| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAccepted-AOC | ₹4.3 Cr | L1 | Accepted-AOC agreement executed by L1 |
| 2 | L2₹4.7 CrRejected-AOC UNIT 505 GERA IMPRERIUM GRAND PATTA PLAZO PANAJI GOA | ₹4.7 Cr | L2 | Rejected-AOC agreement executed by L1 |
| Sl No | Description | Qty | Unit | ASSMAS CONSTRUCTIONS PVT LTD L2 | Ceeyech Construction Private Limited L1 |
|---|---|---|---|---|---|
| 1.00BRIDGE PROPER | |||||
| 1.00 | 14.1.C.1:Furnishing and Placing Reinforced Cement Concrete Grade M30 Using Concrete Mixer in super-structure as per drawing and Technical Specification | 8.43 | cum | 11,382 ₹95,893.35 | 10,341.21 ₹87,124.69 |
| 1.00 | 12.22:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. | 7.1 | MT | 1,22,808 ₹8.7 L | 1,41,601.69 ₹10.1 L |
| 1.00 | 12.24.3:Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1000 mm | 156 | metre | 16,608 ₹25.9 L | 12,478.41 ₹19.5 L |
| 1.00 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 52.09 | MT | 95,536 ₹49.8 L | 1,09,834.91 ₹57.2 L |
| 1.00 | 12.1.5.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Marshyn Soil - Depth upto 3 m - Mechanical Means - | 685.18 | cum | 285 ₹2.0 L | 335.31 ₹2.3 L |
| 1.01 | 12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork) <br> | 15.22 | cum | 7,831 ₹1.2 L | 8,904.47 ₹1.4 L |
| 1.01 | 12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump | 138 | cum | 10,482 ₹14.5 L | 9,343.47 ₹12.9 L |
| 1.01 | 13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m | 85.77 | cum | 14,061 ₹12.1 L | 9,756.14 ₹8.4 L |
| 1.01 | 13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications | 17.15 | MT | 96,222 ₹16.5 L | 1,10,368.15 ₹18.9 L |
Tender Value
₹4.3 Cr
EMD Value
₹1 L
Closing Date
2 Feb 2026, 11:00 amClosed
Superintending Engineer,PWD Bridges,NC KKD
Office of the Superintending Engineer, PWD Bridges, North Circle, Thondayad, Kozhikode 673017
GENERAL-Reconstruction of Wadakkanchery Ottupara Old Bridge in Kodungallur Shornur road in Wadakkanchery Constituency-Reconstruction of Wadakkanchery Ottupara old bridge in Kodungallur Shornur road in Wadakkanchery Constituency-General CivilWork
2026_PWD_827101_1
PWD/BR/TR/102222/2021_5_1_1/1
Open Tender
Civil Works - Bridges
365 days
Ottupara, Wadakkanchery
Please refer Tender documents.
9 documents required · 9 mandatory
₹8,270
Yes
₹1 L
Yes
28 Feb 2026
12 Jan 2026
4 Feb 2026
12 Jan 2026
2 Feb 2026
12 Jan 2026
BRIDGE PROPER
14.1.C.1:Furnishing and Placing Reinforced Cement Concrete Grade M30 Using Concrete Mixer in super-structure as per drawing and Technical Specification
12.22:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing.
12.24.3:Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1000 mm
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.1.5.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Marshyn Soil - Depth upto 3 m - Mechanical Means -
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork) <br>
12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump
13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
14.1D.2.2.A:"Furnishing and Placing RCC/PSC Grade M35 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification. For T-beam & slab - Height upto 5m"
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
14.7:Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, center to center spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
ROAD FORMATION
OD199174/2025-2026:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete (as per approved observed data of Building 50.2.3.1)
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
OD175645/2025-2026:Filling available excavated earth (excluding rock) in Approach road in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
14.1.C.1:Furnishing and Placing Reinforced Cement Concrete Grade M30 Using Concrete Mixer in super-structure as per drawing and Technical Specification
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
14.11:Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification.
4.1.A.1:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.3.1.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder (VG 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction. For Grading I ( 40 mm nominal size )
5.6.1.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.2 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - I ( 19 mm nominal size )
14.4:Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications.
OD131606/2024-2025:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand). Dark shade pigment using ordinary cement.
OD200291/2025-2026:Putting up ring bund of top width 1.50m, bottom width 2.50m.and average height of 2.00m with 1:1/4 side slope and protect the sides with coconut post of 4.00m long driving down 2.00m below bed level at 75cm c/c, providing 3 rows of weiling pieces 1/4 split coconut post on both sides and 1/4 split cross ties to alternate posts at top, bottom and middle portion and screening the sides of bund with Seperation memebrane of impermeable plastic sheet 125 micron thick fixed properly using coconut post and weiling pieces using reeper and nails in full height including tying properly using iron wire and coir altogether and supply and filling inside with hard clay/cut earth up to 2.50m, levell and conveyed with all leads and lifts including consolidating properly and maintaing the bund till the work is completed and dismantling the bund after completion of work etc. as per the directions of departmental officers at site. Bottom width 2.50m, Height 2.0m Side slope 1:1/4 Length of coconut pile 4.00m Spacing 0.75m No. of leyers 2 Length of full coconut pile required for 10m = ((10/0.75)+1)x2x4.0 = 114m Length of (1/4 split) coconut cross ties for 10m = 3x2.0 av. x 6 Nos. = 36.00 m Length of 1/4 split weiling pieces for 10m = 3x2x10 = 60m cost of full coconut post (Details vide 60.64.1), Coconut post required for 1m =114/10 = 11.4m (average length of coconut pile is 6 m ) Assuming cocunut post can be used 2 times No. of coconut pile required for 1m = 11.4/6 = 2.0nos. Carriage of timber = 2.0x6x3.14x0.1x0.1 = 0.3768 cum Assume 3 rows wailing pieces in both sides and 3 cross ties, Total 36+60 - 96.00m Hence for 1.0m = 96/10 = 9.60m 6m long coconut tree equals 24m 1/4 split coconut piles , coconut post required = 9.6/24 = 0.40nos. Carriage required = 6x3.14x0.10x0.10 = 0.1884cum Sawing area for 1m = 0.375x6x2x0.2 = 0.90sq.m Carpenter II class required = (4.3/10)x1.125 = 0.4838nos. Totla no.of coconut pile for 10m length @ 0.75m c/c = 10/0.75+1 = 14 nos on both sides = 14x2 = 28 nos. for 1m length = 28/10 = 2.8 nos Pile driving down length = 2.00m total length 2.0x2.8 = 5.6m Screening the frame with polythene sheet nailed to wailing pieces and coconut post, Plythene sheet require =10.3x2x2.0 = 41.20sqm For 1m = 41.20/10 = 4.12sqm Quantity of clay = (1.5+2.75)/2x2.0 = 4.08cum Ref CTE data 5.3
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
side protection
3.13.1.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Manual Means - (Depth upto 3 M)
OD17621/2025-2026:Dry rubble masonry including all cost of materials and labour charges etc complete.
OD17665/2025-2026: Rough stone dry packing using departmental rubble and blinded with 0.30 m3 of M sand and including cost conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
OD17630/2025-2026:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost coveyance labour charges etc complete. (OD of CTE approved OD 3.1)
OD17635/2025-2026:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length (OD of CTE approved data 3.2)
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.G.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.5.G.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M30 - Height upto 5m - using Batching Plant, Transit Mixer and Concrete Pump
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
13.5.A:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M15 - Height upto 5m
13.10:Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
14.1.A.1.A:Furnishing and Placing Reinforced Cement Concrete Grade M20 Using Concrete Mixer as per drawing and Technical Specification. For solid slab super-structure - Height up to 5m
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
OD16490/2025-2026:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. (CTE approved OD 2.2)
Traffic saftey works
55.10.2:Providing and erecting retro-reflectorised Object Hazard Marker 450mm x 900mm Providing and erecting retro-reflectorised Object Hazard Marker sign with 07 years warranty, manufactured as per IRC 67 USING Type IV ASTM D 4956-09 micro prismatic retro reflective sheeting fixed over aluminium sheetig, 2 mm thick / aluminium composit material sheeting 4 mm thick with suitable back support frame and supported on a mild steel angle iron post 75mmx75mmx6mm, firmly fixed 30cm above ground level by means of properly designed foundation with M 15 grade cement concrete 30cmx30x45cm, 45cm below ground level including painting all non-reflective faces with epoxy paint 2 coats over epoxy primer as per approved drawing and clause 801. 450mm x 900 mm
55.12:Providing and fixing of median marker Providing and fixing of median marker made of tough, high impact resistant, injection-molded, thermoplastic body having a mnimum Notched Izod Impact strength value of 600J/m at room temperature, when tested accordance with ASTM D256 and shall retain at least 70% of this value when subjected to accelerted weathering for 1000hrs as per ASTM G155 or UL 746C. The Median marker shall have, fluorescent yellow color retro-reflective sheeting min 10cmx10cm/10cm dia size with reflectivity values as per IRC:67 and ASTM D4956 type XI specifications , edge protected with no exposed edges to prevent edge lifting, vandalism, sheeting damage, etc. and fixed by a combination of epoxy adhesive and anchoring
55.14:Providing and fixing retro-reflectorised ceramic tilesProviding and fixing retro-reflectorised ceramic tiles of size 10cmX20cm using High Intensity Micro Prismatic (Type IV) grade sheeting with 7 years warranty fixed over Ist quality ceramic glazed tiles including cost of glue, cutting charges, fixing with suitable adhisive on concrete or other surface etc complete.
8.1.A:Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC Using Concrete Mixer on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
8.4.1:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminum sheeting, 2 mm thick/aluminum composite material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 90 cm equilateral triangle
8.5:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
55.16:Providing and fixing guard post Providing and fixing guard post of size 200mmx200mm, 1400mm long, 800mm above ground level and 600mm below GL. casted in M20 Grade concrete reinforced with 4 nos of 8mm dia longitudinal bars and 6mm dia stirrups @ 100mm c/c, firmly fixed in position by means of foundation of size 0.5mx0.5mx0.7m in M15 grade concrete below ground level including painting 2 coats on exposed surface with synthetic enamel paint in alternate white & black band 20cm wide
OD134787/2024-2025:Engraving letters in hard stone (DAR-16.21)
OD134788/2024-2025:Providing and fixing Inaugration Granite Stone of 18mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut of required size, approved shade , colour and texture laid over 12 mm thick base cement mortar 1:3 (1 cement:3 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high glass finish etc. complete at all levels. Area of slab upto 0.50 Sqm.
Dismantling and tree cutting
2.4.4.D:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Dry rubble masonry
2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means
2.1.1:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit.<br> Girth from 300 mm to 600 mm
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1387821.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
sbdo.pdf
Tender Documents • 1.64 MB
BOQ_1387821.xls
BOQ • 0.35 MB
GAD_NOTE_merged.pdf
Other Document • 1.73 MB
Download all tender documents and submit your bid