| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.3 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹33.0 L+₹64,619.74 (2.00%)Rejected-Finance | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | ADITI CONSTRUCTIONS L1 | TNT CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of New Panchayat Office Building at Jeyanthirar nagar in Koothur Panchayat. Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 90.81 | cum | 263 ₹23,883.03 Lowest | 268.26 ₹24,360.69 |
| 2.00 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications. | 21.32 | cum | 1,847 ₹39,378.04 Lowest | 1,883.94 ₹40,165.6 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete | 21.35 | cum | 5,565 ₹1,18,812.75 Lowest | 5,676.3 ₹1,21,189.01 |
| 4.00 | Brickwork in CM 1:5 mix using country bricks ground maded of size 23 x 11 x 7 cm including cost and conveyance of all materials etc., complete. | 71.31 | cum | 6,116 ₹4,36,131.96 Lowest | 6,238.32 ₹4,44,854.6 |
| 5.00 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. | 64.46 | sqm | 548 ₹35,324.08 Lowest | 558.96 ₹36,030.56 |
| 6.00 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. | 235.96 | sqm | 1,095 ₹2,58,376.2 Lowest | 1,116.9 ₹2,63,543.72 |
| 7.00 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete | 5.79 | mt | 91,924 ₹5,31,780.34 Lowest | 93,762.48 ₹5,42,415.95 |
| 8.00 | RCC 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 45.37 | cum | 9,305 ₹4,22,167.85 Lowest | 9,491.1 ₹4,30,611.21 |
| 9.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2024-25) | 99.76 | sqm | 308 ₹30,726.08 Lowest | 314.16 ₹31,340.6 |
| 10.00 | Plastering surfaces of RCC items such as slabs,beams,sunshades with cement mortar 1:3 -10mm thick including packing, providing cement mortar beading for sunshades staircase ,steps, lands slabs etc.,as directed by departmental officers etc, complete complying with standard specifications. | 43.08 | sqm | 327 ₹14,087.16 Lowest | 333.54 ₹14,368.9 |
Tender Value
₹33.5 L
EMD Value
₹34,000
Closing Date
11 Feb 2026, 4:00 pmClosed
BDO (VP)
Mannachanallur Panchayat Union
Construction of New Panchayat Office Building at Jeyanthirar nagar in koothur Panchayat.in Mannachanallur Panchayat Union in Tiruchirappalli District
2026_RDTN_651126_1
01/2026 02.02.2026
Open Tender
Civil Works - Buildings
Item Rate
Mannachanallur Panchayat Union
Construction of New Panchayat
Office Building at Jeyanthirar nagar in koothur
Panchayat.in Mannachanallur Panchayat Union in
Tiruchirappalli District
5 documents required · 5 mandatory
₹0
₹34,000
Yes
Mannachanallur Panchayat Union
11 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
4 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of New Panchayat Office Building at Jeyanthirar nagar in Koothur Panchayat. Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 90.81 | cum | - | - |
| 2 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications. | 21.32 | cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete | 21.35 | cum | - | - |
| 4 | Brickwork in CM 1:5 mix using country bricks ground maded of size 23 x 11 x 7 cm including cost and conveyance of all materials etc., complete. | 71.31 | cum | - | - |
| 5 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. | 64.46 | sqm | - | - |
| 6 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. | 235.96 | sqm | - | - |
| 7 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete | - | mt | - | - |
| 8 | RCC 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 45.37 | cum | - | - |
| 9 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2024-25) | 99.76 | sqm | - | - |
| 10 | Plastering surfaces of RCC items such as slabs,beams,sunshades with cement mortar 1:3 -10mm thick including packing, providing cement mortar beading for sunshades staircase ,steps, lands slabs etc.,as directed by departmental officers etc, complete complying with standard specifications. | 43.08 | sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
NIT.pdf
Tender Documents • 0.24 MB
Pricebid.pdf
Additional Documents • 0.78 MB
BOQ_780772.xls
BOQ • 0.31 MB
Techbid.pdf
Additional Documents • 1.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .