Loading
Loading…
Loading…
Tender Value
₹18.2 L
EMD Value
₹36,400
Closing Date
6 Jun 2026, 5:00 pmDue today
EEMGCCD4 AMROHA
EEMGCCD4 AMROHA
Construction Of V.R.B At Km. 2.625 Of Dhakiya Dy. under Project M.G.C. Stage-II
2026_UPIDC_1156046_3
01/EE/2026-27
Open Tender
Civil Works - Canal
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹36,400
1 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
6 Jun 2026
1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in ordinary soil i/c all lead & reqd lifts with proper compaction as per site requirement and proper disposel of excavated surplus earth as directed by engineer in charge including cost of all labour T&P etc. required for proper completion of work | 77.7 | CUM | - | - |
| 2 | Laying of cement concrete M10 A40 (1:3:6) with Cement, Coarse Sand, Stone Grit (A-40) laid in foundation of abutment including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete or as directed By for proper completion of work Engineer-in-charge | 18.33 | CUM | - | - |
| 3 | Cement Concrete in (1:2:4) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 5.1 | CUM | - | - |
| 4 | Laying of Cement Concrete in M7.5 A40 (1:4:8) mix with Cement, Coarse Sand, Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 6.72 | CUM | - | - |
| 5 | Ist class Brick work in 1:4, Cement Coarse Sand mortar in warping including cost of all material labour T&P etc. complete for proper completion of work | 68.91 | CUM | - | - |
| 6 | Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 113.78 | SQM | - | - |
| 7 | Providing centering & shuttering for bridge slab, bed block, dirt wallcement concrete work in foundation and transitions i/c all cost of labour & T&P etc complete for proper completion of work | 70.03 | SQM | - | - |
| 8 | Laying of reinforeced cement concrete in M20 A20 (1:1.5:3) mix with Cement, Coarse Sand, Stone Grit (A-20) in slab including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 20.24 | CUM | - | - |
| 9 | Laying of reinforeced cement concrete in M20 A20 (1:1:2) mix Cement, Coarse Sand (A-20) in dirt wall and bed block including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 6.79 | CUM | - | - |
| 10 | S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | 4.74 | SQM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.48 MB
BOQ_2165916.xls
BOQ • 0.32 MB
TD04.pdf
Tender Documents • 2.70 MB
Download all tender documents and submit your bid