| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹13.2 L+₹28,876 (2.23%)Rejected-AOC | L2 | Rejected-AOC highest |
Tender Value
₹12.9 L
EMD Value
₹32,400
Closing Date
23 Feb 2022, 6:00 pmClosed
The Assistant Executive Engineer
Electrical wing (Irrigation) Sub Division, Aluva -683101
Fully Comprehensive Annual Maintenance of Karukapilly LIS,Mamalassery LIS,Kayanadu LIS, Kuryathode LIS and Kadathy LIS, Under Electrical Lift Irrigation Section Ramamangalam
2022_Irrig_472588_2
133/TR/AEE/21-22
Open Tender
Electrical Works
Item Wise
365 days
Aluva
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,500
₹32,400
Yes
30 Apr 2022
16 Feb 2022
26 Feb 2022
16 Feb 2022
23 Feb 2022
16 Feb 2022
16 Feb 2022 - 19 Feb 2022
Amount
Maintenance of L I Scheme 2021-22Fully Comprehensive Annual Maintenance of LIS Karukapilly (125 HP x 1 Nos, 120 HP x 2 No and 5HP x 1 Nos )
Part 1 _ Lowering and Overhauling
od16185/2021_2022/IA : Lowering down and erecting the 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od16186/2021_2022/IA : Lowering down and erecting the 125 HP motor, starter and other electricalaccessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od16187/2021_2022/IA : Lowering down and erecting the 120 HP motor, starter and other electricalaccessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od16188/2021_2022/IA : Dismantling above 125 HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od16189/2021_2022/IA : Dismantling the 5 HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od16190/2021_2022/IA : Dismantling 120HP motor into stator and rotor, cleaning the windings, attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od16191/2021_2022/IA : Scrapping, cleaning and painting the Suction / Delivery side MS Pipe with Anticorrosive bituminous black paint over a coat of zinc rich primer
Part 2 _ AMC
od16193/2021_2022/IA : Fully Comprehensive Annual Maintenance of 5 HP Squirrel cage induction induction motor with Vacuum pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump Including motor rewinding and maintain the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od16194/2021_2022/IA : Fully Comprehensive Annual Maintenance of 125 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od16195/2021_2022/IA : Fully Comprehensive Annual Maintenance of 120HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od16196/2021_2022/IA : Fully Comprehensive Annual Maintenance of 120 HP squirrel cage induction motor with split case / End suction pump set, starter, controlling electrical accessories, pipes, NRV, Wheel valves etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting, cutting, welding suction and delivery pipes , reconditioning NRV and Wheel valve,if any removing foreign bodies , renewal of gland packing , gasket packing ,rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , valves, fully automatic star delta starter / soft starter panel accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Part 3 _ Consumables and Supplies ( SITC should be completed with in three months after executing the Agreement)
od45440/2021_2022/IA : Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
od45441/2021_2022/IA : Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 185 or equivalent suitable for 125 HP motor's fully automatic star delta starter
od45442/2021_2022/IA : Supply and Installing 20 W LED Tube light.
od45443/2021_2022/IA : Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
od45444/2021_2022/IA : Supply and renewal of Three Phase digital Ammeter accuracy class 1 in panel board after dismantling the damaged one,L&T or equivalent make.
od45445/2021_2022/IA : Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
od45446/2021_2022/IA : Supply and Installation of DOL starter for 5 HP 3 phase 400V 50Hz squirrel cage induction motor including giving connections( L&T /Equivalent made)
od45447/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 2Z C3, SKF / FAG or equivalent, suitable for 125 HP motor / pump set as per the direction of Departmental staff at site.
od16213/2021_2022/IA : Supply and clamping the 25 x 3mm strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 x 3 mm GI flat duly painted or heavy duty GI spacer saddles, spacing of clamps not exceeding 1m, making good the damages, colour washing etc. as required (for horizontal run).
90.14.24.28 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.30 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
2.1.7 : Providing and fixing following capacity TP&N disconnector fuse switch unit inside the existing panel board with ISI marked HRC fuses including drilling holes in cubicle panel, making connections, etc. as required.320 Amp TP&N
Part 4 _ Lifting
od16203/2021_2022/IA : Lifting the 125 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
od16204/2021_2022/IA : Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform
od16205/2021_2022/IA : Lifting the above 120 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
Maintenance of L I Scheme 2021-22 Fully Comprehensive Annual Maintenance of Mamallassery LIS (110 HP x 1 No, 100 HP x 2 Nos, 5HP x 1 Nos )
Part 1 _ Lowering and Overhauling
od16185/2021_2022/IA : Lowering down and erecting the 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od16221/2021_2022/IA : Lowering down and erecting the 110 HP motor, starter and other electrical accessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od16222/2021_2022/IA : Lowering down and erecting the 100 HP motor, starter and other electrical accessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od16189/2021_2022/IA : Dismantling the 5 HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od16223/2021_2022/IA : Dismantling the 110 HP motor into stator and rotor, cleaning the windings, attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od16224/2021_2022/IA : Dismantling the 100 HP motor into stator and rotor, cleaning the windings, attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od16191/2021_2022/IA : Scrapping, cleaning and painting the Suction / Delivery side MS Pipe with Anticorrosive bituminous black paint over a coat of zinc rich primer
Part 2 _ AMC
od16193/2021_2022/IA : Fully Comprehensive Annual Maintenance of 5 HP Squirrel cage induction induction motor with Vacuum pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump Including motor rewinding and maintain the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od16225/2021_2022/IA : Fully Comprehensive Annual Maintenance of of 100 HP squirrel cage induction motor with split case / End suction pump set, starter, controlling electrical accessories, pipes, NRV, Wheel valves etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting, cutting, welding suction and delivery pipes , reconditioning NRV and Wheel valve,if any removing foreign bodies , renewal of gland packing , gasket packing ,rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , valves, fully automatic star delta starter / soft starter panel accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
od16226/2021_2022/IA : Fully Comprehensive Annual Maintenance of 100HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od16228/2021_2022/IA : Fully Comprehensive Annual Maintenance of 110HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
Part 3 _ Consumables and Supplies ( SITC should be completed with in three months after executing the Agreement)
od45457/2021_2022/IA : Supply and renewal of Multifunction meter to read: V, A, F, 3 phase accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
od45458/2021_2022/IA : Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
od45459/2021_2022/IA : Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 140 or equivalent suitable for 100 HP motor's fully automatic star delta starter
od45460/2021_2022/IA : Supply & fixing brass carbon brush holders (2 x 3 Nos) suitable for 100 HP slip ring induction motor.
od45461/2021_2022/IA : Supply and Installing 20 W LED Tube light.
od45462/2021_2022/IA : Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
od45463/2021_2022/IA : Supply and Installation of DOL starter for 5 HP 3 phase 400V 50Hz squirrel cage induction motor including giving connections( L&T /Equivalent made)
od45464/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6317 2Z C3, SKF / FAG or equivalent, suitable for 100 HP motor / pump set as per the direction of Departmental staff at site.
90.14.24.27 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.25 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
od16231/2021_2022/IA : Supply, Installation & Testing of Chain Pulley Block, Manual Operated, 3 ton Capacity x 15 mt. Chain Length, BEMCO Mumbai or equivalent.
2.1.7 : Providing and fixing following capacity TP&N disconnector fuse switch unit inside the existing panel board with ISI marked HRC fuses including drilling holes in cubicle panel, making connections, etc. as required.320 Amp TP&N
Part 4 _ Lifting
od16204/2021_2022/IA : Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform
od16229/2021_2022/IA : Lifting the 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chainblock, rope, chain etc. and placing them conveniently on the platform.
od16230/2021_2022/IA : Lifting the 100 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chainblock, rope, chain etc. and placing them conveniently on the platform.
Maintenance of L I Scheme 2021-22 Fully Comprehensive Annual Maintenance of LIS Kayanadu (135 HP x 1 No, 110 HP x 1 No, 125 Hp x 1 NO and 5 HP x 1 No )
Part 1 _ Lowering and Overhauling
od16185/2021_2022/IA : Lowering down and erecting the 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od16186/2021_2022/IA : Lowering down and erecting the 125 HP motor, starter and other electricalaccessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od16237/2021_2022/IA : Lowering down and erecting the 135 HP motor, starter and other electricalaccessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od16221/2021_2022/IA : Lowering down and erecting the 110 HP motor, starter and other electrical accessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od16188/2021_2022/IA : Dismantling above 125 HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od16189/2021_2022/IA : Dismantling the 5 HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od16238/2021_2022/IA : Dismantling 135 HP motor into stator and rotor, cleaning the windings, attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od16223/2021_2022/IA : Dismantling the 110 HP motor into stator and rotor, cleaning the windings, attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
Part 2 _ AMC
od16193/2021_2022/IA : Fully Comprehensive Annual Maintenance of 5 HP Squirrel cage induction induction motor with Vacuum pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump Including motor rewinding and maintain the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od16239/2021_2022/IA : Fully Comprehensive Annual Maintenance of of 110 HP squirrel cage induction motor with split case / End suction pump set, starter, controlling electrical accessories, pipes, NRV, Wheel valves etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting, cutting, welding suction and delivery pipes , reconditioning NRV and Wheel valve,if any removing foreign bodies , renewal of gland packing , gasket packing ,rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , valves, fully automatic star delta starter / soft starter panel accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
od16240/2021_2022/IA : Fully Comprehensive Annual Maintenance of 135 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od16241/2021_2022/IA : Fully Comprehensive Annual Maintenance of 125 HP squirrel cage induction motor with split case / End suction pump set, starter, controlling electrical accessories, pipes, NRV, Wheel valves etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting, cutting, welding suction and delivery pipes , reconditioning NRV and Wheel valve,if any removing foreign bodies , renewal of gland packing , gasket packing ,rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , valves, fully automatic star delta starter / soft starter panel accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Part 3 _ Consumables and Supplies ( SITC should be completed with in three months after executing the Agreement)
od16213/2021_2022/IA : Supply and clamping the 25 x 3mm strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 x 3 mm GI flat duly painted or heavy duty GI spacer saddles, spacing of clamps not exceeding 1m, making good the damages, colour washing etc. as required (for horizontal run).
od45485/2021_2022/IA : Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
od45486/2021_2022/IA : Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 225 or equivalent suitable for 135 HP motor's fully automatic star delta starter
od45487/2021_2022/IA : Supply & fixing brass carbon brush holders (2 x 3 Nos) suitable for 135 HP slip ring induction motor.
od45488/2021_2022/IA : Supply and Installing 20 W LED Tube light.
od45489/2021_2022/IA : Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
od45490/2021_2022/IA : Supply and renewal of Three Phase digital Ammeter accuracy class 1 in panel board after dismantling the damaged one,L&T or equivalent make.
od45491/2021_2022/IA : Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
od45492/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 2Z C3, SKF / FAG or equivalent, suitable for 135 HP motor / pump set as per the direction of Departmental staff at site.
od16251/2021_2022/IA : Supply and making cable core termination with superior quality (dowells) Copper cable socket for the following size of PVC armoured conductor cable of 1.1 KV grade as required (150 sqmm)
od16252/2021_2022/IA : Supply and drawing 150 Sq.mm 1 Run of PVC insulated ,Multi strand bright electrolytic annealed bare copper conductor, PVC/FR Insulated Unsheathed Single core round flexible Industrial Power Cables for working voltages up to and including 1100 Volts C in the existing surface/recessed PVC/steel conduit/ PVC casing and capping as required
90.14.24.27 : Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.25 KVAr, 3 phase, 440 V, delta connected, standard duty Metalised Poly Propylene Capacitor, Box Type, suitable for direct connection to motors.
Part 4 _ Lifting
od16203/2021_2022/IA : Lifting the 125 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
od16204/2021_2022/IA : Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform
od16242/2021_2022/IA : Lifting the above 135 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
od16229/2021_2022/IA : Lifting the 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chainblock, rope, chain etc. and placing them conveniently on the platform.
Maintenance of L I Scheme 2021-22 Fully Comprehensive Annual Maintenance of LIS Kuriyathode LIS (100 HP x 1 No, 5HP x 1 No)
Part 1 _ Lowering and Overhauling
od16185/2021_2022/IA : Lowering down and erecting the 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od16222/2021_2022/IA : Lowering down and erecting the 100 HP motor, starter and other electrical accessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od16189/2021_2022/IA : Dismantling the 5 HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od16224/2021_2022/IA : Dismantling the 100 HP motor into stator and rotor, cleaning the windings, attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od16191/2021_2022/IA : Scrapping, cleaning and painting the Suction / Delivery side MS Pipe with Anticorrosive bituminous black paint over a coat of zinc rich primer
Part 2 _ AMC
od16193/2021_2022/IA : Fully Comprehensive Annual Maintenance of 5 HP Squirrel cage induction induction motor with Vacuum pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump Including motor rewinding and maintain the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od16225/2021_2022/IA : Fully Comprehensive Annual Maintenance of of 100 HP squirrel cage induction motor with split case / End suction pump set, starter, controlling electrical accessories, pipes, NRV, Wheel valves etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting, cutting, welding suction and delivery pipes , reconditioning NRV and Wheel valve,if any removing foreign bodies , renewal of gland packing , gasket packing ,rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , valves, fully automatic star delta starter / soft starter panel accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Part 3 _ Consumables and Supplies ( SITC should be completed with in three months after executing the Agreement)
od16213/2021_2022/IA : Supply and clamping the 25 x 3mm strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 x 3 mm GI flat duly painted or heavy duty GI spacer saddles, spacing of clamps not exceeding 1m, making good the damages, colour washing etc. as required (for horizontal run).
od45524/2021_2022/IA : Supply and renewal of Multifunction meter to read: V, A, F, 3 phase accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
od45526/2021_2022/IA : Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 140 or equivalent suitable for 100 HP motor's fully automatic star delta starter
od45527/2021_2022/IA : Supply and Installing 20 W LED Tube light.
od45528/2021_2022/IA : Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
od45529/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6317 2Z C3, SKF / FAG or equivalent, suitable for 100 HP motor / pump set as per the direction of Departmental staff at site.
od16538/2021_2022/IA : Carrying out control wiring for panel with normal meters and indication lamps for interconnecting the control devices/ equipments including providingsuitable size insulated sockets at the termination points or soldered properly, providing numbering ferrules for the proper identification of the wiring,keeping the wiring firm by suitable tie/ tie mounts/ PVC duct etc as required.-1.50 sq mm single run with required sockets.
90.14.11.15 : MCCB AccessoriesSupply and fixing rotary handle, External type (including BUC handle with door interlock ) in the existing MCCB of rating up to 315-630 A
Part 4 _ Lifting
od16204/2021_2022/IA : Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform
od16230/2021_2022/IA : Lifting the 100 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chainblock, rope, chain etc. and placing them conveniently on the platform.
Maintenance of L I Scheme 2021-22 Fully Comprehensive Annual Maintenance of LIS Kadathy (100 HP x 2 Nos and 5 HP x 1No )
Part 1 _ Lowering and Overhauling
od16185/2021_2022/IA : Lowering down and erecting the 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od16222/2021_2022/IA : Lowering down and erecting the 100 HP motor, starter and other electrical accessories and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
od16189/2021_2022/IA : Dismantling the 5 HP motor into stator and rotor, cleaning the windings, attending minor repairs, retaping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od16224/2021_2022/IA : Dismantling the 100 HP motor into stator and rotor, cleaning the windings, attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with Lithium base grease, heating and baking the windings, reassembling, test running including scrapping, cleaning and painting with 2 coats of Grey enamel paint.
od16191/2021_2022/IA : Scrapping, cleaning and painting the Suction / Delivery side MS Pipe with Anticorrosive bituminous black paint over a coat of zinc rich primer
Part 2 _ AMC
od16193/2021_2022/IA : Fully Comprehensive Annual Maintenance of 5 HP Squirrel cage induction induction motor with Vacuum pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump Including motor rewinding and maintain the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
od16225/2021_2022/IA : Fully Comprehensive Annual Maintenance of of 100 HP squirrel cage induction motor with split case / End suction pump set, starter, controlling electrical accessories, pipes, NRV, Wheel valves etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting, cutting, welding suction and delivery pipes , reconditioning NRV and Wheel valve,if any removing foreign bodies , renewal of gland packing , gasket packing ,rubber packing , greasing the bearing etc as and when required including overhauling of pump ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , valves, fully automatic star delta starter / soft starter panel accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
od16226/2021_2022/IA : Fully Comprehensive Annual Maintenance of 100HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, pipes , NRV , Wheel valves etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , cutting , welding suction and delivery pipes , reconditioning NRV and Wheel valve , if any removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding , supply and renewal of pipes ) and maintain the motor pump sets , pipes , starter , valves electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
Part 3 _ Consumables and Supplies ( SITC should be completed with in three months after executing the Agreement)
od45532/2021_2022/IA : Dismantling the damaged power contactor and Supply, fixing and testing of following capacity 3 pole power contactor, AC 3 rating at 415 V, with AC Coil, Auxiliary contacts, 2 NO/2NC, L&T MNX 140 or equivalent suitable for 100 HP motor's fully automatic star delta starter
od45533/2021_2022/IA : Supply and Installing 20 W LED Tube light.
od45534/2021_2022/IA : Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
od45535/2021_2022/IA : Supply and renewal of Three Phase digital Ammeter accuracy class 1 in panel board after dismantling the damaged one,L&T or equivalent make.
od45536/2021_2022/IA : Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
od45537/2021_2022/IA : Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6317 2Z C3, SKF / FAG or equivalent, suitable for 100 HP motor / pump set as per the direction of Departmental staff at site.
od16213/2021_2022/IA : Supply and clamping the 25 x 3mm strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 x 3 mm GI flat duly painted or heavy duty GI spacer saddles, spacing of clamps not exceeding 1m, making good the damages, colour washing etc. as required (for horizontal run).
Part 4 _ Lifting
od16204/2021_2022/IA : Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform
od16230/2021_2022/IA : Lifting the 100 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chainblock, rope, chain etc. and placing them conveniently on the platform.
E R ANANDAN
Bidder Name
KEYAS ELECTRICALS
E R ANANDAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_681783.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .