NAVEEN RATHEE
ED - Ambala
Construction of 4 Lane road from Urnai Sainsa road to Urnai Temple (ID 7871) including decorative lights in Distt. Kurukshetra (CM Announcement Code no. 26037 dated 06.04.2022)
2025_HRY_478732_1
202569AEC3B7 157A 4C0E 8F0B 52140B74254C663BAR
Open Tender
Civil Works
Works
160 days
Ambala
Construction of 4 Lane road from Urnai Sainsa road to Urnai Temple (ID 7871) including decorative lights in Distt. Kurukshetra (CM Announcement Code no. 26037 dated 06.04.2022)
2 documents required · 2 mandatory
₹1,000
₹24,160
Yes
17 Oct 2025
17 Oct 2025
24 Oct 2025
18 Oct 2025
24 Oct 2025
18 Oct 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Executive Engineer Electrical Division PWD B&R Br., Ambala Cantt
Name of Work: Construction of 4 Lane road from Urnai Sainsa road to Urnai Temple (ID 7871) including decorative lights in Distt. Kurukshetra (CM Announcement Code no. 26037 dated 06.04.2022).
Estimated Cost Rs. 12.08 lacs
Name of the Bidder/ Bidding Firm / Company :
Sl. No. HSR Items / Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder in Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 `SITC of T/F Plate Farm set without J Bolt required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` BI01010001010000000000000515BI0100001113 2 Each 1 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2 `SITC of Pcc Pole 11 Meter Long required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` BI01010001010000000000000515BI0100001114 26 Each 2 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
3 `SITC of ACSR 50mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` BI01010001010000000000000515BI0100001115 1200 Kg. 3 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
4 `SITC of Stay Set 8`Long with Elow and Nuts with X plate required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` BI01010001010000000000000515BI0100001116 13 Each 4 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
5 `SITC of Stay Wire 7/8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001117 130 Kg. 5 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
6 `SITC of GSL No 8 SWG required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001118 180 Kg. 6 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
7 `SITC of 11 KV Pin insulator with Pin required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001119 21 Each 7 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
8 `SITC of 11 KV Disc insulator with Fitting required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001120 21 Each 8 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
9 `SITC of V-Shape X-Arm 75X40mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001121 3 Each 9 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
10 `SITC of Top Hamper required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001122 3 Each 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
11 `SITC of G.I. Channel 75X40mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001123 200 Kg. 11 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
12 `SITC of MS Channel 100X50x6mm 3350mm (for H-Pole) required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001124 4 Each 12 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
13 `SITC of G.I. Angel Iron 50X50x6mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001125 180 Kg. 13 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
14 `SITC of MS Angel Iron 50X50x6mm 2400, (for earth Angle) required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001126 4 Each 14 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
15 `SITC of MS Flat 50X6mm required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001127 160 Kg. 15 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
16 `SITC of MS Nuts and Volts All Sizes required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001128 160 Kg. 16 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
17 `SITC of Number Plate required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001129 11 Each 17 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
18 `SITC of Earthing with earth rod required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001130 4 Each 18 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
19 `SITC of 11 KV G.O. Switch Comp. 11mtr. Pole required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001131 2 Each 19 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
20 `SITC of Lighting Arrestor required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001132 6 Set 20 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
21 `SITC of Barbed Wire required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001133 11 Kg. 21 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
22 `SITC of PG Clamp for 50 / 80mm2 ACSR required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001134 24 Each 22 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
23 `SITC of LT Insulator required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001135 60 Each 23 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
24 `SITC of D-Strap required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001136 60 Each 24 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
25 `SITC of Aluminium Thimble 185 mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001137 40 Each 25 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
26 `SITC of LT Fuse Unit required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001138 2 Each 26 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
27 `Erection of 25/63KVA T/F With PM S/Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001139 1 Each 27 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
28 `Erection of 100KVA T/F With PM S/Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001140 1 Each 28 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
29 `Erection of H-Pole with 2no. Stay (11Mtr.) complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001141 4 Each 29 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
30 `Erection of GSL GURD complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001142 70 Each 30 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
31 `Erection of Gurding Angle complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001143 4 Each 31 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
32 `Erection of Three Phase Meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001144 4 Each 32 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
33 `Erection of Single Phase Meter with MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001145 28 Each 33 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
34 `Erection of 4C Cable up to 20 Mtrs. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001146 4 Each 34 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
35 `Erection of 3 Phase MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001147 4 Each 35 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
36 `Erection of 2C PVC up to 30 Mtrs. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001148 28 Each 36 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
37 `Dismantle of 25/63KVA T/F With PM S/Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001149 1 Each 37 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
38 `Dismantle of 100KVA T/F With PM S/Station complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001150 1 Each 38 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
39 `Dismantle of PCC Pole 9 meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001151 18 Each 39 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
40 `Dismantle of Three Phase Meter complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001152 4 Each 40 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
41 `Dismantle of Single Phase Meter with MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001153 28 Each 41 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
42 `Dismantle of H-Pole with 2no. Stay (9/11Mtr.) complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001154 4 Each 42 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
43 `Dismantle of LT S/C Cable 95 mm2 complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001155 2700 Metre 43 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
44 `Dismantle of ACSR 50mm complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001156 1120 Metre 44 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
45 `Dismantle of 3 Phase MCB complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001157 4 Each 45 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
46 `Dismantle of 4C Cable up to 20 Mtrs. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001158 4 Each 46 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
47 `Dismantle of 2C PVC up to 30 Mtrs. complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001159 28 Each 47 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
48 `Fabrication Charge for Steel items i/n Painting and Transportation Charges complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work ( As per UHBVN Specification ). ` ` BI01010001010000000000000515BI0100001160 380 Kg. 48 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
49 `Cost of painting of PCC pole i.e. pole number, feeder name in black colour on 8 inch yellow circular background including cost of paint and labour charges to complete the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work. ` ` BI01010001010000000000000515BI0100001161 26 Each 49 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
50 `SITC of LT 4/C Cable 25 mm2 required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work make : Havells / KEI / Polycab ( As per UHBVN Specification ). ` BI01010001010000000000000515BI0100001162 60 Metre 50 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
51 `SITC of LT S/C Cable 95mm2 Arm. required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work make : Havells / KEI / Polycab ( As per UHBVN Specification ). ` BI01010001010000000000000515BI0100001163 2700 Metre 51 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
52 `SITC of 2/C PVC 10mm2 Arm. Cable required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work make : Havells / KEI / Polycab ( As per UHBVN Specification ). ` BI01010001010000000000000515BI0100001164 300 Metre 52 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
53 `SITC of 2/C PVC 10mm2 Un-Armd Cable required to the complete including labour the job in all respect up to entire satisfaction of the Engineer-in-Charge of the work make : Havells / KEI / Polycab ( As per UHBVN Specification ). ` BI01010001010000000000000515BI0100001165 500 Metre 53 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_556690.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .