Tender Value
₹30.3 L
EMD Value
₹31,000
Closing Date
13 Nov 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Sujlam Suflam Spreading Channel Dn.No.1, Himatnagar
Constructing Foot-Bridge at Ch. 83.705 Km of Sujlam Suflam Spreading Canal.
360497
09 of Year 2026-27
Open
Civil Works
Works
Sabarkantha
9 documents required · 9 mandatory
₹1,500
The Executive Engineer, Sujlam Suflam Spreading Channel Dn.No.1, Himatnagar
₹31,000
30 Oct 2026
30 Oct 2026
30 Oct 2026
13 Nov 2026
30 Oct 2026
120 days
BILL OF QUANTITIES
: : SCHEDULE - B : :
Name of Work :- Constructing Foot-Bridge at Ch. 83.705 Km of Sujlam Suflam Spreading Canal.
MEMORANDUM SHOWINGTHE DETAILS OF ITEM OF WORKS TO BE CARRIED OUT
Item Estimated Unit Item of works Estimated Rates in Rs. AMOUNT
In figure In words Rs - Ps
1 62.00 CM Item No. 1 :: 1155.20 Rupees One
Dismantling the existing foundation concrete including Thousand One
sorting out the dismentalled stuff and stacking the useful Hundred Fifty Five
material, removing the debris and making good the damages and Paisa Twenty
etc. complete as and where directed. Cement Concrete only
2 620.00 SMT Item No. 2 :: 72.80 Rupees Seventy
Trimming of the canal section manually for preparing Two and Paisa
subgrade for laying cement concrete lining in all sorts of soil Eighty only
and murrum including watering and compacting bed etc.
3 1050.00 CM Item No. 3 :: 107.80 Rupees One
Excavation for foundation in all sorts of soil including yellow Hundred Seven and
sandy gravelly soils ,soft & hard murrum etc. in dry condition Paisa Eighty only
including depositing the excavated stuff in uniform layers in banks
or as and where directed etc. complete for lead up to 500m and all
lift. (BY MACHINERY)
Including dewatering.
4 40.00 cmt Item No. 4 :: 249.20 Rupees Two
Excavation for foundation in Soft Rock including depositing the Hundred Forty
excavated stuff as and where directed etc. complete for lead upto Nine and Paisa
500m and all lift. (Machinery) Twenty only
Including dewatering.
5 11.00 cmt Item No. 5 :: 382.90 Rupees Three
Excavation for foundation in Hard Rock including blasting and Hundred Eighty
chiseling if necessary sorting out and stacking separately the Two and Paisa
usable rubble, depositing the excavated stuff as and directed Ninety only
including backfilling trenches with suitable excavated stuff etc.
complete for lead upto 500 m. and all lifts. (Machinery)
Including dewatering.
6 260.00 cmt Item No. 6 :: 144.50 Rupees One
Earthwork/Back filling with selected earth including watering Hundred Forty
ramming,Compaction with pnuematic temping with all lead and Four and Paisa
all lift etc complete. Fifty only
7 7.00 cmt Item No. 7 :: 3935.00 Rupees Three
Providing & Laying in position "NOMINAL MIX" cement Thousand Nine
concrete using cement, sand and crushed aggregate by mass and Hundred Thirty
machine mix for C.C./R.C.C work incl. necessary formworks Five only
centering, scaffolding, compaction by vibrator, curing as directed
with all lead & lift etc complete Without Dewatering and
excluding cost of steel reinforcement.
(c) C. C. Nominal Mix, M-15 and MSA-20 mm
8 45.00 cmt Item No. 8 :: 4480.00 Rupees Four
Providing & Laying in position "DESIGN MIX" cement concrete Thousand Four
using cement sand and crushed aggregate for C.C./ R.C.C work by Hundred Eighty
"FLORI" including necessary formwork, centering, scaffolding, only
compaction by vibrator, curing as directed with all lead & lift etc
complete without dewatering and excluding the cost of steel
(A) For Footing of column / Abutment / Pier / Bottom slab of
barrel / Plinth course / Coping / Approach Slab etc.
(f) Concrete grade M-25 and MSA-40 mm
9 7.70 M.T. Item No. 9 :: 82019.00 Rupees Eighty
Providing & Placing in position reinforcement bars including Two Thousand
cutting, bending, welding joints where necessary, hooking etc. Nineteen only
complete as per drawing for all lead and lifts.
10 124.00 CM. Item No. 10 :: 4296.00 Rupees Four
Providing & Laying in position "NOMINAL MIX" cement Thousand Two
concrete using cement, sand and crushed aggregate by mass and Hundred Ninety
machine mix for C.C./R.C.C work incl. necessary formworks Six only
centering, scaffolding, compaction by vibrator, curing as directed
with all lead & lift etc complete Without Dewatering and
excluding cost of steel reinforcement.
(f) C. C. Nominal Mix, M-20 and MSA-20 mm
11 10.30 M.T. Item No. 11 :: 127815.00 Rupees One Lakh
Fabricating supplying and erecting steel truss including Twenty Seven
walkway platform fitting of chequered plate, railling etc. Thousand Eight
complete including cost of materials, fabrication cutting, Hundred Fifteen
welding etc. and painting with one primer coat and two costs only
of anticorrosive paint etc. comp. as per drawing and
specification.Gate size 30' x 20'(9.144m. x 6.1m.)
12 15.00 Sq.Mt Item No. 12 :: 235.40 Rupees Two
. Providing inspection steps while lining along the canal Hundred Thirty
slopes as per drawing etc. complete as directed. Five and Paisa
(0.30x0.20x0.75m) Forty only
13 93.00 Sq.Mt Item No. 13 :: 339.80 Rupees Three
. Providing and laying dry rubble pitching of various thickness Hundred Thirty
to required grade including trimming of earth work, hand Nine and Paisa
packing the interstices with spauls, filling earth in interstices Eighty only
panelling complete for all leads and lifts.
Total Amount - Rs
Total Amount - Rs
Total Amount in Words Thirty Lakh Twenty Six Thousand Seven Hundred Twenty and Paisa Fifty only
Total Amount in Words Thirty Lakh Twenty Six Thousand Seven Hundred Twenty and Paisa Fifty only
NOTE 1: All work shall be carried out as per Public Works Department Handbook and other specifications of division or as directed.
NOTE 2: All the columns in schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor under his signature. Site,
moisture, weather etc.
NOTE 3: Rates quoted include clearance of site (Prior to commencement of work and at tis close) in all respects and hold good for work under all conditions,
NOTE 4: To be on additional sheets, if found necessary
I/We am/are willing to carry out the work at…........................% above/below percent (Should be written in figures and words) of the
estimated rate mentioned above.
Amount of my /our tender works out as under.
Estimated amount put to tender Rs. 3026720.50 Estimated amount put to tender Rs.
Deduct ……… % below Rs. Add ……… % Above Rs.
Net Rs. Net Rs.
In words In words
Deputy Executive Engineer Divisional Accountant Executive Engineer
Suj. Suf. Sp. Canal Sub Dn. No. 3/1 Suj. Suf. Sp. Ch. Dn. No. 1 Suj. Suf. Sp. Ch. Dn. No.
Signature of the Contractor Bayad Himatnagar Himatnagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
tender notice 9 of 2026-27.pdf
BOQ.pdf
final DTP_compressed (5).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .