| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | ₹4.4 L | L1 | Accepted-AOC Lowest 1 |
| 2 | L2₹5.4 L+₹98,363.06 (22.1%)Rejected-AOC VAIPOL HOUSE KANNADIPOYIL BBNPA9595D | ₹5.4 L+₹98,363.06 (22.1%) | L2 | Rejected-AOC Lowest 2 |
| 3 | L3₹5.6 L+₹1.2 L (26.5%)Rejected-AOC | ₹5.6 L+₹1.2 L (26.5%) | L3 | Rejected-AOC Lowest 3 |
| 4 | L4₹6.0 L+₹1.6 L (35.7%)Rejected-AOC | ₹6.0 L+₹1.6 L (35.7%) | L4 | Rejected-AOC Lowest 4 |
Tender Value
₹6.0 L
EMD Value
₹15,100
Closing Date
26 May 2026, 5:00 pmClosed
Assistant Executive Engineer, ESD Balussery
Electrical Sub Division, Balussery
Renewal and Insertion of LT PSC Poles in single phase and three phase lines, renewal and providing of LT Stays identified at various locations
2026_KSEB_851702_1
ESD/BLSY/e-Tender/01/2026-27
Open Tender
Electrical Works
Percentage
ES Koottalida
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,534
₹15,100
5 Jun 2026
18 May 2026
30 May 2026
19 May 2026
26 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. | 1 | No | 1,887.05 | ₹1,887.05 |
| 2 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 114 | No | 478.82 | ₹54,585.48 |
| 3 | Providing Fly stay for LT pole using LT PSC pole including digging and back filling pit in ordinary soil. | 3 | No | 3,062.14 | ₹9,186.42 |
| 4 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. | 20 | No | 938.82 | ₹18,776.4 |
| 5 | Renewal of existing damaged/broken old LT stay in existing stay rod. | 50 | No | 434.91 | ₹21,745.5 |
| 6 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. | 85 | No | 96.18 | ₹8,175.3 |
| 7 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. | 15 | No | 149.5 | ₹2,242.5 |
| 8 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | 29 | Trip | 3,142.26 | ₹91,125.54 |
| 9 | Pole numbering using printed Aluminium sheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level.
The number and letters should be in black synthetic enamel paint. The size of the number should be at least 2cm in height x 1.5cm in width. including cost of paint. | 110 | No | 69 | ₹7,590 |
| 10 | Renewal of existing damaged/old LT PSC/RCC (three phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole. | 30 | No | 3,904.77 | ₹1,17,143.1 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1439098.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
NIT.pdf
Other Document • 0.42 MB
BOQ_1439098.xls
BOQ • 0.33 MB
Biddocument.pdf
Tender Documents • 3.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .