| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAccepted-AOC FLAT NO 002 MAHAVIR VILLA CHS LTD PLOT NO 259 SECTOR 21 NERUL EAST NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | ₹5.0 Cr Quoted ₹5.1 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹5.8 Cr+₹70.7 L (13.8%)Rejected-AOC NOT AVAILABLE | FARIDABAD | HARYANA | 121004 | ₹5.8 Cr+₹70.7 L (13.8%) | L2 | Rejected-AOC Being not L1 |
| 3 | L3₹5.9 Cr+₹76.1 L (14.8%)Rejected-AOC | ₹5.9 Cr+₹76.1 L (14.8%) | L3 | Rejected-AOC Being not L1 |
| 4 | L4₹6.3 Cr+₹1.2 Cr (22.6%)Rejected-AOC ATLANTIS A2 1501 PLOT NO 05 SECTOR 11 NEAR CLOUD 36 GHANSOLI NAVI MUMBAI 400 701 E 97 CWE SUBS BHANDUP | THANE | MAHARASHTRA | 400701 | ₹6.3 Cr+₹1.2 Cr (22.6%) | L4 | Rejected-AOC Being not L1 |
| 5 | L5₹6.3 Cr+₹1.2 Cr (23.0%)Rejected-AOC FLAT NO B 401 4TH FLOOR NAVADURGA CO OP HSG SOCIETY LTD PLOT NO 7 SECTOR 19A NERUR EAST NAVI MUMBAI THANE MAHARASHTRA 400 706 | NAVI MUMBAI | THANE | MAHARASHTRA | 400706 | ₹6.3 Cr+₹1.2 Cr (23.0%) | L5 | Rejected-AOC Being not L1 |
| Sl No | Description | Qty | Unit | RAJENDRA CONSTRUCTION L1 | Shree Construction Co. L4 | Dwarka Pershad Radhey Ramanlal L8 | Shetty Construction Co L6 | M/s Amit Associates L7 | ASHOK CONSTRUCTION L2 | Saiansh Associates L3 | ROHIT CONSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | SPECIAL REPAIR B/R:-
Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises to a out side of MoD land complete all as specified and directed.. | 1,302 | Sqm | 35 ₹45,570 | 35 ₹45,570 | 50 ₹65,100 | 25 ₹32,550 | 35 ₹45,570 | 20 ₹26,040 Lowest | 30 ₹39,060 | 36 ₹46,872 |
| 2.00 | Taking down of cement or cement lime plaster of any description any thickness on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc and removing rubbish off the premises to a out side of MoD land complete all as specified and directed. | 685 | Sqm | 35 ₹23,975 | 30 ₹20,550 | 30 ₹20,550 | 30 ₹20,550 | 35 ₹23,975 | 18 ₹12,330 Lowest | 25 ₹17,125 | 30 ₹20,550 |
| 3.00 | Demolition of Plain cement concrete (un reinforced) of any description and any position as roof kerbs coving ,padding etc,over roof and removing the debries out side of MoD land complete all as specified and direct. | 83 | Cum | 800 ₹66,400 | 300 ₹24,900 Lowest | 400 ₹33,200 | 530 ₹43,990 | 300 ₹24,900 Lowest | 800 ₹66,400 | 450 ₹37,350 | 500 ₹41,500 |
| 4.00 | Demolition of reinforced cement concrete of any description , any grade and in any position including reinforcement cut as required to facilitate demolition as in water tanks including base beams, shelves, platform etc and removing the debries out side of MoD land complete all as specified and directed. | 1 | Cum | 1,200 ₹1,200 | 450 ₹450 Lowest | 500 ₹500 | 600 ₹600 | 600 ₹600 | 1,400 ₹1,400 | 450 ₹450 Lowest | 1,300 ₹1,300 |
| 5.00 | Taking up or down steel tubing 15 mm and connections, including cleaning for refixing or removal to store etc complete all as directed. | 50 | Rm | 15 ₹750 Lowest | 25 ₹1,250 | 20 ₹1,000 | 15 ₹750 Lowest | 15 ₹750 Lowest | 20 ₹1,000 | 15 ₹750 Lowest | 16 ₹800 |
| 6.00 | Taking up or down steel tubing 20 mm and connections, including cleaning for refixing or removal to store etc complete all as directed. | 227 | Rm | 20 ₹4,540 | 40 ₹9,080 | 20 ₹4,540 | 20 ₹4,540 | 15 ₹3,405 Lowest | 25 ₹5,675 | 15 ₹3,405 Lowest | 18 ₹4,086 |
| 7.00 | Taking up or down steel tubing 25 mm and connections, including cleaning for refixing or removal to store etc complete all as specified and as directed . | 240 | Rm | 25 ₹6,000 | 40 ₹9,600 | 25 ₹6,000 | 25 ₹6,000 | 15 ₹3,600 Lowest | 30 ₹7,200 | 20 ₹4,800 | 20 ₹4,800 |
| 8.00 | Taking down Chowkhats or frames not exc. 1.5 sq. m each (without taking off shutters from the frames) complete all as specified and as directed . | 857 | Each | 80 ₹68,560 | 150 ₹1,28,550 | 100 ₹85,700 | 150 ₹1,28,550 | 150 ₹1,28,550 | 50 ₹42,850 Lowest | 150 ₹1,28,550 | 121 ₹1,03,697 |
| 9.00 | Taking down chowkats or frames with shutters exc 1.5 sqm but n.exc 4 sqm each (without taking off shutters from the frame) complete all as specified and as directed . | 175 | Each | 130 ₹22,750 | 150 ₹26,250 | 100 ₹17,500 Lowest | 170 ₹29,750 | 150 ₹26,250 | 100 ₹17,500 Lowest | 150 ₹26,250 | 150 ₹26,250 |
| 10.00 | M&L for rendering 5 mm thick on ceilings in CM (1:3) finished even and smooth without using extra cement complete all as specified and as directed . | 298 | Sqm | 156 ₹46,488 | 280 ₹83,440 | 250 ₹74,500 | 150 ₹44,700 | 220 ₹65,560 | 210 ₹62,580 | 200 ₹59,600 | 141 ₹42,018 Lowest |
Tender Value
₹6.2 Cr
EMD Value
₹6.3 L
Closing Date
15 Jul 2026, 6:00 pmClosed
Chief Engineer AF Bangalore
Chief Engineer AF Bangalore No. 2 DC Area MES Road Yeshwantpur Post Bangalore 560022
SPECIAL REPAIRS TO LIVING-IN AIRMEN BILLETS AT AFA HYDERABAD
2026_MES_766278_1
801708/AF/E8
Open Tender
Civil Works
Item Rate
365 days
GE(AFA)HYDERABAD
AS PER NIT
8 documents required · 8 mandatory
₹3,000
GE(AFA)HYDERABAD
₹6.3 L
Yes
14 Aug 2026
19 May 2026
22 Jul 2026
19 May 2026
15 Jul 2026
3 Jul 2026
20 May 2026 - 29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SPECIAL REPAIR B/R:-
Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises to a out side of MoD land complete all as specified and directed.. | 1,302 | Square metre | - | - |
| 2 | Taking down of cement or cement lime plaster of any description any thickness on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc and removing rubbish off the premises to a out side of MoD land complete all as specified and directed. | 685 | Square metre | - | - |
| 3 | Demolition of Plain cement concrete (un reinforced) of any description and any position as roof kerbs coving ,padding etc,over roof and removing the debries out side of MoD land complete all as specified and direct. | 83 | Cubic Metre | - | - |
| 4 | Demolition of reinforced cement concrete of any description , any grade and in any position including reinforcement cut as required to facilitate demolition as in water tanks including base beams, shelves, platform etc and removing the debries out side of MoD land complete all as specified and directed. | 1 | Cubic Metre | - | - |
| 5 | Taking up or down steel tubing 15 mm and connections, including cleaning for refixing or removal to store etc complete all as directed. | 50 | Running Metre | - | - |
| 6 | Taking up or down steel tubing 20 mm and connections, including cleaning for refixing or removal to store etc complete all as directed. | 227 | Running Metre | - | - |
| 7 | Taking up or down steel tubing 25 mm and connections, including cleaning for refixing or removal to store etc complete all as specified and as directed . | 240 | Running Metre | - | - |
| 8 | Taking down Chowkhats or frames not exc. 1.5 sq. m each (without taking off shutters from the frames) complete all as specified and as directed . | 857 | Each | - | - |
| 9 | Taking down chowkats or frames with shutters exc 1.5 sqm but n.exc 4 sqm each (without taking off shutters from the frame) complete all as specified and as directed . | 175 | Each | - | - |
| 10 | M&L for rendering 5 mm thick on ceilings in CM (1:3) finished even and smooth without using extra cement complete all as specified and as directed . | 298 | Square metre | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
801708TENDER.pdf
Tender Documents • 0.93 MB
BOQ_858193.xls
BOQ • 0.61 MB
801708Corrigendum05.pdf
PDF • 0.76 MB
801708corri04.pdf
PDF • 0.54 MB
801708corri.pdf
PDF • 0.53 MB
801708Corrigendum01.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .