Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC | ₹5.9 L Quoted ₹7.0 L | L1 | Accepted-AOC QUOTED RATE BELOW ESTIMATE RATE |
| 2 | L2₹7.4 L+₹35,067 (5.00%)Rejected-AOC GURU KRIPA ADUKKATHBAYAL NORTH BEACH KASARAGOD | KASARAGOD | KASARAGOD | KERALA | ₹7.4 L+₹35,067 (5.00%) | L2 | Rejected-AOC QUOTED RATE ABOVE 5 PERCENTAGE |
Tender Value
₹5.9 L
EMD Value
₹14,900
Closing Date
5 Jun 2026, 5:00 pmClosed
The Executive Engineer, PMU,KSD
Office of the Executive Engineer, Project Management Unit, Vydhyuthi Bhavanam, Vidhyanagar, Kasaragod 671123
REPLACING 11 KV OH LINE WITH ABC IN THICKLY VEGITATED AREA AT PANATHUR-PUTHURADUKAM UNDER ELECTRICAL SECTION,BALANTHODE
2026_KSEB_851583_1
07/26-27/EE/PMU/KSD dt 16-05-2026
Open Tender
Electrical Works
Percentage
90 days
BALANTHOD
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,416
₹14,900
23 Jul 2026
18 May 2026
9 Jun 2026
19 May 2026
5 Jun 2026
20 May 2026
20 May 2026 - 5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Erection of suspension clamp for 11KV ABC of any size | 45 | E | 164.67 | ₹7,410.15 |
| 2 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles | 1,500 | m | 45.62 | ₹68,430 |
| 3 | Fiting One No MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable | 15 | E | 193 | ₹2,895 |
| 4 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or other terminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers. | 6 | E | 370 | ₹2,220 |
| 5 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size | 72 | E | 164.67 | ₹11,856.24 |
| 6 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. | 4 | No | 564.55 | ₹2,258.2 |
| 7 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. | 4 | No | 4,245.59 | ₹16,982.36 |
| 8 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. | 4 | No | 2,266.55 | ₹9,066.2 |
| 9 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. | 15 | No | 1,086.23 | ₹16,293.45 |
| 10 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | 15 | Trip | 3,142.26 | ₹47,133.9 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1438863.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_1438863.xls
BOQ • 0.28 MB
TenderDocument.pdf
Tender Documents • 0.59 MB
BIDDERDEAILS.pdf
Other Document • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .