Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 LAccepted-Finance | ₹5.7 L | 1 | Accepted-Finance BID LOW |
| 2 | 2₹5.7 LRejected-Finance | ₹5.7 L | 2 | Rejected-Finance BID HIGH |
| 3 | 3₹5.7 LRejected-Finance | ₹5.7 L | 3 | Rejected-Finance BID HIGH |
Tender Value
₹5.7 L
EMD Value
₹57,167
Closing Date
25 Apr 2026, 5:00 pmClosed
EO AND CHAIRMAN
NP DEORANIAN
PAPPU KE PLOT SE MOHD HANEEF KE MAKAN TAK CC ROAD EVAM NALI NIRMAN KARYA WARD 09
2026_DOLBU_1132985_1
4530/NPD/DATE 01.04.2026
Open Tender
Civil Works
90 days
NP DEORANIAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,005
EXECUTIVE OFFICER NP DEORANIAN
₹57,167
NP DEORANIAN
26 May 2026
6 Apr 2026
27 Apr 2026
6 Apr 2026
25 Apr 2026
6 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1nirman work | ||||||
| 1.01 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 3.16(305) (5 km carted) | - | Nos | - | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | Excavation in foundation in ordinary soil, loame, clay or sand including lift upto 1.5 m & Iead upto…. as directed by the engineer in charge upto a distance of 30m from the foundation trenches. (Including Royalty). (S.I.No.251) | - | Nos | - | - | BI01010001010000000000000515BI0100001114 |
| 1.03 | Concrete with 4cm(1½"). Gauge brick ballast, fine sand of 1.25 fineness modulous and cement in proportion of 12:6:1 in foundation and under floor, including supply of all material Iabour and T&P etc.required for proper completion of the work.(S.I.No.273) | - | nos | - | - | - |
| 1.04 | First class brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.(S.I.No.307) | - | nos | - | - | - |
| 1.05 | 12 mm thick plaster with cement and course sand of 1.25 F.M. Mortar in 1:3 brick work minimum thickness not to be less than 3/8" (10 mm) thick including supply of all materials, labour and T&P etc. required for proper completion of the work. (S.I.No.583) | - | nos | - | - | - |
| 1.06 | Cement concrete with 2 cm. (1½") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work.(S.I.no.279(i)) | - | nos | - | - | - |
| 1.07 | Mild steel or iron work in heavy size suh as trusses built up gates, door , frames record racks roof work gates etc. wrought to required form inlcluding drilling holes , rivetting or welding where necessary ... required for proper completion of work . fabrication work si no. 503 | - | nos | - | - | - |
| 1.08 | R.C.C. work with cement approved coarse sand and 2 cm (3/4") gauge approved stone ballast in the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.l. binding wire and includuing Necessary centering and shuttering etc.and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item. (but for slabs.) S.I.No.284A | - | nos | - | - | - |
| 1.09 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks.(S.I.no.504) | - | Nos | - | - | BI01010001010000000000000515BI0100001115 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_2114873.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid