Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC The lowest bidder
and hence the work is awarded
to the contractor wide Order No. D1/IRR/PII/2010/2022 2023 Dated 19/12/2022. | |
| 2 | L2₹5.2 L+₹29,633.17 (5.99%)Rejected-AOC | L2 | Rejected-AOC Higher Rate and Rejected | |
| 3 | L3₹5.4 L+₹44,165.24 (8.93%)Rejected-AOC KERALA KL | L3 | Rejected-AOC Higher Rate and Rejected | |
| 4 | L4₹5.4 L+₹49,643 (10.0%)Rejected-AOC 22045 R 100 M S PANJIPILLAI GINDADA P O KERALA | IDUKKI | KERALA | 685501 | L4 | Rejected-AOC Higher Rate and Rejected |
Tender Value
₹5.9 L
EMD Value
₹14,815
Closing Date
19 Nov 2022, 3:00 pmClosed
Saji.F Assistant Executive Engineer
Office of The Assistant Executive Engineer,KIP LB Subdivision No.17, Kottarakkara
KIP LB Construction of bridge across Kozhikode Thachonam canal Pooyappally Kozhikode ward No 9 in Chathannoor Constituency
2022_Irrig_527739_1
IRR/PII/TR/6031/2022_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Pooyappally
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,310
Yes
₹14,815
Yes
20 Dec 2022
11 Nov 2022
22 Nov 2022
11 Nov 2022
19 Nov 2022
11 Nov 2022
Amount
Renovation
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.9.1:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
16.21:Engraving letters in hard stone
DEVARAJAN B
SAJAN DANIEL
baiju
Bidder Name
baiju
SAJAN DANIEL
SREENILAYAM CONSTRUCTIONS
DEVARAJAN B
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_761493.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .