| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.8 LAdmitted-Finance | ₹49.8 L | L1 | Admitted-Finance |
| 2 | L2₹80.7 L+₹30.9 L (62.1%)Admitted-Finance | ₹80.7 L+₹30.9 L (62.1%) | L2 | Admitted-Finance |
| 3 | L3₹94.5 L+₹44.7 L (89.8%)Admitted-Finance | ₹94.5 L+₹44.7 L (89.8%) | L3 | Admitted-Finance |
| 4 | L4₹94.7 L+₹44.9 L (90.3%)Admitted-Finance VILLAGE SHATHAWAL P O KEDI TEHSIL CHOPAL DISTT SHIMLA H P | CHOPAL | SHIMLA | HIMACHAL PRADESH | ₹94.7 L+₹44.9 L (90.3%) | L4 | Admitted-Finance |
| 5 | L5₹99.3 L+₹49.5 L (99.5%)Admitted-Finance ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | ₹99.3 L+₹49.5 L (99.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Rajesh Kumar L5 | Dinesh Chauhan L4 | NARENDER BALI L6 | pohulal bhardwaj govt cont L3 | Sohan lal L2 | SANTOSH KUMAR L7 | PRADEEP RAITKA L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | SITE DEVELOPMENT WORK:
Cutting in earth work in by mechanical means all heights and depths in all kinds of soils, including saturated soils comprising of pick work , Jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (Where blasting is prohibited) and their intermediate classification of soil including, dewatring where required, setting out to required lines, levels as shown on the drawing and directed by the Engineer-in - charge at site, according to the HP.PWD. specification of 1990( One Thousand Nine Hundred ninety) Volume-I (One) and sorting out useful and unuseful matreial and Transportation of the unuseful matreial for disposing at dumping site ( To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load , animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechnical means and labour( If required). All useful material such as stone , shingles aggregate and slates Shall be properly Stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per direction of the Engineer -in -charge . The recovery for stones, weather useful or not, for the minimum quatom of 2267.07 cubic meter @ Rupee 300/- Only (Rupees. Three hundred) per cubic meter Shall be effected on pro rata basis in all circumstances. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 45,341.43 | Per Cubic Metre | 219 ₹99,29,773.17 | 208.9 ₹94,71,824.73 | 227 ₹1,02,92,504.61 | 208.42 ₹94,50,060.84 | 178 ₹80,70,774.54 | 251.52 ₹1,14,04,276.47 | 109.8 ₹49,78,489.01 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
28 Jun 2022, 6:00 pmClosed
EE HPSAMB Shimla
EE HPSAMB Shimla
C/o Anaj Mandi at Kangni, Distt Mandi H.P SH Cutting work in phase-1
2022_HPAMB_61637_1
3095
Open Tender
Civil Works
Item Rate
60 days
Manali
As per SBD
11 documents required · 11 mandatory
₹5,900
EE HPSAMB Shimla
₹2.0 L
4 Jul 2022
13 Jun 2022
30 Jun 2022
13 Jun 2022
28 Jun 2022
13 Jun 2022
Amount
SITE DEVELOPMENT WORK: Cutting in earth work in by mechanical means all heights and depths in all kinds of soils, including saturated soils comprising of pick work , Jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (Where blasting is prohibited) and their intermediate classification of soil including, dewatring where required, setting out to required lines, levels as shown on the drawing and directed by the Engineer-in - charge at site, according to the HP.PWD. specification of 1990( One Thousand Nine Hundred ninety) Volume-I (One) and sorting out useful and unuseful matreial and Transportation of the unuseful matreial for disposing at dumping site ( To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load , animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechnical means and labour( If required). All useful material such as stone , shingles aggregate and slates Shall be properly Stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per direction of the Engineer -in -charge . The recovery for stones, weather useful or not, for the minimum quatom of 2267.07 cubic meter @ Rupee 300/- Only (Rupees. Three hundred) per cubic meter Shall be effected on pro rata basis in all circumstances. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Sohan lal
pohulal bhardwaj govt cont
Dinesh Chauhan
Rajesh Kumar
NARENDER BALI
SANTOSH KUMAR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .