| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC | L1 | Accepted-AOC Lowest rate hence ACCEPTED | |
| 2 | L2₹14.0 L+₹72,540.42 (5.46%)Rejected-AOC | L2 | Rejected-AOC Higher rate hence REJECTED |
Tender Value
₹16.1 L
EMD Value
₹40,195
Closing Date
17 Nov 2023, 5:00 pmClosed
Seena T O,Executive Engineer
MVIP Division NO. 4, Piravom
GENERAL-MVIP CADA-MVIP-CADWMExtension of existing leading channel at ch.8300m to Thiruvambady padasekharam from Ettumanoor branch canal-General Civil Work
2023_Irrig_618177_1
IRR/PII/TR/4084/2023_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
kuruppanthara
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹40,195
27 Dec 2023
2 Nov 2023
23 Nov 2023
2 Nov 2023
17 Nov 2023
2 Nov 2023
Amount
Field Channel
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.22.5:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire fabric
OD25972/2023-2024:Providing notice board at site of size 90cmx60cm, using 0.8mm thick G.I sheet, 50mm dia G.I pipe 2.5m long on either sides (fixing in CC 1:2:4 foundation 30cmx30cmx75cm size ), 30mmx 30mmx4mm MS equal angle frame including all cost of labour, conveyance, erection charges and painting two coat with synthetic enamel paint over priming coat with cost and conveyance of all materials and labour charges etc complete as directed by the department officers at site.
Notice board-Lettering
8.3.2:Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman Hyphens and the like not to be measured and paid for
Saju C S
Bidder Name
Saju C S
Ginesh k sankar
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_927664.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .