Tender Value
₹10.1 L
EMD Value
₹11,000
Closing Date
8 May 2026, 6:05 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Dahod (R & B) Division, Dahod
S.R. to Ahmedabad-Kuha-Kathlal-Balashinor-Lunawada-Santrampur-Zalod-Kushalgadh Road Km. 174/200 to 187/200 (Working Ch. 174/200 to 174/500) Dist. Dahod (Providing H. P. drain)
299885
21 of 2025-26 (8th Attempt)
Open
Civil Works - Others
Dahod
2 documents required · 2 mandatory
₹900
Executive Engineer, Dahod (R&B) Division, Dahod
₹11,000
30 Apr 2026
30 Apr 2026
30 Apr 2026
8 May 2026
30 Apr 2026
Name of Work :- S.R. to Ahmedabad-Kuha-Kathlal-Balashinor-Lunawada-
Santrampur-Zalod-Kushalgadh Road Km. 174/200 to 187/200 (Working Ch.
174/200 to 174/500) Dist. Dahod (Providing H. P. drain)
BILL OF QUANTITIES
Memorandum showing item of works to be carried out.
It. Item of Work Qty. Unit Rates in Total
No. Figure Amount
1 Excavation for foundation upto 1.5 m depth including sorting out and 247.00 Cum 160.89
stacking of useful materials and disposing off the excavated stuff within all
lead and lift for all sorts of soil.
2 Providing and laying in foundation cement concrete 1:4:8 (1 cement : 4 19.00 Cum 2679.92
coarse sand : 8 hand broken stone aggregates 40 mm. nominal size) and
curing complete excluding cost of form work in foundation and plinth.
3 Providing and laying controlled cement concrete M-150 for curing 57.00 Cum 3861.37
complete excluding cost of formwork and reinforcement for reinforced
concrete work in foundations, footings, base of columns and mass
4 Providing and laying in position for I.S.I. Mark Fe-500D T.M.T. bar 1.425 M.T. 73858.69
reinforcement including cutting, bending, hooking and tying complete as
per detailed drawing for the following (A) Piers (B) Abutments (C) R.C.C.
5 Supplying and fixing reinforced concrete heavy duty nonpressure pipes 30.00 Rmt. 6621.25
with collars for culverts including setting and joining the pipes in C.M. 1:2
watering and laying (to level or slope) of I.S. class NP4 of following internal
diameters. (vii) 1200mm dia.
6 Filling available excavated earth (excluding rock) in trenches, plinth, sides 208.00 Cum 137.47
of foundations etc. in layers not exceeding 20 cm. in depth consolidating
each deposited layer by ramming and watering.
7 Filling in pipes / trenches with sand under floors including watering, 19.00 Cum 419.81
ramming, consolidating and dressing complete.
8 Providing 10mm thick cement plaster in single coat on brick/concrete wall 154.00 Sq.m. 120.22
for plastering upto floor two level and finished even and smooth in Cement
Mortar 1:6 (1-Cement : 6-Sand).
9 White washing with lime on wall surfaces (two coats) to give an even shade 148.00 Sq.m. 12.99
including thoroughly brooming the surface to remove all dirt, dust, mortar
drops and other foreign matter.
10 Providing & laying weep hole in Abutments and returns by using A.C. pipe 80.00 No. 49.24
of 100mm including laying in proper grade and jointing the completed as
per detailed specification.
11 Providing and laying rubble for apron (each stone weighting not less than 30.00 Cum 1004.98
40Kg.) including and packing and filing in the interestices with quarry
It. Item of Work Qty. Unit Rates in Total
No. Figure Amount
12 Providing and laying 50 mm thick Bituminous Macadam with B.T. 61.88 M.T. 2442.18
aggregate as per MORTH specification and using emulsion RS-1 as per IS
8887: for tack coat @ 2.50 Kg. / 10 Sq.m. with mechanical sprayer and bulk
asphalt VG-30 for mixing @ 34.00 Kg. / M.T. i.e. 3.40% of total weight of
mix including heating and mixing the aggregate and asphalt in continuous
of drum mix plant and hot laid process spreading the same by paver
finisher and consolidation with roller as per MORTH specification to
achieve desire density, including providing all materials equipments, tools
and plants, fire wood, oil, kerosene, labour charges etc. complete using
contractor's own machinery drum mix plant and paver finisher etc.
13 Providing and laying 25 mm thick Semi Dense Bituminous Concrete 21.56 M.T. 2011.92
using specified graded crushed black trap stone aggregates as per MORTH
gradation using VG-30 (60/70) bulk bitumen for mixing at the rate of 5.0%
(50 Kg./M.T.) by hot mix process in drum mix plant and hot laid process
using paver finisher to the required camber and grade including rolling with
vibratory roller to achieve desired density including cost of clearing using
fire wood, oil, kerosene, labour charges and hire charges of machineries
14 Road marking with hot applied thermoplastic paints with reflectorising glass 310.00 Sq.m. 367.72
beads on bitumen surface providing and laying a hot applied thermoplastic
compound 2.5 mm thick including reflectorising glass beads @ 250gms per
sqm area, thickness of 2.5mm is excluding of surface applied glass beds
as per IRC:35-2015. The finished surface to be level, uniform and free from
streaks and holes. Zebra patta / bump patta lane / center line/ edge line/cut
patta. The white color marking should provide luminance coefficient on
cement road shall be min 130 mcd/m2/lux and Asphalt road shall be min
100 mcd/m2/lux during the service life during the day time. The marking
should meet the performance criteria for night time reflectivity, wet
reflectivity and skid resistance as mentioned in the section-15 of IRC 35-
2015. Warranty for the retro reflectivity should be two years.
i.e. Rs. Ten Lacs, Fourteen Thousand, Two hundred Twenty Two and Eighty paisa only
I/We am/are willing to carry out the work @ ______________ % above/below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
1. The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-
Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills.
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C, Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as
per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
It. Item of Work Qty. Unit Rates in Total
No. Figure Amount
Above all items of "Schedule-B" with Item Description, Unit, Rate & Amount have verified by me and
Deputy Executive Engineer Sr. Divisional Account Officer Executive Engineer
Dahod (R & B) Sub Division, Dahod (R & B) Division, Dahod (R & B) Division,
Dahod Dahod Dahod
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Book - S.R. to AKKBLSJK Road.pdf
BOQ - S.R. to AKKBLSJK Road - HP Drain.pdf
Specification Index.pdf
Technical Specifications.pdf
GRs.pdf
E- tendering Notice - S.R. to AKKBLSJK Road - 8th.pdf
Download all tender documents and submit your bid