Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.3 LAccepted-Finance 1759 SECOND FLOOR SECTOR 28 FARIDABAD 121008 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121008 | L1 | Accepted-Finance L1 | |
| 2 | L2₹26.4 L+₹17,000 (0.65%)Accepted-Finance AATISH BAZAN STREET SAHARANPUR SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | L2 | Accepted-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹78,000
Closing Date
12 Dec 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE EM SHP
OFFICE OF EXECUTIVE ENGINEER (EM-SHP), UJVN LIMITED, MANERI BHALI, COLONY, PRAGATIPURAM, RISHIKESH
9/EE(EM)/(SHP)/RISHIKESH/23-24
2023_UJVN_65582_1
9/EE(EM)/(SHP)/RISHIKESH/23-24
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
120 days
Bhatwari Uttrakashi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
UJVN Ltd., Pragatipuram, Maneribhali colony, Rishi
₹78,000
19 Feb 2024
11 Nov 2023
15 Dec 2023
11 Nov 2023
12 Dec 2023
11 Nov 2023
Amount
Butterfly Valve Assembly:- a) Dismantling of complete BFV, fixing of dummy plates on penstock. Shifting of BFV assembly to factory for all repairing & testing works. b) Inspection, Cleaning , Replacement of BFV disc seal, repairing of SSseal locking ring, drilling and tapping,replacement of damaged SS hardware, adjustmentofseal, drytesting BFV completeinall respect including all men,material& allT&Prequiredfor propercompletion of work including replacement of all fixing bolts & nuts make TVS/Unbrako 8.8 grade. c) Butterfly valve housing inside seal seating area (stainless steel) complete repair by welding and machining after dismantling of disc and bushes. d) Supply/replacement of damaged DU bushes, fixing of DU bushesby usingnitrogen gas cooling method at driving andnon driving end of BFV disc. e) BFV Servomotor:- Complete repair and servicing of servomotor by replacing seal, Hardware’s etc.
RUNNER ASSEMBLY:- Dismantling of runner assembly, measuring blade profile, inlet & discharge area dimension, welding by using rod SS 309 MO with proper heat treatment process, grinding, profile making, machining and dynamic balancing of Runner. Maintaining Final dimension as per drawing for full load output capacity in all respect including all man & material required for proper completion of work.
TOP COVER:- Dismantling, Removal of damaged crack portion by deep cutting, grinding, welding by using rod SS 309 MO, complete filling of SS metal by SS 309MO welding rod on the labyrinth ring portion or replacement of new labyrinth ring where the runner to labyrinth ring gap 0.6mm to be maintained ( presently it is 1.86mm) as per OEM Drawings, complete machining of welded portion , testing-complete in all respect including all man & material required for proper completion of work .
BOTTOM COVER:- Dismantling, Removal of damaged crack portion by deep cutting, grinding, welding by using rod SS 309 MO, complete filling of SS metal by SS 309MO welding rod on the labyrinth ring portion OR Replacement of labyrinth ring with new where the runner to labyrinth ring gap 0.6mm to be maintained ( presently it is 1.86mm) as per OEM Drawings, complete machining of welded portion , testing-complete in all respect including all man & material required for proper completion of work.
GUIDE VANE ASSEMBLY:- a) Dismantling, removal of damaged portion by deep grinding, welding & profile grinding of Guide vanes (24Nos), welding work shall be in slow welding and long cooling concept to avoid any thermal stress or any deviation in Guide vanes dimension, replacement of O-rings at housing area, housing cover bush at driving and non driving end , Proper Setting of all 24 Nos of guide vanes according to the dimension in drawing ,link & lever drilling, tapping , reaming, replacement of damaged dowel pin & circlip, dry testing and operation- complete in all respect including all man and material required for proper completion of work.
b) Replacement of damaged regulating ring bearing balls, proper greasing, proper setting of regulating ring with GV Link & liver assembly and dry testing, complete in all respect including all man and material required for proper completion of work.
STUFFING BOX:- Complete repairing of stuffing box by welding, grinding and machining of seal seating area for proper function including all man and material required.
SHSFT SLEEVE:- complete Shaft seal sleeve Rectification/repair work by ss welding and machining complete in all respect including all men, material & all T&P required for proper completion of work.
TURBINE DE BEARING:- Turbine DE Bearing: Complete dismantling of DE bearing top housing, bottom housing, inspection of thrust collar, bearing thrust pads, rebabitting of thrust pads 24 nos if required , Ultrasonic testing of pads,cleaning, scrapping, adjustment and blue matching of pads & testing complete in all respect including all men, all T&P required for proper completion of work.
Replacement of Generator Terminal Connector:- Complete replacement of damaged terminal connector with proper fit and proper clearance, clean metals before brazing, flux the parts, braze the assembly point, clean the Brazed point, apply main insulation glass based mica paper tape on brazed area and apply varnish, connecting of terminal , meggering of IR Value, Testing & energizing of Generator complete in all respect including all men, all T&P required for proper completion of work.
Box up, Final Testing & Synchronization of Machine: - Complete reassembly of turbine components, replacements of all dummy plug of turbine levelling and alignment of complete turbine and generator assembly, testing & commissioning of the unit.
LINKER ENGINEERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .