| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC STAR NAGAR THEKKIL FERRY BEVINJE KASARAGOD 671541 | KASARAGOD | KASARAGOD | KERALA | 671541 | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 CrRejected-AOC KOTTA HOUSE POWALKOTTA KASRAGOD P O MULIYAR KASRAGOD | KASARGOD | KASARGOD | KERALA | ₹1.2 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹1.2 CrRejected-Finance | ₹1.2 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.2 CrRejected-Finance | ₹1.2 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹1.2 CrRejected-Finance | ₹1.2 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | MANZOOR KUNHAMOO L6 | AHAMMEDALI.M.T. L4 | UBAISE M.B L8 | KUNHIMAHIN KUTTI HAJI CONSTRUCTION PRIVATE LIMITED L9 | CM ASHARAF L1 | SHAFEEQ C.A L7 | JAFAR SADIK M L2 | A BASHEER L5 | K MOHAMMED KUNHI L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Appendix 1: CONSTRUCTION OF VCB | ||||||||||||
| 1.00 | 60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | 25 | metre | 1,095.45 ₹27,386.25 | 1,064.35 ₹26,608.75 | 1,095.45 ₹27,386.25 | 1,500 ₹37,500 | 1,004 ₹25,100 | 1,106.41 ₹27,660.25 | 1,038.65 ₹25,966.25 | 1,069.89 ₹26,747.25 | 1,055 ₹26,375 |
| 1.00 | 60.2.3:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 168 | hour | 394.47 ₹66,270.96 | 383.27 ₹64,389.36 | 394.47 ₹66,270.96 | 600 ₹1.0 L | 375 ₹63,000 | 398.41 ₹66,932.88 | 374.02 ₹62,835.36 | 385.27 ₹64,725.36 | 380 ₹63,840 |
| 1.00 | 60.2.4:BAILING OUT WATER USING PUMP ABOVE 10HP AND UP TO 20HP - Bailing out water with engine and pump set above 10HP and up to 20HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 413 | hour | 487.61 ₹2.0 L | 473.77 ₹2.0 L | 487.61 ₹2.0 L | 700 ₹2.9 L | 463 ₹1.9 L | 492.49 ₹2.0 L | 462.33 ₹1.9 L | 476.23 ₹2.0 L | 470 ₹1.9 L |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1,445.97 | cum | 196.31 ₹2.8 L | 190.74 ₹2.8 L | 196.31 ₹2.8 L | 450 ₹6.5 L | 187 ₹2.7 L | 198.27 ₹2.9 L | 186.13 ₹2.7 L | 191.73 ₹2.8 L | 188 ₹2.7 L |
| 1.00 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 605.9 | cum | 7,437.74 ₹45.1 L | 7,226.55 ₹43.8 L | 7,437.74 ₹45.1 L | 7,300 ₹44.2 L | 7,071 ₹42.8 L | 7,512.12 ₹45.5 L | 7,052.08 ₹42.7 L | 7,264.2 ₹44.0 L | 7,143 ₹43.3 L |
| 1.01 | 4.2.2:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources | 193.58 | cum | 9,358.46 ₹18.1 L | 9,092.72 ₹17.6 L | 9,358.46 ₹18.1 L | 9,300 ₹18.0 L | 8,400 ₹16.3 L | 9,452.04 ₹18.3 L | 8,873.2 ₹17.2 L | 9,140.09 ₹17.7 L | 8,989 ₹17.4 L |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.32 | cum | 10,218.61 ₹23,727.61 | 9,952.06 ₹23,108.68 | 10,242.91 ₹23,784.04 | 10,685.51 ₹24,811.75 | 9,500 ₹22,059 | 10,345.34 ₹24,021.88 | 9,688.76 ₹22,497.30 | 10,003.91 ₹23,229.08 | 9,837 ₹22,841.51 |
| 1.01 | 4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts | 479.57 | sqm | 768.51 ₹3.7 L | 746.69 ₹3.6 L | 768.51 ₹3.7 L | 801.72 ₹3.8 L | 731 ₹3.5 L | 776.2 ₹3.7 L | 728.66 ₹3.5 L | 750.58 ₹3.6 L | 737.5 ₹3.5 L |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 17.55 | sqm | 732.47 ₹12,854.85 | 711.67 ₹12,489.81 | 732.47 ₹12,854.85 | 764.12 ₹13,410.31 | 696 ₹12,214.80 | 739.79 ₹12,983.31 | 694.49 ₹12,188.30 | 715.38 ₹12,554.92 | 703 ₹12,337.65 |
Tender Value
₹1.5 Cr
EMD Value
₹50,000
Closing Date
7 Mar 2026, 6:00 pmClosed
Executive Engineer MI Division Kasaragod
Executive Engineer MI Division Kasaragod
KDP-ALAMPADY VCB-CONSTRUCTION OF VCB ACROSS MADHUVAHINI RIVER AT ALAMPADY IN CHENGALA PANCHAYATH IN KASARAGOD CONSTITUENCY OF KASARAGOD DISTRICT-General Civil Work
2026_Irrig_841676_1
IRR/IA/TR/7163/2024_5_1_1/1
Open Tender
Civil Works - Others
545 days
Alampady
Please refer Tender documents.
7 documents required · 7 mandatory
₹6,508
Yes
₹50,000
Yes
18 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
7 Mar 2026
27 Feb 2026
Appendix 1: CONSTRUCTION OF VCB
60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
60.2.3:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
60.2.4:BAILING OUT WATER USING PUMP ABOVE 10HP AND UP TO 20HP - Bailing out water with engine and pump set above 10HP and up to 20HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
4.2.2:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.7.4:DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.63.1:FRP SHUTTERS - Supplying and fixing FRP Channels of "C" profile and sill beam size 100x100x100 mm with flange of 50 to 75mm depth in the grooves already arranged and as per the direction of departmental .officers.
60.63.2:FRP SHUTTERS - Supplying and fixing FRP shutters of suitable size to with stand the design and max water pressure as prescribed by the departmental officer and installing the FRP channels provided in the grooves already arranged and as per the direction of departmental .officers.
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
8.2.2.2:Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Area of slab over 0.50 sqm
OD11277/2025-2026:Providing and fixing Information Board made of 1mm thick MS sheet of size 1mx0.6m with ISA 25x25x5mm frame, fixed in 1 nos of 40mm dia GI pipe. Including necessary excavation, foundation block using cement concrete 1:2:4, priming coat and enamel painting over all members and all lettering works. complete all as per the direction of Departmental officers at the site
OD11278/2025-2026:Providing and fixing Social Audit Board made of 1mm thick MS sheet of size 1mx0.6m with ISA 25x25x5mm frame, fixed in 2 nos of 40mm dia GI pipe. Including necessary excavation, foundation block using cement concrete 1:2:4, priming coat and enamel painting over all members and all lettering works. complete all as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.23:Smooth finishing of the exposed surface of RCC work with 6mm thick cement mortar 1:3 ( cement : 3 fine sand).
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
Appendix 2: STORE SHED
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
10.6.1:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x1.25 mm M.S. laths with 1.25 mm thick top cover
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
5.23:Smooth finishing of the exposed surface of RCC work with 6mm thick cement mortar 1:3 ( cement : 3 fine sand).
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
13.37.1:White washing with lime to give an even shade:New work (three or more coats)
13.62.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture .
OD11279/2025-2026:Laterate masonry with neatly dressed laterate stone of size 30X20X20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
OD11280/2025-2026:Laterate masonry with neatly dressed laterate stone of size 30X20X20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
Appendix 3- SIDE PROTECTION
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.2.3:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1419433.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
IntegrityPactandFormofTender.pdf
Tender Documents • 0.24 MB
SBD.pdf
Tender Documents • 2.61 MB
preliminaryagreement.pdf
Tender Documents • 0.24 MB
epayment.pdf
Tender Documents • 0.06 MB
BOQ_1419433.xls
BOQ • 0.33 MB
affidavit.pdf
Tender Documents • 0.02 MB
Download all tender documents and submit your bid