Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | ₹5.1 L | L1 | Accepted-AOC Awarded of contract |
| 2 | L1₹5.1 LRejected-AOC | ₹5.1 L | L1 | Rejected-AOC Disqualified in transparent lottery |
| 3 | L1₹5.1 LRejected-AOC AT MAIN ROAD DABUGAM PO PS DABUGAM DIST NABARANGPUR | DABUGAM | NABARANGPUR | ODISHA | ₹5.1 L | L1 | Rejected-AOC Disqualified in transparent lottery |
| 4 | L1₹5.1 LRejected-AOC WARD NO 16 PO NABARANGPUR PS DIST NABARANGPUR | NABARANGPUR | NABARANGPUR | ODISHA | ₹5.1 L | L1 | Rejected-AOC Disqualified in transparent lottery |
| 5 | L1₹5.1 LRejected-AOC AT JAMBAGUDA PO MAJHIGUDA PS PAPADAHANDI DIST NABARANGPUR ODISH | ₹5.1 L | L1 | Rejected-AOC Disqualified in transparent lottery |
Tender Value
₹5.1 L
EMD Value
₹5,083
Closing Date
2 Mar 2026, 5:00 pmClosed
Executive Engineer
RURAL WORKS DIVISION-I, NAWARANGPUR
SR to Excise office Building at Papadahandi for the year 2025 26.
2026_CERWI_126501_2
EERWNGP Online 13 2025 26
National Competitive Bid
Civil Works - Buildings
Percentage
15 days
Papdahandi
Please refer to Tender documents
2 documents required · 2 mandatory
₹4,000
₹5,083
Yes
31 Mar 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
24 Feb 2026 - 2 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation of foundation in hard soil with all leads and lifts including dressing levelling the bed & deposited excaved nmaterials with 50 mt. away all labour T & P etc. complete. | 23.2 | Cum | 276.89 | ₹6,423.85 |
| 2 | Filling foundation and plinth with sand in layers not exceeding 150 mm thick including watering and compacting with all leads and lifts including cost , carriage royalty etc. | 2.59 | Cum | 560.38 | ₹1,451.38 |
| 3 | Cement concrete ( 1:3:6 ) with 4cm size h.g. metal in foundation & plinth including hoisting lowering laying in layers 15 cm thick compacting watering curing with cost carriage royalty of all materials etc. complete. | 3.04 | Cum | 5,139.78 | ₹15,624.93 |
| 4 | R.C.C. ( 1:1.5:3 ) with 12mm size h.g. chips including hoisting lowering laying in layers 15 cm thick compacting centering shuttering watering curing with cost carriage royalty of all materials etc. complete. | 0.01 | Cum | 0.01 | ₹0 |
| 4.01 | Column base | 2.4 | cum | 7,990.1 | ₹19,176.24 |
| 4.02 | Plinth Beam | 2.33 | cum | 8,803 | ₹20,510.99 |
| 4.03 | Lintel Beam | 0.75 | cum | 8,803 | ₹6,602.25 |
| 4.04 | Column | 1.97 | cum | 18,901.1 | ₹37,235.17 |
| 4.05 | Chajjas | 1.92 | sqm | 1,280.35 | ₹2,458.27 |
| 5 | Providing HYSD bars including cutting, bending, binding and tying the grills and placing in position including cost, conveyance and royalty of all materials and cost of all labour etc. complete | 5.42 | Qntl | 8,991.65 | ₹48,734.74 |
stage.html
html • 0.11 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_582580.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
Tendernotice_2.pdf
PDF • 1.47 MB
BOQ_582580.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .