| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.1 LAdmitted-Finance 73 KOVILPATTI ROAD RAM SINGH NAGAR MANAPPARAI TRICHY DISTRICT | MANAPPARAI | TRICHY | TAMIL NADU | ₹22.1 L | L1 | Admitted-Finance |
| 2 | L2₹22.7 LAdmitted-Finance | ₹22.7 L | L2 | Admitted-Finance |
| 3 | L3₹23.5 LAdmitted-Finance | ₹23.5 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRI HARI RAMAJAYAM CONSTRUCTION L3 | YESVEE ANANTH BUILD-CON PRIVATE LIMITED L1 | THILLAI CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Strengthening to the road from Engumapatty road via Kolaikaranpatty in Sooliyapatti Panchayat KM 0/0 - 0/530 (R 529) Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes , scrubs, saplings and trees exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 806.4 | sq.m | 8 ₹6,451.20 | 5 ₹4,032 | 6 ₹4,838.40 |
| 2.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 162 | cu.m | 145 ₹23,490 | 120 ₹19,440 | 140.2 ₹22,712.40 |
| 3.00 | Providing and Laying US gravel soling to compacted thick including cost and conveyance of gravel from approved sources to works site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. | 151.2 | cu.m | 365 ₹55,188 | 350 ₹52,920 | 354.5 ₹53,600.40 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., | 315 | cu.m | 2,750 ₹8.7 L | 2,600 ₹8.2 L | 2,653.1 ₹8.4 L |
| 5.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 2,100 | sq.m | 95 ₹2.0 L | 80 ₹1.7 L | 87.9 ₹1.8 L |
| 6.00 | Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 2,100 | sq.m | 25 ₹52,500 | 20 ₹42,000 | 20.7 ₹43,470 |
| 7.00 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 63 | cu.m | 12,000 ₹7.6 L | 11,750 ₹7.4 L | 11,879.1 ₹7.5 L |
| 8.00 | Citizen Information Board, Name Board, Logo Board | 1 | Nos | 5,000 ₹5,000 | 5,000 ₹5,000 | 5,000 ₹5,000 |
| 9.00 | HM Stone | 2 | Nos | 585 ₹1,170 | 570 ₹1,140 | 574.5 ₹1,149 |
| 10.00 | 60cm Equilateral Triangle cautionary sign board | 2 | Nos | 4,999 ₹9,998 | 4,999 ₹9,998 | 4,999 ₹9,998 |
Tender Value
₹23 L
EMD Value
₹23,000
Closing Date
10 Mar 2026, 3:00 pmClosed
BDO VP
Panchayat Union Office Manapparai
Strengthening to the road From Engumampatti Road via kolikaranpatti in Sooliyapatti (0/0-0/530 km) (R 529) Manapparai Block in Tiruchirappalli District under CFC Savings Fund 2025-26
2026_RDTN_672570_1
B3/0093/2026 dt 05.02.2026
Open Tender
Civil Works - Roads
90 days
Manapparai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹23,000
13 Mar 2026
9 Mar 2026
10 Mar 2026
9 Mar 2026
10 Mar 2026
9 Mar 2026
Strengthening to the road from Engumapatty road via Kolaikaranpatty in Sooliyapatti Panchayat KM 0/0 - 0/530 (R 529) Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes , scrubs, saplings and trees exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying US gravel soling to compacted thick including cost and conveyance of gravel from approved sources to works site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Citizen Information Board, Name Board, Logo Board
HM Stone
60cm Equilateral Triangle cautionary sign board
60cm Circle Mandatory sign board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Techbidengu.pdf
Tender Documents • 0.61 MB
BOQ_808298.xls
BOQ • 0.28 MB
pricebidengu.pdf
Additional Documents • 0.49 MB
Download all tender documents and submit your bid