Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAccepted-AOC | ₹23.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹24.2 LRejected-AOC | ₹24.2 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MUNEER K L1 | JIJOMON A G L2 |
|---|---|---|---|---|---|
| 1.00Anganwadi construction | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 28.41 | cum | 359.11 ₹10,200.88 | 366.91 ₹10,422.45 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 8.42 | cum | 7,919.4 ₹66,649.67 | 8,091.55 ₹68,098.48 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.35 | cum | 10,470.94 ₹55,977.65 | 10,698.55 ₹57,194.45 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.82 | cum | 12,750.47 ₹1.4 L | 13,027.62 ₹1.4 L |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 10.35 | cum | 8,329.31 ₹86,208.36 | 8,510.36 ₹88,082.23 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 87.92 | sqm | 761.58 ₹66,958.11 | 778.14 ₹68,414.07 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 24.96 | sqm | 385.5 ₹9,622.08 | 393.88 ₹9,831.24 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 34.32 | sqm | 1,006.84 ₹34,554.75 | 1,028.72 ₹35,305.67 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 53.04 | sqm | 959.61 ₹50,897.71 | 980.46 ₹52,003.60 |
Updated dates
Tender Value
₹23.7 L
EMD Value
₹50,000
Closing Date
5 Nov 2025, 1:00 pmClosed
MUNICIPAL ENGINEER
ALAPPUZHA MUNICIPALITY
Annual Plan-Alappuzha Municipality 2025-26 - Proj. No.722-CONSTRUCTION OF No.168- ANGANVADY IN MANNATH WARD
2025_LSGD_815814_1
T17/722/ME/LSGD/AMC/P3/2025
Open Tender
Civil Works - Buildings
ALAPPUZHA MUNICIPALITY
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
14 Feb 2026
28 Oct 2025
5 Nov 2025
28 Oct 2025
5 Nov 2025
28 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1366010.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 2.39 MB
BOQ_1366010.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid