dismentaled place to working place including all cost of men material and T & P.
132 KV C.T with Junction Box
132 KV P.T/C.V.T with Junction Box
Line Matching Unit
Galvenized Substation Structure (BCT-7 No.,ALP-3 No.BBL-2 No.)
Destringing of conductor from Dead end tower to Gantry of R,Y & B phase
Opening of jumpers from bus to various equipment and equipment to quipment like CT, PT, LA etc.
Erection of S/S Structure (BBL-2 No.,BCT-6 No.,ALP-3 No.) etc at 132 KV S/S Aurai. The job includes shifting of all material from store to site then erection of structure as per drawing using proper size of nuts bolts and washer which will be provided by UPPTCL all men and T&P require for satisractory completion of work shall be arranged by the contractor.
Stringing of ACSR Panther conductor from Dead end tower to Gantry of R,Y & B phase. The job includes are, fitting of all tension clamp, hosting of insulators and proper clamping jointing jumpering etc.(Rates include all labour and T&P Charges but excluding cost of all material such as conductor,insulator, clamps hardware fitting etc. which shall be provided by UPPTCL)
Erection of following new equipment as per instruction manual of various equipments including its shifting from the store to the side job including other associated works to complete the job satisfactorily
132 KV Circuit Breaker
132 KV PT with juntion box
132 KV Current transformer with juntion box
132 KV BI/LI
Jumpring of equipmet by ACSR panther conductor including shifting of conductor from store to the site its straightening bending and cutting as per site requipment.
Earthing of structure and equipment by 50x6 mm size MS Flat (to be provided by the contractor on his owen cost) including cutting straightening bending laying 800 mm below inside the ground with main earth MT including painting of joints with non corrosive paint on flat. Painting at the flat on structure with the green paint after one coat of red oxide primer and back filling of excavated trench along with proper ramming and all associated work.
Laying of following size of unarmoured control cable in the cable trench from the control relay panel to the various equipment hunction box etc. in swithcyard as per cable schedule, its saddling proper distance with AI. Saddle of size 25x3 mm including carriage of cable drums from the store to the laying site and other associated work to complete the job satisfrctory.
Termination of following size control cables as laid above as per cable schedule including making necessary holes in glands plate of box wherever required Supply and fixing of cable glands ferrule of appropeiate size and no. respectively for each core of cable and its termination with crimping type lugs and all associated work to complete the job satisfactory.(2C X 2.5 mm2+4C X 2.5 mm2+6C X 2.5 mm2)
Constrution of 132 /33 KV Transformer bay
Sorting, counting & shifting of various type Galv. S/S Structure from stacking place to loading place and loading on private vehicle ( to be provided by contractor) at EFU Naini Prayagraj to 132 KV S/S Aurai distance approx 85 Km, unloading and stacking at proper vplace as per instruction of JE/SDO including all cost of man, materials and T&P for completion the job.
Erection of S/S Structure (DKR-1 No.,ABR-1 No.,BCT-3 No.,ALP-9 No.,ABL-1 No.,YMR-1 No.,APR-1 No., BBL-1 No., BTI-1 No.) etc at 132 KV S/S Aurai. The job includes shifting of all material from store to site then erection of structure as per drawing using proper size of nuts bolts and washer which will be provided by UPPTCL all men and T&P require for satisractory completion of work shall be arranged by the contractor.
Stringing of 132 KV Jack Bus bar (R,Y,B) with ACSR Moose conductor of span length 30 Mtr from 63 MVA transformer bay. The job includes are, fitting of all tension clamp, hosting of insulators and proper clamping jointing jumpering etc.(Rates include all labour and T&P Charges but excluding cost of all material such as conductor,insulator, clamps hardware fitting etc. which shall be provided by UPPTCL)
Erection of following new equipment as per instruction manual of various equipments including its shifting from the store to the side job including other associated works to complete the job satisfactorily
132 KV Current transformer with junction box
132 KV Circuit Breaker with structure
132 KV BI & TI
33 KV CT with JB
33 KV Circuit Breaker
Transformer C & R Panel
RTCC Panel
Apex Metering Panel
Jumpring of equipmets by ACSR panther conductor including shifting of conductor from store to the site its straightening bending and cutting as per site requipment.
Earthing of structure and equipment by 50x6 mm size MS Flat (to be provided by the contractor on his owen cost) including cutting straightening bending laying 800 mm below inside the ground with main earth MT including painting of joints with non corrosive paint on flat. Painting at the flat on structure with the green paint after one coat of red oxide primer and back filling of excavated trench along with proper ramming and all associated work.
Laying of following size of unarmoured control cable in the cable trench from the control relay panel to the various equipment hunction box etc. in swithcyard as per cable schedule, its saddling proper distance with AI. Saddle of size 25x3 mm including carriage of cable drums from the store to the laying site and other associated work to complete the job satisfrctory.
Termination of following size control cables as laid above as per cable schedule including making necessary holes in glands plate of box wherever required Supply and fixing of cable glands ferrule of appropeiate size and no. respectively for each core of cable and its termination with crimping type lugs and all associated work to complete the job satisfactory.(2C X 2.5 mm2+4C X 2.5 mm2+6C X 2.5 mm2+10C X 2.5 mm2)
Construction of 33 KV Transfer Bus & various bus bar strengthening work at 132 KV S/S Aurai.
A-Supply
Bolted type tension gun fitting suitable for twin Moose conductor with nut bolt & washer
Bolted type tension gun fitting suitable for single Moose conductor with nut bolt & washer
Spacer for Moose to Moose
PG Clamp for Moose to Moose
PG Clamp for Moose to Panther
PG Clamp for Panther to Panther
33 KV P.I clamp for Moose conductor
132 KV Isolator clamp for twin Panther
132 KV C.T clamp for twin Panther
132 KV C.B clamp for twin Panther
33 KV Isolator clamp for twin Panther
33 KV C.B clamp for twin Panther
33 KV C.T clamp for twin Panther
30 KV L.A clamp for twin Moose
33 KV C.B clamp for twin Moose
33 KV Isolator clamp for twin Moose
33 KV C.T clamp for twin Moose
B-Work
The following works are to be carried out for strengthing of 132 KV Main Bus Bar 1 & 2 and 33 KV Main Bus Bar at 132 KV S/S Aurai.
(i) 132 Main Bus bar I & II
Dismanteling of all jumpers of ACSR Moose/Panther Conductor from 132 KV Bus to all equipment and equipment to equipmnt.
Dismanteling of existing 132 KV Bus Bar of ACSR Moose/Panther conductor along with Tension fitting and Disc Insulators including shifting and proper stacking of Dismanteled materials in the store of 132 KV S/S Aurai.
Stringing of new Bus Bar of twin Moose conductor and tightening with gantry along with hoisting, clamping and fixing of all hardware and fittings including all other associated work
Fixing of spacer clamps at an equal interval between both moose conductor of twin Bus bar.
Fixing and tightening of twin Panther jumpers with suitable spacer from 132 KV Bus to all equipment.
(ii) 33 KV Main Bus bar
Dismanteling of all jumpers of ACSR Moose/Panther Conductor from 33 KV Bus to equipment and equipmnt to equipmnt.
Dismanteling of Existing 33 KV Bus Bar of ACSR Moose/Panther conductor along with Tension fitting and Disc Insulators including shifting and proper stacking of Dismanteled materials in the store of 132 KV S/S Aurai.
Stringing of new Bus Bar of twin Moose conductor and tightening with gantry along with hoisting, clamping and fixing of all hardware and fittings including all other associated work.
Fixing of spacer clamp at an equal interval between both Moose conductors of twin Bus bar.
Fixing and tightening of twin Panther jumpers with suitable spacer from 33 KV Bus to all equipment.
Fixing and tightening of twin Moose jumpers with suitable spacer from T/f L.V Bushing to all equipment and 33 KV Bus.
Dismentaling of Old and Unservicable 33 KV Transfer Bus made on Rail Pole Structure by way of Dismentaling of 33 KV Bus Bar of two section,Dismentaling of Six no. Rail Poles and shifting the material fron site to store
Modification of CCR Structure by dismentaling of Pick and Earth wire for height Raising minimum 1.5 m with the help of old & used off sizes gelvenized structure at 10 Nos. CCR Structure and then installaton of peak and stringing of earth wire (off sizes GI structure will be provided by department) including all cost of men,material and T & P.
Dismentaling of CGR Beam by way of dismentaling of conductor and Erection of Beam at modified place of CCR, and stringing of conductor at the same Beam.
Erection of S/S Structure (CCR-6 No.,CGR-3 No.,TMR-6 No.,CPR-6 No.,ALP-9 No., No.,BTI-3 No.,ABL-9 No.) etc at 132 KV S/S Aurai. The job includes shifting of all material from store to site then erection of structure as per drawing using proper size of nuts bolts and washer which will be provided by UPPTCL all men and T&P require for satisractory completion of work shall be arranged by the contractor.
Stringing of 33 KV Bus bar of ACSR moose conductor. The job includes of cutting of ACSR moose conductor of suitable size and stringing with the help of tension gun fitting and disc insulator including all cost of men and T&P for competion of above work.
Jumpering from ACSR Panther conductor of suitabl size from line isolator to bus isolator,bus isolator to Transfer bus and Bus Isolator to outgoing conductor of Nine No. Bays
Earthing of Various structure & various Equipment with the help of 50x6 mm MS Flat, Excavation of earth upto 0.6 Mtr below the ground level. Cutting and welding with earth mat with all cost of T&P and man power including cost of MS flat. Painting with one coat of red oxide primer and two coats of synthetic enameled paint.
Dismantling & Reconstruction of 33 KV, 2X5 MVAR Capacitor Bank for utilization of New 63 MVA T/F Plinth at 132 KV S/S Aurai
A-Supply
Bolted type tension gun fitting suitable for single Moose conductor with nut bolt & washer
PG Clamp for Moose to Moose
PG Clamp for Moose to Panther
PG Clamp for Panther to Panther
post insulator clamp for Moose
B-Work
Dismentaling of 33 KV 2x5 MVAR Capacitor Bank Shreem Make Complete Comprises with following Equipments & Shifting to store and stacking properly including all cost of men material and T & P.
33 KV Reactor
33 KV NCT
33 KV Isolator
33 KV,2x5 MVAR Capacitor bank with Structure
33 KV C.B with Structure
BKR(2 No.),ABR(2 No.),ALP(5 No.),ABL(3 No.) Substation Structure
Dismentaling of jumpers(ACSR Panther) from bus to equipment and equipmnt o quipment.
Destringing of 33 KV Bus Bar(Moose Conductor) Length 30 mtr of R,Y & B phase
Stringing of 33 KV Bus bar of R,Y& B-phase for construction of 2x5 MVAR Capacitor bank .
Erection of S/S Structure (EKR-4 No.,BBR-2 No.,YMR-4 No.,APR-4 No.ALP-48 No.) etc at 132 KV S/S Aurai. The job includes shifting of all material from store to site then erection of structure as per drawing using proper size of nuts bolts and washer which will be provided by UPPTCL all men and T&P require for satisractory completion of work shall be arranged by the contractor.
Construction of 33 KV Bus bar for extension from existing 33 KV Bus bar to proposed constructed 33 KV Capacitor Bank place(distance approximate 50 mtr) by using of ALP Substation Structure and Post Insulator.
Erection of following Equipments:
33 KV CB with Structure
33 KV Bus Isolator
33 KV CT with junction box
33 KV PT with junction box
33 KV Line Isolator
33 KV 1x5 MVAR capacitor cells I/C structure
33 KV Series Reactor
33 KV NCT
Jumpering of equipments between Bus bar to BSI, BSI to CB, CB to CT, CT to LSI and capacitor bank and NCT by twin/single ACSR panther conductor
Earthing of equipments and various structure at two places one is structure and other is equipment including laying of 50x6 mm MS Flat, Excavation of earth upto 0.6 Mtr below the ground level. Cutting and welding with earth mat with all cost of T&P and man power including cost of MS flat. Painting with one coat of red oxide primer and two coats of synthetic enameled paint.
Laying of following control cables
Termination of cable as per drawing including lugging and feruling the all required material, labour & T&P shall be arranged by contractor at his own cost. (2x2.5mm2+4x2.5mm2+6x2.5mm2)
Meena Elect & Engg. Works
Hi-tech power transmission
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .