Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.9 LAccepted-AOC | L1 | Accepted-AOC Accepted being L1 | |
| 2 | L2₹35.9 L+₹2.5 L (7.46%)Rejected-Finance 18 1 SABJI MAHAL ORDERLY BAZAR PO BARRACKPORE DIST 24 PARGANAS N KOLKATA 700120 WB | 24 PARAGANAS NORTH | WEST BENGAL | 700120 | L2 | Rejected-Finance Rejected being higher than L1 | |
| 3 | L3₹36.4 L+₹3.0 L (8.95%)Rejected-Finance | L3 | Rejected-Finance Rejected being higher than L1 | |
| 4 | L4₹37.0 L+₹3.6 L (10.7%)Rejected-Finance | L4 | Rejected-Finance Rejected being higher than L1 | |
| 5 | L5₹37.5 L+₹4.1 L (12.3%)Rejected-Finance | L5 | Rejected-Finance Rejected being higher than L1 |
| Sl No | Description | Qty | Unit | ZENITH CONSTRUCTION L2 | KUMAR ENTERPRISE L8 | Das and Brothers L6 | M/S. NARSINGH ENGINEERING L5 | SARKAR AND COM L1 | PIONEER L7 | BISWAS CONSTRUCTION L3 | BHAUMIK CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water etc. and removal of rubbish from the site complete all as specified and as directed. | 300 | Sqm | 75 ₹22,500 | 78 ₹23,400 | 80 ₹24,000 | 77 ₹23,100 | 62 ₹18,600 Lowest | 83 ₹24,900 | 74 ₹22,200 | 80 ₹24,000 |
| 2.00 | Dismantling of wall and ceiling boards (fibre, pulp, insulation, etc) or insulation boards / slabs / blankets any thickness, including cover fillet / snap grid complete all as specified and directed. | 150 | Sqm | 42 ₹6,300 | 42 ₹6,300 | 45 ₹6,750 | 46 ₹6,900 | 38 ₹5,700 Lowest | 43 ₹6,450 | 41 ₹6,150 | 45 ₹6,750 |
| 3.00 | Demolition of brick work or stone boulder masonry, built in cement mortar including all quoins, arches, pillars etc. including removing of unserviciable bricks and debris from site complete all as specified and directed. | 4.88 | Cum | 730 ₹3,562.4 | 725 ₹3,538 | 730 ₹3,562.4 | 733 ₹3,577.04 | 720 ₹3,513.6 Lowest | 733 ₹3,577.04 | 725 ₹3,538 | 740 ₹3,611.2 |
| 4.00 | Demolition of cement concrete (un-reinforced) of any description and in any position including removing debris from site of work complete all as specified and directed. | 9.5 | Cum | 900 ₹8,550 | 892 ₹8,474 | 899 ₹8,540.5 | 892 ₹8,474 | 860 ₹8,170 Lowest | 915 ₹8,692.5 | 890 ₹8,455 | 910 ₹8,645 |
| 5.00 | Demolition of reinforced cement concrete from roofs, floors (other than ground floors), beams, staircases, landing, chajjas and similar suspended work of any description including reinforcement cut as required to facilitate demolition and removing debries from site of work complete all directed. | 2 | Cum | 955 ₹1,910 | 952 ₹1,904 | 990 ₹1,980 | 962 ₹1,924 | 950 ₹1,900 Lowest | 983 ₹1,966 | 950 ₹1,900 Lowest | 952 ₹1,904 |
| 6.00 | Dismantling of wrought iron or mild steel work of any description not otherwise provided and removing materials from site complete all as specified and as directed. | 6.55 | Qtl | 690 ₹4,519.5 Lowest | 691 ₹4,526.05 | 699 ₹4,578.45 | 690 ₹4,519.5 Lowest | 690 ₹4,519.5 Lowest | 713 ₹4,670.15 | 692 ₹4,532.6 | 695 ₹4,552.25 |
| 7.00 | Dismanting of plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings complete all as specified and directed. | 275 | Sqm | 40 ₹11,000 | 42 ₹11,550 | 49 ₹13,475 | 45 ₹12,375 | 35 ₹9,625 Lowest | 43 ₹11,825 | 42 ₹11,550 | 45 ₹12,375 |
| 8.00 | Material and labour for mild steel TMT bar 10 mm dia and over cut to length bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed. | 125 | Kg | 162 ₹20,250 | 162 ₹20,250 | 170 ₹21,250 | 168 ₹21,000 | 140 ₹17,500 Lowest | 174 ₹21,750 | 165 ₹20,625 | 170 ₹21,250 |
| 9.00 | Material and labour for RCC (1:2:4) (nominal mix) type B1 (using 20mm graded stone aggregate) in slabs supported on walls, beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves and the like complete all as specified and directed. | 2 | Cum | 9,000 ₹18,000 | 9,005 ₹18,010 | 9,002 ₹18,004 | 9,015 ₹18,030 | 8,920 ₹17,840 Lowest | 9,663 ₹19,326 | 9,010 ₹18,020 | 9,010 ₹18,020 |
| 10.00 | Material and labour for form work to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work; not exceeding 200mm thick (Horizontal or slopping) with rough finished flat surfaces of concrete complete all as specified and directed. | 10 | Sqm | 360 ₹3,600 Lowest | 531 ₹5,310 | 539 ₹5,390 | 533 ₹5,330 | 520 ₹5,200 | 533 ₹5,330 | 530 ₹5,300 | 540 ₹5,400 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
1 Nov 2025, 6:00 pmClosed
GE AF Barrackpore
GE AF Barrackpore Post Barrackpore Dist 24 Parganas North Kolkata 700120
MAINTENANCE AND REPAIR TO ROOF TREATEMENT, EXTERNAL PLASTER, DAMAGED RCC/PCC, ROOF SHEETS, FALSE CEILING ETC UNDER VARIOUS MD/OTM ACCOMODATION UNDER AGE B/R-II OF AF BARRACKPORE UNDER GE (AF) BARRACKPORE
2025_MES_734845_1
8649/BKP/AF OF 2025-26
Open Tender
Civil Works
Item Rate
240 days
GE AF Barrackpore
Class-D,
Category-a(i)
2 documents required · 2 mandatory
₹500
GE AF Barrackpore
₹60,000
Yes
22 Nov 2025
11 Oct 2025
3 Nov 2025
11 Oct 2025
1 Nov 2025
25 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tenderdoc8649.pdf
Tender Documents • 1.09 MB
BOQ_822846.xls
BOQ • 1.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .