| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC AGREEMENT EXECUTED | |
| 2 | L2₹2.5 L+₹1,271.71 (0.50%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Saidalavi K L2 | ABOOBACKER P.T. L1 |
|---|---|---|---|---|---|
| 1.00maintenance work | |||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 12 | hour | 317.38 ₹3,808.56 | 315.79 ₹3,789.48 Lowest |
| 1.00 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 186.52 | sqm | 283.79 ₹52,931.38 | 282.37 ₹52,666.52 Lowest |
| 1.00 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 4.88 | cum | 9,044.99 ₹44,094.33 | 8,999.77 ₹43,873.88 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 292.5 | kilogram | 103.26 ₹30,203.55 | 102.74 ₹30,051.45 Lowest |
| 1.00 | OD522217/2025-2026:Supplying and filling 10- 11.20 mm metal including all cost of materials, labour charges etc. | 19.78 | cum | 2,843.29 ₹56,245.96 | 2,829.07 ₹55,964.66 Lowest |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 240 | kg | 163.89 ₹39,333.6 | 163.07 ₹39,136.8 Lowest |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.5 | cum | 7,870.91 ₹11,806.37 | 7,831.56 ₹11,747.34 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 35.72 | sqm | 339.63 ₹12,132.94 | 337.93 ₹12,072.21 Lowest |
| 1.01 | 13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 21.98 | sqm | 158.79 ₹3,490.2 | 158 ₹3,472.84 Lowest |
Tender Value
₹2.5 L
EMD Value
₹6,351
Closing Date
17 Mar 2026, 6:55 pmClosed
ASSISTANT ENGINEER
O/o ASSISTANT ENGINEERLID EWSECTION PULPATTA GP
Annual Plan-2025-26 Improvements to Vattakandathil Ummanchola Well in pulpatta GP-139/25-26-General Civil Work
2026_LSGD_845517_2
09/ET/AE/PPT/25-26
Open Tender
Civil Works - Others
Item Rate
240 days
PULPATTA
Please refer Tender documents.
8 documents required · 8 mandatory
₹560
₹6,351
20 May 2026
10 Mar 2026
19 Mar 2026
10 Mar 2026
17 Mar 2026
10 Mar 2026
maintenance work
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural sources derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD522217/2025-2026:Supplying and filling 10- 11.20 mm metal including all cost of materials, labour charges etc.
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1428133.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_1428133.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 2.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .