Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
6 Jun 2026, 6:00 pmClosed
Superintending Engineer, PIU, Zone-6, Vadodara.
Annual Rate Contract of Civil Work in Government Health Care Facilities & Buildings of Ta:- Padra & Karjan Dist.Vadodara.
306334
2026-27/06/07
Open
Civil Works - Buildings
Works
Vadodara
3 documents required · 3 mandatory
₹2,400
PIU-General Fund A/c 11-114
₹1 L
19 May 2026
19 May 2026
19 May 2026
6 Jun 2026
19 May 2026
Name Of Work : Annual Rate Contract of Civil Work in Government Health Care Facilities & Buildings of Ta:- Padra
& Karjan Dist.Vadodara
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Rupees One Thousand Eight
Lime Mortar 1:1 (1-lime putty/ Equivalent dry
1 02001A 2.5.1 cu.m 1825.25 1843.50 Hundred Forty Three and Paisa
Hydrated Lime : 1-Fine sand)
Rupees One Thousand Six
Lime Mortar 1:2 (1-lime putty/ Equivalent dry
2 02002A 2.5.2 cu.m 1649.33 1665.82 Hundred Sixty Five and Paisa
Hydrated Lime : 2-Fine sand)
Eighty Two Only
Rupees One Thousand Five
Lime Mortar 1:3 (1-lime putty/Equivalent dry
3 02003A 2.5.3 cu.m 1561.61 1577.23 Hundred Seventy Seven and
Hydrated Lime : 3 - Fine sand)
Paisa Twenty Three Only
Rupees One Thousand Seven
Lime Mortar 1:1.5 (1-lime putty/ Equivalent dry
4 02004A 0 cu.m 1755.32 1772.87 Hundred Seventy Two and Paisa
Hydrated Lime : 1.5 Fine sand)
Eighty Seven Only
Rupees Six Thousand Two
5 02005A 2.5.11 Cement Mortar 1:1 (1-Cement: 1- fine sand) cu.m 6157.18 6218.75 Hundred Eighteen and Paisa
Seventy Five Only
Rupees Four Thousand Four
6 02006A 2.5.12 Cement Mortar 1:2(1-Cement: 2-fine sand) cu.m 4424.56 4468.81 Hundred Sixty Eight and Paisa
Eighty One Only
Rupees Three Thousand Five
7 02007A 2.5.13 Cement Mortar 1:3(1-Cement: 3- fine sand ) cu.m 3558.63 3594.22 Hundred Ninety Four and Paisa
Twenty Two Only
Rupees Two Thousand Eight
8 02008A 2.5.14 Cement Mortar 1:4(1-Cement: 4- fine sand ) cu.m 2868.29 2896.97 Hundred Ninety Six and Paisa
Ninety Seven Only
Rupees Two Thousand Five
9 02009A 2.5.15 Cement Mortar 1:5(1-Cement: 5- fine sand ) cu.m 2496.57 2521.54 Hundred Twenty One and Paisa
Fifty Four Only
Rupees Two Thousand One
10 02010A 2.5.16 Cement Mortar 1:6(1-Cement: 6- fine sand ) cu.m 2177.95 2199.73 Hundred Ninety Nine and Paisa
Seventy Three Only
Rupees Three Thousand Six
11 02011A 2.5.18 Cement Mortar 1:3 (1-Cement: 3 - coarse sand) cu.m 3585.21 3621.06 Hundred Twenty One and Paisa
Rupees Two Thousand Nine
12 02012A 2.5.19 Cement Mortar 1:4 (1-Cement: 4 - coarse sand) cu.m 2894.87 2923.82 Hundred Twenty Three and
Paisa Eighty Two Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Rupees Two Thousand Five
13 02013A 2.5.20 Cement Mortar 1:5 (1-Cement: 5 - coarse sand) cu.m 2523.15 2548.38 Hundred Forty Eight and Paisa
Thirty Eight Only
Rupees Two Thousand Two
14 02014A 2.5.21 Cement Mortar 1:6 (1-Cement: 6 - coarse sand) cu.m 2204.54 2226.59 Hundred Twenty Six and Paisa
Fifty Nine Only
Rupees One Thousand Nine
15 02015A 0 Cement Mortar 1:8 (1-Cement: 8 - fine sand) cu.m 1885.92 1904.78 Hundred Four and Paisa Seventy
Rupees One Thousand Seven
Lime Mortat 1:1.5 (1- Lime putty / Equivalent dry hydrated
16 02016A 0 cu.m 1777.43 1795.20 Hundred Ninety Five and Paisa
Lime:1.5 coarse sand)
EARTH WORK (EXECUTED WITH MECHANISED EFFORTS/ MACHINARIES)
Excavation for foundation upto 1.5 m depth including sorting out
and stacking of useful materials and disposing off the Rupees One Hundred Twenty
excavated stuff upto 50 Meter lead.(A) and Paisa One Only
Loose or soft soil
Excavation for foundation upto 1.5 m depth including sorting out
and stacking of useful materials and disposing off the Rupees One Hundred Fifty Three
excavated stuff upto 50 Meter lead.(B) and Paisa Forty One Only
Dense or Hard soil
Excavation for foundation upto 1.5 m depth including sorting out
and stacking of useful materials and disposing off the Rupees Two Hundred Sixty Two
excavated stuff upto 50 Meter lead.(C) and Paisa Fifty Two Only
Excavation for foundation upto 1.5 m depth including sorting out
and stacking of useful materials and disposing off the Rupees Two Hundred Seventy
excavated stuff upto 50 Meter lead.(D) Soft rock not requiring One and Paisa Forty Five Only
Excavation for foundation upto 1.5 m depth including sorting out
and stacking of useful materials and disposing off the Rupees Six Hundred Twelve and
excavated stuff upto 50 Meter lead.(E) Paisa Fifty Three Only
Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials and Rupees One Hundred Thirty
disposing off the excavated stuff upto 50 Meter Three and Paisa Five Only
lead.(A) Loose or soft soil
Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials and Rupees One Hundred Sixty Six
disposing off the excavated stuff upto 50 Meter and Paisa Forty Four Only
lead.(B) Dense or Hard soil
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials and Rupees Two Hundred Eighty
disposing off the excavated stuff upto 50 Meter and Paisa Thirty Eight Only
lead.(C) Hard Murrum
Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials and Rupees Two Hundred Ninety
disposing off the excavated stuff upto 50 Meter lead. (D) Soft Four and Paisa Sixty Seven Only
rock not requiring Blasting
Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials and Rupees Six Hundred Thirty Five
disposing off the excavated stuff upto 50 Meter and Paisa Seventy Four Only
lead.(E) Hard Rock
Excavation for foundation for depth from 3.0 m to 5.0 m
including sorting out and stacking of useful materials and Rupees One Hundred Forty Six
disposing off the excavated stuff upto 50 Meter and Paisa Nine Only
lead.(A) Loose or soft soil
Excavation for foundation for depth from 3.0 m to 5.0 m
including sorting out and stacking of useful materials and Rupees One Hundred Seventy
disposing off the excavated stuff upto 50 Meter Eight and Paisa Fifty Eight Only
lead.(B) Dense or Hard soil
Excavation for foundation for depth from 3.0 m to 5.0 m
including sorting out and stacking of useful materials and Rupees Two Hundred Ninety
disposing of the excavated stuff upto 50 Meter Two and Paisa Eighty Seven Only
lead.(C) Hard Murrum
Excavation for foundation for depth from 3.0 m to 5.0 m
Rupees Three Hundred
including sorting out and stacking of useful materials and
30 04003D 0 cu.m 314.73 317.88 Seventeen and Paisa Eighty Eight
disposing off the excavated stuff upto 50 Meter lead.(D) Soft
rock not requiring Blasting
Excavation for foundation for depth from 3.0 m to 5.0 m
including sorting out and stacking of useful materials and Rupees Six Hundred Fifty Eight
disposing off the excavated stuff upto 50 Meter and Paisa Ninety Six Only
lead.(E) Hard Rock
Extra for additional depth more than 5.0 m for excavation for
foundation including sorting out and stacking of useful materials Rupees Twenty One and Paisa
and disposing of the excavated stuff upto 50 m lead.(A) Loose or Sixty Four Only
Extra for additional depth more than 5.0 m for excavation for
foundation including sorting out and stacking of useful materials Rupees Twenty One and Paisa
and disposing off the excavated stuff upto 50 m lead.(B) Dense or Sixty Four Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Extra for additional depth more than 5.0 m for excavation for
foundation including sorting out and stacking of useful materials Rupees Twenty Nine and Paisa
and disposing of the excavated stuff upto 50 m Seventy Six Only
lead.(C) Hard Murrum
Extra for additional depth more than 5.0 m for excavation for
foundation including sorting out and stacking of useful materials Rupees Thirty Eight and Paisa
and disposing off the excavated stuff upto 50 m lead.(D) Soft Forty Two Only
rock not require Blasting
Extra for additional depth more than 5.0 m for excavation for
foundation including sorting out and stacking of useful materials Rupees Thirty Eight and Paisa
and disposing of the excavated stuff upto 50 m Forty Two Only
lead.(E) Hard Rock
Add extra for Disposing off the excavated stuff of Rupees Seventeen and Paisa
above items for lead of (A) 50 m to 100 m Forty Five Only
Add extra for Disposing off the excavated stuff of Rupees Thirty Four and Paisa
above items for lead of (B) 100 m to 200 m Ninety One Only
Add extra for Disposing off the excavated stuff of Rupees Fifty Two and Paisa
above items for lead of (C) 200 m to 300 m Thirty Six Only
Add extra for Disposing off the excavated stuff of Rupees Seventy Seven and Paisa
above items for lead of (D) 300 m to 400 m Fifty Seven Only
Rupees One Hundred Twenty
Add extra for Disposing off the excavated stuff of
41 04005E 0 cu.m 128 129.28 Nine and Paisa Twenty Eight
above items for lead of (E) 400 to 500 m
Filling available excavated earth (excluding rock) in trenches.
plinth, sides of foundations etc. in layers not exceeding 20 cm. in Rupees One Hundred Thirty
depth consolidating each disposited layer by ramming and Three and Paisa Sixty Five Only
Filling in plinth with sand under floors including watering Rupees Four Hundred Seventy
ramming, consolidating and dressing complete One and Paisa Sixty Nine Only
Filling in foundation and plinth with murrum or selected
Rupees Two Hundred Ninety Six
44 04008A 0 soil in layers of 20cm. thickness including watering, ramming and cu.m 293.36
and Paisa Twenty Nine Only
consolidating etc. complete.
Filling in foundation and plinth with brick Bats Chhara in
Rupees Six Hundred Fifteen and
45 04009A 0 layers of 20cm. thickness including watering, remming and cu.m 609.48
Paisa Fifty Seven Only
consolidating etc. complete.
Boring holes 3.5 m deep in ordinary soil (for cast in situ piles) and
getting out the soil and disposal of the surplus excavated soil as Rupees One Thousand Eighty
directed within a lead of 50 Meter for following diameter of Seven and Paisa Fifty Six Only
pipes.(i)200 mm
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Boring holes 3.5 m deep in ordinary soil (for cast in situ piles) and
Rupees One Thousand Three
getting out the soil and disposal of the surplus excavated soil as
47 04010B 4.27 Each 1288.97 1301.86 Hundred One and Paisa Eighty
directed within a lead of 50 Meter for following diameter of
pipes.(ii) 250 mm
Boring holes 3.5 m deep in ordinary soil (for cast in situ piles) and
Rupees One Thousand Five
getting out the soil and disposal of the surplus excavated soil as
48 04010C 4.27 Each 1508.22 1523.30 Hundred Twenty Three and
directed within a lead of 50 Meter for following diameter of
Paisa Thirty Only
pipes.(iii) 300 mm
Extra for under reaming inside the bore Holes for under reamed Rupees Four Hundred Thirty
piles of following Diameter.(i) 200 mm Three and Paisa Ninety Six Only
Extra for under reaming inside the bore Holes for under reamed Rupees Five Hundred Twenty
piles of following Diameter.(ii) 250 mm One and Paisa Forty Five Only
Extra for under reaming inside the bore Holes for under reamed Rupees Six Hundred Forty Eight
piles of following Diameter.(iii) 300 mm and Paisa Twenty Five Only
Add to or deduct from the rate for Bore Holes of 3.5 m Depth, if
Rupees Three Hundred Sixty
52 04012A 4.29 bore holes are made deeper or shallower than Each 360.7
Four and Paisa Thirty One Only
3.5M. for Piles of following diameter.(i) 200 mm
Add to or deduct from the rate for Bore Holes of 3.5 m Depth, if
Rupees Four Hundred Eighty
53 04012B 4.29 bore holes are made deeper or shallower than Each 480.93
Five and Paisa Seventy Four Only
3.5M. for Piles of following diameter.(ii) 250 mm
Add to or deduct from the rate for Bore Holes of 3.5 m Depth, if
Rupees Five Hundred Forty Four
54 04012C 4.29 bore holes are made deeper or shallower than Each 539.28
and Paisa Sixty Seven Only
3.5M. for Piles of following diameter.(iii) 300 mm
EARTH WORK (EXECUTED WITH MANUAL LABOUR)
Excavation for foundation upto 1.5 m depth including sorting out
and stacking of useful materials and disposing off the Rupees Two Hundred Eight and
excavated stuff upto 50 Meter lead.(A) Paisa Ninety Three Only
Loose or soft soil
Excavation for foundation upto 1.5 m depth including sorting out
and stacking of useful materials and disposing off the Rupees Two Hundred Sixty Eight
excavated stuff upto 50 Meter lead.(B) and Paisa Twenty Eight Only
Dense or Hard soil
Excavation for foundation upto 1.5 m depth including sorting out
and stacking of useful materials and disposing off the Rupees Four Hundred Fifty Eight
excavated stuff upto 50 Meter lead.(C) and Paisa Seventy Three Only
Excavation for foundation upto 1.5 m depth including sorting out
and stacking of useful materials and disposing off the Rupees Five Hundred Twenty
excavated stuff upto 50 Meter lead.(D) Soft rock not requiring and Paisa Twenty One Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Excavation for foundation upto 1.5 m depth including sorting out
and stacking of useful materials and disposing off the Rupees Nine Hundred Eighty
excavated stuff upto 50 Meter lead.(E) Five and Paisa Thirty Eight Only
Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials and Rupees Two Hundred Thirty and
disposing off the excavated stuff upto 50 Meter Paisa Fifty Seven Only
lead.(A) Loose or soft soil
Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials and Rupees Two Hundred Eighty
disposing off the excavated stuff upto 50 Meter Nine and Paisa Ninety Two Only
lead.(B) Dense or Hard soil
Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials and Rupees Four Hundred Ninety
disposing off the excavated stuff upto 50 Meter One and Paisa Nineteen Only
lead.(C) Hard Murrum
Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials and Rupees Five Hundred Forty Two
disposing off the excavated stuff upto 50 Meter lead. (D) Soft and Paisa Twenty Seven Only
rock not requiring Blasting
Excavation for foundation for depth from 1.5 m to 3.0 m
including sorting out and stacking of useful materials and Rupees One Thousand Twenty
disposing off the excavated stuff upto 50 Meter Three and Paisa Eighty Two Only
lead.(E) Hard Rock
Excavation for foundation for depth from 3.0 m to 5.0 m
including sorting out and stacking of useful materials and Rupees Two Hundred Fifty Two
disposing off the excavated stuff upto 50 Meter and Paisa Twenty One Only
lead.(A) Loose or soft soil
Excavation for foundation for depth from 3.0 m to 5.0 m
including sorting out and stacking of useful materials and Rupees Three Hundred Eleven
disposing off the excavated stuff upto 50 Meter and Paisa Fifty Six Only
lead.(B) Dense or Hard soil
Excavation for foundation for depth from 3.0 m to 5.0 m
including sorting out and stacking of useful materials and Rupees Five Hundred Twelve
disposing of the excavated stuff upto 50 Meter and Paisa Eighty Four Only
lead.(C) Hard Murrum
Excavation for foundation for depth from 3.0 m to 5.0 m
including sorting out and stacking of useful materials and Rupees Five Hundred Eighty Five
disposing off the excavated stuff upto 50 Meter lead.(D) Soft and Paisa Twelve Only
rock not requiring Blasting
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Excavation for foundation for depth from 3.0 m to 5.0 m
including sorting out and stacking of useful materials and Rupees One Thousand Sixty Two
disposing off the excavated stuff upto 50 Meter and Paisa Twenty Eight Only
lead.(E) Hard Rock
Providing and laying in foundation and plinth / under floors lime
Rupees Two Thousand Nine
concrete with hand broken stone aggregates 40mm nominal size
70 05001A 5.1.6 cu.m 2889.31 2918.20 Hundred Eighteen and Paisa
and 40% mortar comprising of 1-Lime putty : 2- Fine sand and
curing complete excluding cost of formwork.
Providing and laying in foundation and plinth / under floors lime
Rupees Two Thousand Eight
concrete with graded brick aggregates 40 mm nominal size and
71 05002A 5.1.8 cu.m 2816.26 2844.42 Hundred Forty Four and Paisa
40% mortar comprising of 1-Limeputty : 2-Fine sand and curing
completeexcluding cost of formwork.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse
sand : 6- hand broken stone aggregates 40 mmnominal size) and Rupees Three Thousand Eighty
curing complete excluding cost of formwork in (A) Foundation and and Paisa Ninety Only
Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse
Rupees Two Thousand Seven
sand : 8- hand broken stone aggregates 40 mm nominal size) and
73 05004A 5.3.3 cu.m 2720.01 2747.21 Hundred Forty Seven and Paisa
curing complete excluding cost of formwork in (A) Foundation and
Twenty One Only
Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse
Rupees Three Thousand Nine
sand : 6- crushed stone aggregates 20 mm nominal size) and
74 05005A 5.3.14 cu.m 3953.57 3993.11 Hundred Ninety Three and Paisa
curing complete including cost of formwork in (A) Wall Caps /
Providing and laying cement concrete 1:5:10 (1- Cement : 5-
Rupees Two Thousand Five
Coarse sand : 10- hand broken stone aggregates 40 mm nominal
75 05006A 5.3.4 cu.m 2554.82 2580.37 Hundred Eighty and Paisa Thirty
size) and curing complete excluding cost of formwork in (A)
Foundation and Plinth
Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse
sand : 6- Graded brick bat aggregate 40mm normal size) and Rupees Three Thousand Sixty
curing complete excluding cost of formwork in (A) Foundation and and Paisa Sixty Five Only
Providing and laying cement concrete 1:4:8 (1- Cement : 4- Coarse
Rupees Two Thousand Seven
sand : 8- Graded Brick bats aggregate 40mm normal size) and
77 05008A 5.3.3 cu.m 2699.96 2726.96 Hundred Twenty Six and Paisa
curing complete excluding cost of formwork in (A) Foundation
Ninety Six Only
Providing and laying cement concrete 1:5:10 (1- Cement : 5- fine
Rupees Two Thousand Five
sand : 10- graded brick bat aggregates 40mm nominal size) and
78 05009A 5.3.8 cu.m 2518.44 2543.62 Hundred Forty Three and Paisa
curing complete excluding cost of formwork in (A) Foundation and
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse Rupees Three Thousand Six
79 05010AA 5.3.13 sand : 4- graded stone aggregates 20 mm nominal size) and curing cu.m 3619.93 3656.13 Hundred Fifty Six and Paisa
complete excluding cost of formwork in (A) Foundation and Plinth Thirteen Only
Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse
Rupees Three Thousand Six
sand : 4- graded stone aggregates 20 mm nominal size) and curing
80 05010BA 5.3.13 cu.m 3619.93 3656.13 Hundred Fifty Six and Paisa
complete excluding cost of formwork in (B)Independent piers,
columns, and pillars, upto floor two level
Providing and laying cement concrete work 1:2:4 (1- Cement : 2-
Coarse sand : 4- graded stone aggregates 20 mm nominal size) Rupees Three Thousand Nine
81 05011AA 5.4.1 and curing complete excluding cost of formwork and cu.m 3892.57 3931.50 Hundred Thirty One and Paisa
reinforcement for reinforced concrete work in (A) Foundations, Fifty Only
footings, Base or columns and Mass concrete
Providing and laying cement concrete work 1:2:4 (1- Cement : 2-
Coarse sand : 4- graded stone aggregates 20 mm nominal size)
and curing complete excluding cost of formwork and Rupees Four Thousand Twenty
reinforcement for reinforced concrete work in (B) Slabs, landing, Three and Paisa Fifty Seven Only
shelves, Balconis , Lintels, Beams, Girders and Cantilever upto
floor two level.
Providing and laying cement concrete work 1:2:4 (1- Cement : 2-
Coarse sand : 4- graded stone aggregates 20 mm nominal size)
Rupees Four Thousand Twenty
83 05011DA 5.4.1 and curing complete excluding cost of formwork and cu.m 3983.73
Three and Paisa Fifty Seven Only
reinforcement for reinforced concrete work in (D) Columns,
Pillars posts and struts upto floor two level.
Providing and laying cement concrete work 1:2:4 (1- Cement : 2-
Coarse sand : 4- graded stone aggregates 20 mm nominal size) Rupees Four Thousand Eight
84 05011EA 5.4.1 and curing complete excluding cost of formwork and cu.m 4778.59 4826.38 Hundred Twenty Six and Paisa
reinforcement for reinforced concrete work in (E)Staircases Thirty Eight Only
excluding landing upto floor two level
Providing and laying cement concrete work 1:2:4 (1- Cement : 2-
Coarse sand : 4- graded stone aggregates 20 mm nominal size) Rupees Four Thousand Two
85 05011KA 5.4.1 and curing complete excluding cost of formwork and cu.m 4218.12 4260.30 Hundred Sixty and Paisa Thirty
reinforcement for reinforced concrete work in (K)Vertical and Only
Horizontial its upto floor two level.
Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse
sand : 4- graded stone aggregates 20 mm nominal size) for
reinforced concrete Chhajjas not exceeding 10cm. thickness upto Rupees Six Thousand Five
86 05012A 5.4.4 floor two level including finishing the exposed surfaces with cu.m 6479.34 6544.13 Hundred Forty Four and Paisa
cement mortar 1:3 (1-cement, 3 Fine sand) to give a smooth and Thirteen Only
even surface centering and formwork and curing complete
excluding cost of reinforcement.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing Mild Steel reinfircement for R.C.C. work including
Rupees Sixty One and Paisa Sixty
87 05013A 5.4.10 bending binding, and placing in position complete upto floor two kg 61.04
Providing H.Y.S.D. Bar reinforcement for R.C.C. work including
Rupees Sixty Three and Paisa
88 05014AA 5.4.11 bending, binding and placing in position complete kg 63.24
Eighty Seven Only
upto floor two level
Providing TMT Bar FE 415 reinforcement for R.C.C. work including
Rupees Sixty Eight and Paisa
89 05014BA 5.4.11 bending, binding and placing in position complete kg 67.65
Thirty Three Only
upto floor two level
Providing TMT Bar FE 500D reinforcement for R.C.C. work
Rupees Seventy Seven and Paisa
90 05014C 5.4.11 including bending, binding and placing in position complete kg 76.52
Twenty Nine Only
upto floor two level
Providing TMT Bar FE 550D reinforcement for R.C.C. work
Rupees Ninety Four and Paisa
91 05014D 5.4.11 including bending, binding and placing in position complete kg 94.05
Ninety Nine Only
upto floor two level
Extra for additional lift of concrete for all R.C.C. work above floor Rupees Thirty Nine and Paisa
two level excluding cost of reinforcment Ninety Five Only
Extra for additional lift of reinforcing steel for all R.C.C.
93 05016A 5.4.13A kg 1.01 1.02 Rupees One and Paisa Two Only
work above floor two level.
Deduct for omiting in R.C.C. work smooth finishing of the exposed
Rupees One Hundred Forty Two
94 5017 5.4.16 surface with cement mortar 1:3 (1-Cement : 3- Sqm 140.89
and Paisa Thirty Only
Providing throating or plaster drip and moulding to R.C.C. Rupees Forty Two and Paisa Two
Providing upto floor two level precast cement concrete jali or grill
1:2:4 mix (1- Cement : 2- coarse sand : 4-graded stone aggregate
Rupees Seven Hundred Seventy
96 05019A 5.6.2 6mm nominal size) reinforced with 1.6 mm dia. Mild steel wire Sqm 767.83
Five and Paisa Fifty One Only
including roughening,cleaning, fixing and finishing in cement
mortar 1:3 and curing complete. (A) 50mm thick
Providing upto floor two level precast cement concrete jali or grill
1:2:4 mix (1- Cement : 2- coarse sand : 4-graded stone aggregate
Rupees Seven Hundred Five and
97 05019B 5.6.2 6mm nominal size) reinforced with 1.6 mm dia. Mild steel wire Sqm 698.49
Paisa Forty Seven Only
including roughening,cleaning, fixing and finishing in cement
mortar 1:3 and curing complete. (B) 40mm thick
Providing upto floor two level precast cement concrete jali or grill
1:2:4 mix (1- Cement : 2- coarse sand : 4-graded stone aggregate
Rupees Seven Hundred Twenty
98 05019C 5.6.2 6mm nominal size) reinforced with 1.6 mm dia. Mild steel wire Sqm 717.09
Four and Paisa Twenty Six Only
including roughening,cleaning, fixing and finishing in cement
mortar 1:3 and curing complete. (C) 25mm thick
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing upto floor two level precast cement concrete jali or grill
1:2:4 mix (1- Cement : 2- coarse sand : 4-graded stone aggregate
Rupees Eight Hundred Four and
99 05019D 5.6.2 6mm nominal size) reinforced with 1.6 mm dia. Mild steel wire Sqm 796.58
Paisa Fifty Five Only
including roughening,cleaning, fixing and finishing in cement
mortar 1:3 and curing complete. (D) 75mm thick
Providing upto floor two level precast cement concrete jali or grill
1:2:4 mix (1- Cement : 2- coarse sand : 4-graded stone aggregate
Rupees Eight Hundred Thirty
100 05019E 5.6.2 6mm nominal size) reinforced with 1.6 mm dia. Mild steel wire Sqm 827.02
Five and Paisa Twenty Nine Only
including roughening,cleaning, fixing and finishing in cement
mortar 1:3 and curing complete.(E) 100mm thick
Extra for additional lift for providing and fixing in position Rupees Ten and Paisa Twenty
precast R.C.C. units above floor two level Eight Only
Providing and laying damp proof course 25mm thick cement
Rupees Three Hundred Four and
102 05021A 5.7.1 concrete 1:2:4 (1-Cement : 2 coarse sand : 4 stone aggregate 10 Sqm 301.51
Paisa Fifty Three Only
mm nominal size) and curing complete
Extra for providing and mixing water proofing material in Litres or Kg
Rupees Forty Nine and Paisa
103 5022 5.7.5 Cement concrete in mix proportion recommended by the per Quintal 48.67
manufacturers. of Cement
Providing and laying controlled cement concrete M.150 for curing
Rupees Three Thousand Eight
complete excluding cost of formwork and reinforcement for
104 05023AA 5.8.1 cu.m 3825.87 3864.13 Hundred Sixty Four and Paisa
reinforced concrete work in (A) Foundations, footings,Base of
columns and Mass concrete
Providing and laying controlled cement concrete M.150 for curing
Rupees Four Thousand One
complete excluding cost of formwork and reinforcement for
105 05023BA 5.8.1 cu.m 4115.11 4156.26 Hundred Fifty Six and Paisa
reinforced concrete work in (B) Walls, from top of foundation level
Twenty Six Only
upto floor two level
Providing and laying controlled cement concrete M.150 for curing
Rupees Four Thousand One
complete excluding cost of formwork and reinforcement for
106 05023CA 5.8.1 cu.m 4090.7 4131.61 Hundred Thirty One and Paisa
reinforced concrete work in (C) Slabs, landing, shelves, Balconies,
Lintels, Beams, Girders and Cantilever upto floor two level
Providing and laying controlled cement concrete M.150 for curing
Rupees Four Thousand Two
complete excluding cost of formwork and reinforcement for
107 05023DA 5.8.1 cu.m 4190.99 4232.90 Hundred Thirty Two and Paisa
reinforced concrete work in (D) Columns, Pillars posts and struts
upto floor two level.
Providing and laying controlled cement concrete M.150 for curing
Rupees Five Thousand One
complete excluding cost of formwork and reinforcement for
108 05023EA 5.8.1 cu.m 5120.39 5171.59 Hundred Seventy One and Paisa
reinforced concrete work in (E) Staircases excluding landing upto
Fifty Nine Only
floor two level
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying controlled cement concrete M.150 for curing
Rupees Four Thousand Five
complete excluding cost of formwork and reinforcement for
109 05023KA 5.8.1 cu.m 4480.18 4524.98 Hundred Twenty Four and Paisa
reinforced concrete work in (K) Vertical and Horizontial its upto
Ninety Eight Only
floor two level.
Providing and laying controlled cement concrete M.200 and curing
complete excluding the cost of formwork and reinforcement for Rupees Three Thousand Nine
110 05024AA 5.8.2 reinforced concrete work in (A) Foundations, footings, Base of cu.m 3903.19 3942.22 Hundred Forty Two and Paisa
columns and Mass Twenty Two Only
Providing and laying controlled cement concrete M.200 and curing
Rupees Four Thousand Four
complete excluding the cost of formwork and reinforcement for
111 05024BA 5.8.2 cu.m 4441.1 4485.51 Hundred Eighty Five and Paisa
reinforced concrete work in (B) Walls, from top of foundation
level upto floor two level
Providing and laying controlled cement concrete M.200 and curing
Rupees Four Thousand Four
complete excluding the cost of formwork and reinforcement for
112 05024CA 5.8.2 cu.m 4416.69 4460.86 Hundred Sixty and Paisa Eighty
reinforced concrete work in (C) Slabs,landing,shelves,Balconies
Lintels, Beams, Girders and Cantilever upto floor two level.
Providing and laying controlled cement concrete M.200 and curing
Rupees Four Thousand Five
complete excluding the cost of formwork and reinforcement for
113 05024DA 5.8.2 cu.m 4516.98 4562.15 Hundred Sixty Two and Paisa
reinforced concrete work in (D) Columns, Pillars posts and struts
upto floor two level.
Providing and laying controlled cement concrete M.200 and curing
Rupees Five Thousand Four
complete excluding the cost of formwork and reinforcement for
114 05024EA 5.8.2 cu.m 5399.21 5453.20 Hundred Fifty Three and Paisa
reinforced concrete work in (E) Staircases excluding landing upto
floor two level
Providing and laying controlled cement concrete M.200 and curing
Rupees Four Thousand Seven
complete excluding the cost of formwork and reinforcement for
115 05024KA 5.8.2 cu.m 4664.32 4710.96 Hundred Ten and Paisa Ninety
reinforced concrete work in (K) Vertical and Horizontial its upto
floor two level.
Providing and laying controlled cement concrete M.250 and curing
complete excluding the cost of formwork and reinforcement for Rupees Four Thousand Two
116 05025AA 5.8.3 reinforced concrete work in (A) Foundations, footings, Base of cu.m 4205.51 4247.57 Hundred Forty Seven and Paisa
columns and Mass Fifty Seven Only
Providing and laying controlled cement concrete M.250 and curing
Rupees Four Thousand Five
complete excluding the cost of formwork and reinforcement for
117 05025BA 5.8.3 cu.m 4506.45 4551.51 Hundred Fifty One and Paisa
reinforced concrete work in (B) Walls, from top of foundation
level upto floor two level
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying controlled cement concrete M.250 and curing
Rupees Four Thousand Five
complete excluding the cost of formwork and reinforcement for
118 05025CA 5.8.3 cu.m 4482.05 4526.87 Hundred Twenty Six and Paisa
reinforced concrete work in (C) Slabs,landing,shelves,Balconies,
Eighty Seven Only
Lintels, Beams, Girders and Cantilever upto floor two level.
Providing and laying controlled cement concrete M.250 and curing
Rupees Four Thousand Six
complete excluding the cost of formwork and reinforcement for
119 05025DA 5.8.3 cu.m 4582.32 4628.14 Hundred Twenty Eight and Paisa
reinforced concrete work in (D) Columns, Pillars posts and struts,
upto floor two level.
Providing and Laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) and Rupees Eight Thousand Three
120 05026A 0 finishing smooth with curing etc. complete including the cost of cu.m 8272.32 8355.04 Hundred Fifty Five and Paisa
formwork but excluding the cost of reinforsement for R.C.C work in Four Only
(i) Slabs upto 8cm thickness
Providing and Laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) and Rupees Seven Thousand Four
121 05026B 0 finishing smooth with curing etc. complete including the cost of cu.m 7401.59 7475.61 Hundred Seventy Five and Paisa
formwork but excluding the cost of reinforsement for R.C.C work in Sixty One Only
(ii) Slabs having more than 8 cm and upto 10 cm.thickness
Providing and Laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) and Rupees Six Thousand Eight
122 05026C 0 finishing smooth with curing etc. complete including the cost of cu.m 6819.95 6888.15 Hundred Eighty Eight and Paisa
formwork but excluding the cost of reinforsement for R.C.C work in Fifteen Only
(iii) Slabs having more than 10 cm and upto 13 cm. thickness
Providing and Laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) and Rupees Six Thousand Three
123 05026D 0 finishing smooth with curing etc. complete including the cost of cu.m 6241.78 6304.20 Hundred Four and Paisa Twenty
formwork but excluding the cost of reinforsement for R.C.C work in Only
(iv) Slabs having more than 13 cm and upto 15 cm.thickness
Providing and Laying controlled cement concrete M.150 and
Rupees Eight Thousand Four
finishing smooth with curing etc. complete including the cost of
124 05027A 0 cu.m 8379.89 8463.69 Hundred Sixty Three and Paisa
formwork but excluding the cost of reinforsement for R.C.C work in
Sixty Nine Only
(i) Slabs upto 8cm thickness
Providing and Laying controlled cement concrete M.150 and
Rupees Seven Thousand Five
finishing smooth with curing etc. complete including the cost of
125 05027B 0 cu.m 7509.16 7584.25 Hundred Eighty Four and Paisa
formwork but excluding the cost of reinforsement for R.C.C work in
Twenty Five Only
(ii) Slabs having more than 8 cm and upto 10 cm.thickness
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and Laying controlled cement concrete M.150 and
Rupees Six Thousand Seven
finishing smooth with curing etc. complete including the cost of
126 05027C 0 cu.m 6704.61 6771.66 Hundred Seventy One and Paisa
formwork but excluding the cost of reinforsement for R.C.C work in
(iii) Slabs having more than 10 cm and upto 13 cm. thickness
Providing and Laying controlled cement concrete M.150 and
Rupees Six Thousand Four
finishing smooth with curing etc. complete including the cost of
127 05027D 0 cu.m 6349.35 6412.84 Hundred Twelve and Paisa
formwork but excluding the cost of reinforsement for R.C.C work in
Eighty Four Only
(iv) Slabs having more than 13 cm and upto 15 cm.thickness
Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size)
Rupees Nine Thousand Five
exposed work with curing etc. complete including the cost of
128 05028A 0 cu.m 9447.57 9542.05 Hundred Forty Two and Paisa
formwork but excluding the cost of reinforsement for R.C.C work
in (i) Slabs upto 8cm
Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) Rupees Eight Thousand Four
129 05028B 0 exposed work with curing etc. complete including the cost of cu.m 8341.79 8425.21 Hundred Twenty Five and Paisa
formwork but excluding the cost of reinforsement for R.C.C work Twenty One Only
in (ii) Slabs having more than 8 cm and upto 10 cm.thickness
Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) Rupees Seven Thousand Four
130 05028C 0 exposed work with curing etc. complete including the cost of cu.m 7380.23 7454.03 Hundred Fifty Four and Paisa
formwork but excluding the cost of reinforsement for R.C.C work Three Only
in (iii) Slabs having more than 10 cm and upto 13 cm. thickness
Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) Rupees Six Thousand Nine
131 05028D 0 exposed work with curing etc. complete including the cost of cu.m 6868.9 6937.59 Hundred Thirty Seven and Paisa
formwork but excluding the cost of reinforsement for R.C.C work Fifty Nine Only
in (iv) Slabs having more than 13 cm and upto 15 cm.thickness
Providing and laying controlled cement concrete M.150 and
Rupees Nine Thousand Six
exposed work with curing etc. complete including the cost of
132 05029A 0 cu.m 9555.14 9650.69 Hundred Fifty and Paisa Sixty
formwork but excluding the cost of reinforsement for
R.C.C work in (i) Slabs upto 8cm thickness
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying controlled cement concrete M.150 and
exposed work with curing etc. complete including the cost of Rupees Eight Thousand Five
133 05029B 0 formwork but excluding the cost of reinforsement for R.C.Cwork cu.m 8449.36 8533.85 Hundred Thirty Three and Paisa
in (ii) Slabs having more than 8 cm and upto 10 Eighty Five Only
Providing and laying controlled cement concrete M.150 and
exposed work with curing etc. complete including the cost of Rupees Seven Thousand Five
134 05029C 0 formwork but excluding the cost of reinforsement for R.C.Cwork cu.m 7427.62 7501.90 Hundred One and Paisa Ninety
in (iii) Slabs having more than 10 cm and upto 13 Only
Providing and laying controlled cement concrete M.150 and
exposed work with curing etc. complete including the cost of
Rupees Seven Thousand Forty
135 05029D 0 formwork but excluding the cost of reinforsement for R.C.Cwork cu.m 6976.47
Six and Paisa Twenty Three Only
in (iv) Slabs having more than 13 cm and upto
Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) for Rupees Ten Thousand Two
136 5030 0 R.C.C lintel including finishing smooth with,curing etc. complete cu.m 10118.21 10219.39 Hundred Nineteen and Paisa
including the cost of formwork but excluding the cost of Thirty Nine Only
Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) and Rupees Eight Thousand Five
137 05031A1 0 finishing smooth with,curing etc. complete including the cost of cu.m 8508.71 8593.80 Hundred Ninety Three and Paisa
formwork but excluding the cost of reinforcement for R.C.C work Eighty Only
in (A) BEAMS :(i) Having cross-sectional area 0.05 to 0.08 Sq.M
Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) and
finishing smooth with,curing etc. complete including the cost of Rupees Seven Thousand Six
138 05031A2 0 formwork but excluding the cost of reinforcement for R.C.C work cu.m 7589.7 7665.60 Hundred Sixty Five and Paisa
in (A) BEAMS :(ii) Having cross-sectional area more than Sixty Only
0.08Sq.M and upto
Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) and
finishing smooth with,curing etc. complete including the cost of Rupees Six Thousand Five
139 05031A3 0 formwork but excluding the cost of reinforcement for R.C.C work cu.m 6512.94 6578.07 Hundred Seventy Eight and Paisa
in (A) BEAMS :(iii) Having cross-sectional area more than Seven Only
0.12Sq.M and upto
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) and
Rupees Twelve Thousand Sixty
140 05031B1 0 finishing smooth with,curing etc. complete including the cost of cu.m 11950.37
Nine and Paisa Eighty Seven Only
formwork but excluding the cost of reinforcement for R.C.C work
in (B) COLUMNS: (i) Having cross-sectional area 0.05 to 0.08 Sq.M
Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) and
finishing smooth with,curing etc. complete including the cost of Rupees Ten Thousand Six
141 05031B2 0 formwork but excluding the cost of reinforcement for R.C.C work cu.m 10552.63 10658.16 Hundred Fifty Eight and Paisa
in (B) COLUMNS: (ii) Having cross-sectional area more than 0.08 Sixteen Only
Providing and laying ordinary cement concrete 1:2:4 (1- Cement 2-
coarse sand : 4- graded stone aggregates 20 mm nominal size) and
finishing smooth with,curing etc. complete including the cost of Rupees Eight Thousand Six
142 05031B3 0 formwork but excluding the cost of reinforcement for R.C.C work cu.m 8606.8 8692.87 Hundred Ninety Two and Paisa
in (B) COLUMNS: (iii) Having cross-sectional area more than Eighty Seven Only
0.12Sq.M and upto
Providing and laying ordinary cement concrete M.150exposed
work with curing etc. complete including the cost of formwork but Rupees Ten Thousand Four
143 05032A1 0 excluding the cost of reinforcement for R.C.C. work in (A) BEAMS cu.m 10339.66 10443.06 Hundred Forty Three and Paisa
:(i) Having Six Only
cross-sectional area 0.05 to 0.08 Sq.M
Providing and laying controlled cement concrete M.150exposed
work with curing etc. complete including the cost of formwork but Rupees Nine Thousand One
144 05032A2 0 excluding the cost of reinforcement for R.C.C. work in (A) BEAMS cu.m 9075.6 9166.36 Hundred Sixty Six and Paisa
:(ii) Having cross-sectional area more than 0.08Sq.M and upto 0.12 Thirty Six Only
Providing and laying controlled cement concrete M.150exposed
work with curing etc. complete including the cost of formwork but
Rupees Seven Thousand Six
excluding the cost of reinforcement for R.C.C. work in (A) BEAMS
145 05032A3 0 cu.m 7594.55 7670.50 Hundred Seventy and Paisa Fifty
:(iii) Having cross-sectional area more than 0.12Sq.M and upto
Providing and laying controlled cement concrete M.150exposed
Rupees Thirteen Thousand Six
work with curing etc. complete including the cost of formwork but
146 05032B1 0 cu.m 13546.91 13682.38 Hundred Eighty Two and Paisa
excluding the cost of reinforcement for R.C.C. work in (B)
Thirty Eight Only
COLUMNS:(i) Having cross-sectional area 0.05 to 0.08 Sq.M
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying controlled cement concrete M.150exposed
work with curing etc. complete including the cost of formwork but
Rupees Twelve Thousand One
excluding the cost of reinforcement for R.C.C. work in(B)
147 05032B2 0 cu.m 12060.3 12180.90 Hundred Eighty and Paisa
COLUMNS:(ii) Having cross-sectional area more than 0.08 Sq.M
Providing and laying controlled cement concrete M.150exposed
work with curing etc. complete including the cost of formwork but
Rupees Nine Thousand Eight
excluding the cost of reinforcement for R.C.C. work in(B)
148 05032B3 0 cu.m 9786.24 9884.10 Hundred Eighty Four and Paisa
COLUMNS:(iii) Having cross-sectional area more than 0.12Sq.M
Providing and laying controlled cement concrete M.200 exposed
work with curing etc. complete including the cost of formwork but Rupees Ten Thousand Seven
149 05033A1 0 excluding the cost of reinforcement for cu.m 10656.09 10762.65 Hundred Sixty Two and Paisa
R.C.C. work in(A) BEAMS :(i) Having cross-sectional area Sixty Five Only
Providing and laying controlled cement concrete M.200 exposed
work with curing etc. complete including the cost of formwork but Rupees Nine Thousand Four
150 05033A2 0 excluding the cost of reinforcement for cu.m 9392.03 9485.95 Hundred Eighty Five and Paisa
R.C.C. work in (A) BEAMS :(ii) Having cross-sectional area more Ninety Five Only
than 0.08Sq.M and upto 0.12 Sq.M
Providing and laying controlled cement concrete M.200 exposed
work with curing etc. complete including the cost of formwork but Rupees Seven Thousand Nine
151 05033A3 0 excluding the cost of reinforcement for cu.m 7910.98 7990.09 Hundred Ninety and Paisa Nine
R.C.C. work in (A) BEAMS :(iii) Having cross-sectional area more Only
than 0.12Sq.M and upto 0.18 Sq.M
Providing and laying controlled cement concrete M.200 exposed
work with curing etc. complete including the cost of formwork but Rupees Fourteen Thousand
152 05033B1 0 excluding the cost of reinforcement for cu.m 14169.29 14310.98 Three Hundred Ten and Paisa
R.C.C. work in (B) COLUMNS:(i) Having cross-sectional area Ninety Eight Only
Providing and laying controlled cement concrete M.200 exposed
work with curing etc. complete including the cost of formwork but Rupees Twelve Thousand Five
153 05033B2 0 excluding the cost of reinforcement for cu.m 12452.8 12577.33 Hundred Seventy Seven and
R.C.C. work in (B) COLUMNS:(ii) Having cross-sectional area more Paisa Thirty Three Only
than 0.08 Sq.M and upto 0.18 Sq.M
Providing and laying controlled cement concrete M.200 exposed
work with curing etc. complete including the cost of formwork but Rupees Ten Thousand Two
154 05033B3 0 excluding the cost of reinforcement for cu.m 10102.67 10203.70 Hundred Three and Paisa
R.C.C. work in (B) COLUMNS:(iii) Having cross-sectional area more Seventy Only
than 0.12Sq.M and upto 0.18 Sq.M
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying controlled cement concrete M.250 exposed
work with curing etc. complete including the cost of formwork but Rupees Ten Thousand Eight
155 05034A1 0 excluding the cost of reinforcement for cu.m 10717.09 10824.26 Hundred Twenty Four and Paisa
R.C.C. work in (A) BEAMS :(i) Having cross-sectional area Twenty Six Only
Providing and laying controlled cement concrete M.250 exposed
work with curing etc. complete including the cost of formwork but Rupees Nine Thousand Five
156 05034A2 0 excluding the cost of reinforcement for cu.m 9453.03 9547.56 Hundred Forty Seven and Paisa
R.C.C. work in (A) BEAMS :(ii) Having cross-sectional area more Fifty Six Only
than 0.08Sq.M and upto 0.12 Sq.M
Providing and laying controlled cement concrete M.250 exposed
work with curing etc. complete including the cost of formwork but
Rupees Eight Thousand Fifty One
157 05034A3 0 excluding the cost of reinforcement for cu.m 7971.98
and Paisa Seventy Only
R.C.C. work in (A) BEAMS :(iii) Having cross-sectional area more
than 0.12Sq.M and upto 0.18 Sq.M
Providing and laying controlled cement concrete M.250 exposed
work with curing etc. complete including the cost of formwork but Rupees Fourteen Thousand Five
158 05034B1 0 excluding the cost of reinforcement for cu.m 14450.04 14594.54 Hundred Ninety Four and Paisa
R.C.C. work in (B) COLUMNS:(i) Having cross-sectional area Fifty Four Only
Providing and laying controlled cement concrete M.250 exposed
work with curing etc. complete including the cost of formwork but Rupees Twelve Thousand Six
159 05034B2 0 excluding the cost of reinforcement for cu.m 12513.8 12638.94 Hundred Thirty Eight and Paisa
R.C.C. work in (B) COLUMNS:(ii) Having cross-sectional area more Ninety Four Only
than 0.08 Sq.M and upto 0.18 Sq.M
Providing and laying controlled cement concrete M.250 exposed
work with curing etc. complete including the cost of formwork but Rupees Ten Thousand Two
160 05034B3 0 excluding the cost of reinforcement for cu.m 10163.67 10265.31 Hundred Sixty Five and Paisa
R.C.C. work in (B) COLUMNS: (iii) Having cross-sectional area more Thirty One Only
than 0.12Sq.M and upto 0.18 Sq.M
Providing and applying anticarrasive treatment with polymer
Rupees Four Thousand One
base materials to the steel rainfarcement including descaling the
161 5035 0 MT 4127.68 4168.96 Hundred Sixty Eight and Paisa
dust and applying the preventive coating of approved make (for
Ninety Six Only
the R.C.C. structures near coastal area only) etc complete.
Providing and fixing in expansion joint 100 mm thick expansion
Rupees Two Thousand Nine
joint board of best quality and approved make including cutting to
162 5047 0 Sqm 2952.53 2982.06 Hundred Eighty Two and Paisa
required size and shape at all levels etc.
complete as directed.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying and fixing 50 mm thick expansion joint by
Rupees One Thousand Four
hydro cell semi rigid UV resistance with high performance
163 5048 0 Sqm 1476.27 1491.03 Hundred Ninety One and Paisa
laminated closed cell polythene foam joint filler in sheet foam as
directed, etc. complete.
Providing and laying and fixing 25 mm thick expansion joint by
hydro cell semi rigid UV resistance with high performance Rupees Seven Hundred Forty
laminated closed cell polythene foam joint filler in sheet foam as Five and Paisa Fifty One Only
directed, etc. complete.
Applying and providing Expansion joint sealing System on 100 mm
vide joint including cleaning of exansion joint by mechanical
means provision of adhesive and flexible membrane with required Rupees Four Thousand Seven
165 5050 0 bond length as per menufracturer specification and 4mm thick Sqm 4724.75 4772.00 Hundred Seventy Two and Zero
alluminium strip covering with one side sloted and bolted with Paisa Only
suitable system, inclusive of all manpower, machinery and
material as per specification and as directed.
Providing and filling the expansion joint by polymer confirm to BS
4254-1983 as per required shade and specifi- cation by making
groove of 50 mm x 12.5 mm lather by cutting or by repairing Rupees Five Hundred Fifteen and
groove and removing mortar drop or any other foreign materials Paisa Thirty Nine Only
including applying primer and
filling required size (oversize of joint PU foam etc. complete.
Providing and filling the expansion joint by polymer confirm to BS
4254-1983 as per required shade and manufactured specifi-cation
by making groove of 25 mm x
Rupees Two Hundred Seventy
167 5052 0 12.5 mm lather by cutting or by repairing groove and removing Sqm 270.97
Three and Paisa Sixty Eight Only
mortar drop or any other foreign materials including applying
primer and filling required size (oversize of joint PU foam etc.
Providing and fixing 25 cm Wide & 3mm thick exterior composite
panel on existing expansion joint horizontally & vertically with all Rupees One Thousand Fifty Four
material, hardware, acessories & fittings and Paisa Thirty Four Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying in position Ready Mixed M-150 grade
concrete for reinforced cement conctere work , using cement
content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit
mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
Rupees Three Thousand Seven
cement concrete work including pumping of R.M.C. from transit
169 5054 0 cu.m 3744.67 3782.12 Hundred Eighty Two and Paisa
mixer to site of laying, excluding the cost of centering shuttering
finishing and reinforcement including cost of admixtures in
recommended proportions as per IS: 9103 to accelerate/ retard
setting of concrete, improve workability without impairing
strength and durability as per direction of the Engineer - in -
charge. Without Fly Ash (Min cement level as per latest IS 456 shall
Providing and laying in position Ready Mixed M-200 grade
concrete for reinforced cement conctere work , using cement
content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit
mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
Rupees Four Thousand Eight
cement concrete work including pumping of R.M.C. from transit
170 5055 0 cu.m 4756.97 4804.54 Hundred Four and Paisa Fifty
mixer to site of laying, excluding the cost of centering shuttering
finishing and reinforcement including cost of admixtures in
recommended proportions as per IS: 9103 to accelerate/ retard
setting of concrete, improve workability without impairing
strength and durability as per direction of the Engineer - in -
charge. Without Fly Ash (Min cement level as per latest IS 456 shall
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying in position Ready Mixed M-250 grade
concrete for reinforced cement conctere work , using cement
content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit
mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
Rupees Four Thousand Eight
cement concrete work including pumping of R.M.C. from transit
171 5056 0 cu.m 4847.84 4896.32 Hundred Ninety Six and Paisa
mixer to site of laying, excluding the cost of centering shuttering
Thirty Two Only
finishing and reinforcement including cost of admixtures in
recommended proportions as per IS: 9103 to accelerate/ retard
setting of concrete, improve workability without impairing
strength and durability as per direction of the Engineer - in -
charge. Without Fly Ash (Min cement level as per latest IS 456 shall
be maintained) (Cement level 450 kg )
Providing and laying in position Ready Mixed M-300 grade
concrete for reinforced cement conctere work , using cement
content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit
mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of R.M.C. from transit Rupees Five Thousand Ninety
mixer to site of laying, excluding the cost of centering shuttering Three and Paisa Twelve Only
finishing and reinforcement including cost of admixtures in
recommended proportions as per IS: 9103 to accelerate/ retard
setting of concrete, improve workability without impairing
strength and durability as per direction of the Engineer - in -
charge. Without Fly Ash (Min cement level as per latest IS 456 shall
be maintained) (Cement level 475 kg )
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying in position Ready Mixed M-350 grade
concrete for reinforced cement conctere work , using cement
content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit
mixer for a lead up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for reinforced
cement concrete work including pumping of R.M.C. from transit Rupees Five Thousand One
173 5058 0 mixer to site of laying, excluding the cost of centering shuttering cu.m 5142.4 5193.82 Hundred Ninety Three and Paisa
finishing and reinforcement including cost of admixtures in Eighty Two Only
recommended proportions as per IS: 9103 to accelerate/ retard
setting of concrete, improve workability without impairing
strength and durability as per direction of the Engineer - in -
charge. Without Fly Ash(Min cement level as per latest IS 456 shall
be maintained) (Cement level 500 kg
Providing and applying anti carbonation, anti fading, mold
resistant, heat insulating, and 100% acrylic breathable decorative
external waterproof coating of approved shade having Viscosity @
Room Temperature by Ford cup No. B-4 (dilute 2 parts of product
Rupees One Hundred Eighteen
174 5059 0 with I part of water) 18 to 30 sec. pH of 7.00 to 10.00 and Sp. Sqm 117.03
and Paisa Twenty Only
Gravity @ Room Temperature 1.30+0.1, tested for carbon dioxide
diffusion resistance properties for coating materials and coating
systems for exterior masonry and concrete as per DIN EN 1062-6
(2002- 2010) by a NBA Grade "A" accredited institution.
Providing and fixing premoulded compressible filler board in black
colour confirming to MoRT&H Specifications (Clause 1015), having
minimum density 95kg/cum, non- staining with less than 1% Rupees Five Hundred Ninety
water absorption & compression recovery of 93% minimum as per Two and Paisa Fourteen Only
specification for 12 mm wide expansion joint including cutting to
required size and shape at all levels etc.complete as directed.
Providing and fixing premoulded compressible filler board in
black colour confirming to MoRT&H Specifications (Clause 1015),
having minimum density 95kg/cum. non- staining with less than Rupees Eight Hundred Three and
1% water absorption & compression recovery of 93% minimum as Paisa Twenty Two Only
per specification for 20 mm wide expansion joint including cutting
to required size and shape at all levels etc.complete as directed.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing premoulded compressible filler board in
black colour confirming to MoRT&H Specifications (Clause 1015),
Rupees One Thousand Three
having minimum density 95kg/cum. non- staining with less than
177 5062 0 Sqm 1317.74 1330.92 Hundred Thirty and Paisa
1% water absorption & compression recovery of 93% minimum as
Ninety Two Only
per specification for 40 mm wide expansion joint including cutting
to required size and shape at all levels etc.complete as directed.
Providing and applying the elastomeric joint sealant two
component, high performance polysulfide formulation conforming
to BS:4254 and ASTM C 920 having weathering resistance to ultra-
Rupees One Hundred Seventy
178 5063 0 violet rays and shall exhibit shore A hardness of 25 and have Rmt 176.93
Eight and Paisa Seventy Only
movement accommodation factor 25% including using of
compatible primer of approved standard etc. complete. for 12 mm
Providing and applying the elastomeric joint sealant two
component, high performance polysulfide formulation conforming
to BS:4254 and ASTM C 920 having weathering resistance to ultra-
Rupees Two Hundred Fifty Eight
179 5064 0 violet rays and shall exhibit shore A hardness of 25 and have Rmt 255.52
and Paisa Eight Only
movement accommodation factor 25% including using of
compatible primer of approved standard etc. complete. For 20 mm
Providing and laying controlled cement concrete M250 work with Rupees Six Thousand Three
180 Rate Analysis 0 curing etc. complete including the cost of from workbut excluding Cum 6272.63 6335.36 Hundred Thirty Five and Paisa
cost of Reinforcement for RCC work in column Thirty Six Only
Providing and laying controlled cement concrete M250 work with Rupees Six Thousand Two
181 Rate Analysis 0 curing etc. complete including the cost of from work but excluding Cum 6191.54 6253.46 Hundred Fifty Three and Paisa
cost of Reinforcement for RCC work in Beam. .GB/PB Forty Six Only
Providing and laying controlled cement concrete M200 work with Rupees Seven Thousand Four
182 Rate Analysis 0 curing etc. complete including the cost of from workbut excluding Cum 7394.2 7468.14 Hundred Sixty Eight and Paisa
cost of Reinforcement for RCC work in Column (G.F.) Fourteen Only
Providing and laying controlled cement concrete M200 work with Rupees Seven Thousand Three
183 Rate Analysis 0 curing etc. complete including the cost of from workbut excluding Cum 7284.1 7356.94 Hundred Fifty Six and Paisa
cost of Reinforcement for RCC work in LINTEL & BEAM (G.F.) Ninety Four Only
Providing and laying controlled cement concrete M200 work with Rupees Six Thousand Seven
184 Rate Analysis 0 curing etc. complete including the cost of from workbut excluding Cum 6661.18 6727.79 Hundred Twenty Seven and
cost of Reinforcement for RCC work in SLAB (G.F.) Paisa Seventy Nine Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying controlled cement concrete M200 work with
Rupees Six Thousand Forty Eight
185 Rate Analysis 0 curing etc. complete including the cost of from workbut excluding Cum 5988.80
and Paisa Sixty Nine Only
cost of Reinforcement for RCC work in CHAJJA, (G.F.)
Providing and laying trimix vaccum dewatering process controlled
cement concrete M-200 and curing complete excluding the cost of
Rupees Six Thousand Four
form work including using vaccum dewatering machine
186 Rate Analysis 0 Cum 6,336.95 6400.32 Hundred and Paisa Thirty Two
mechanical vibrator, mechanical floater & mechanical trowel for
finishing by mixer machine as directed including cutting groove &
filling joint as specialized etc. comp.
Brick work using common burnt clay building bricks having
Rupees Four Thousand Four
crushing strength not less than 35 kg./Sq.Cm. in foundation and
187 06001AA 6.12 cu.m 4453.65 4498.19 Hundred Ninety Eight and Paisa
plinth in Cement Mortar 1:5. (1- Cement : 5 -fine
sand)(A) Modular
Brick work using common burnt clay building bricks having
Rupees Four Thousand One
crushing strength not less than 35 kg./Sq.Cm. in foundation and
188 06001BA 6.12 cu.m 4111.95 4153.07 Hundred Fifty Three and Paisa
plinth in Cement Mortar 1:5. (1- Cement : 5 -fine sand)(B)
Brick work using common burnt clay building bricks having
crushing strength not less than 35 kg./Sq.Cm. in foundation and Rupees Five Thousand One and
plinth in Cement Mortar 1:5. (1- Cement : 5 -fine sand)(C) Fly Ash Paisa Fifty Only
Brick work using common burnt clay building bricks having
Rupees Four Thousand Three
crushing strength not less than 35 kg./Sq.Cm. in foundation and
190 06002AA 6.13 cu.m 4347.74 4391.22 Hundred Ninety One and Paisa
plinth in Cement Mortar 1:6 (1- Cement : 6 -fine
Twenty Two Only
sand)(A) Modular
Brick work using common burnt clay building bricks having
Rupees Four Thousand One
crushing strength not less than 35 kg./Sq.Cm. in foundation and
191 06002BA 6.13 cu.m 4080.74 4121.55 Hundred Twenty One and Paisa
plinth in Cement Mortar 1:6 (1- Cement : 6 -fine sand)(B)
Fifty Five Only
Brick work using common burnt clay building bricks having
Rupees Four Thousand Eight
crushing strength not less than 35 kg./Sq.Cm. in foundation and
192 06002CA 6.13 cu.m 4843.74 4892.18 Hundred Ninety Two and Paisa
plinth in Cement Mortar 1:6 (1- Cement : 6 -fine sand)(C) Fly Ash
Brick work using common burnt clay building bricks having
Rupees Four Thousand Two
crushing strength not less than 35 kg./Sq.Cm. in foundation and
193 06003AA 0 cu.m 4237.89 4280.27 Hundred Eighty and Paisa
plinth in Cement Mortar 1:8 (1- Cement : 8 -fine
Twenty Seven Only
sand)(A) Modular
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Brick work using common burnt clay building bricks having
Rupees Three Thousand Nine
crushing strength not less than 35 kg./Sq.Cm. in foundation and
194 06003BA 0 cu.m 3955.2 3994.75 Hundred Ninety Four and Paisa
plinth in Cement Mortar 1:8 (1- Cement : 8 -fine sand)(B)
Seventy Five Only
Brick work using common burnt clay building bricks having
Rupees Four Thousand Seven
crushing strength not less than 35 kg./Sq.Cm. in foundation and
195 06003CA 0 cu.m 4747.34 4794.81 Hundred Ninety Four and Paisa
plinth in Cement Mortar 1:8 (1- Cement : 8 -fine sand)(C) Fly Ash
Eighty One Only
Brick work using common burnt clay building bricks having
Rupees Four Thousand Two
crushing strength not less than 35 kg./Sq.Cm. in foundation and
196 06004AA 0 cu.m 4247.57 4290.05 Hundred Ninety and Paisa Five
plinth in Lime Mortar 1:1.5 (1- Lime putty :1.5 -fine
sand)(A) Modular
Brick work using common burnt clay building bricks having
crushing strength not less than 35 kg./Sq.Cm. in foundation and Rupees Four Thousand Five and
plinth in Lime Mortar 1:1.5 (1- Lime putty :1.5 -fine Paisa Ninety Two Only
sand)(B) Conventional
Brick work using common burnt clay building bricks having
Rupees Four Thousand Seven
crushing strength not less than 35 kg./Sq.Cm. in foundation and
198 06004CA 0 cu.m 4718.59 4765.78 Hundred Sixty Five and Paisa
plinth in Lime Mortar 1:1.5 (1- Lime putty :1.5 -fine
Seventy Eight Only
sand)(C) Fly Ash Bricks
Brick work using common burnt clay building bricks having
Rupees Four Thousand Two
crushing strength not less than 35 kg./Sq.Cm. in foundation and
199 06005AA 0 cu.m 4228.09 4270.37 Hundred Seventy and Paisa
plinth in Lime Mortar 1: 2 (1- Lime putty : 2 -fine
Thirty Seven Only
sand)(A) Modular
Brick work using common burnt clay building bricks having
Rupees Three Thousand Nine
crushing strength not less than 35 kg./Sq.Cm. in foundation and
200 06005BA 0 cu.m 3944.01 3983.45 Hundred Eighty Three and Paisa
plinth in Lime Mortar 1: 2 (1- Lime putty : 2 -fine
Forty Five Only
sand)(B) Conventional
Brick work using common burnt clay building bricks having
Rupees Four Thousand Seven
crushing strength not less than 35 kg./Sq.Cm. in foundation and
201 06005CA 0 cu.m 4676.31 4723.07 Hundred Twenty Three and
plinth in Lime Mortar 1: 2 (1- Lime putty : 2 -fine
Paisa Seven Only
sand)(C) Fly Ash Bricks
Extra for brick work in superstructure above plinth level Rupees Two Hundred Sixty
upto floor two level (A) Modular Three and Paisa Five Only
Extra for brick work in superstructure above plinth level Rupees Two Hundred Seventy
upto floor two level (B) Conventional Five and Paisa One Only
Extra for brick work in superstructure above plinth level Rupees Two Hundred Seventy
upto floor two level(C) Fly Ash Bricks Five and Paisa One Only
Extra for brick work in superstructure above floor two level Rupees Forty Four and Paisa
Item No. 1(6.12) (A) Modular Seventeen Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Extra for brick work in superstructure above floor two level Rupees Forty One and Paisa Fifty
Item No. 1(6.12) (B) Conventional Only
Extra for brick work in superstructure above floor two level Rupees Fifty and Paisa Ninety
Item No. 1(6.12) (C) Fly Ash Bricks Nine Only
Extra for brick work in superstructure above floor two level Rupees Forty Three and Paisa
Item No. 2(6.13) (A) Modular Ninety One Only
Extra for brick work in superstructure above floor two level Rupees Forty One and Paisa
Item No. 2(6.13) (B) Conventional Nineteen Only
Extra for brick work in superstructure above floor two level Rupees Fifty and Paisa Sixty
Item No. 2(6.13) (C) Fly Ash Bricks Eight Only
Extra for brick work in superstructure above floor two level Rupees Forty Two and Paisa
Item No. 3 (A) Modular Seventy Seven Only
Extra for brick work in superstructure above floor two level Rupees Thirty Nine and Paisa
Item No. 3 (B) Conventional Ninety Two Only
Extra for brick work in superstructure above floor two level Rupees Forty Nine and Paisa
Item No. 3 (C) Fly Ash Bricks Forty Two Only
Extra for brick work in superstructure above floor two level Rupees Forty Two and Paisa
Item No. 4 (A) Modular Eighty Eight Only
Extra for brick work in superstructure above floor two level Rupees Forty and Paisa Four
Item No. 4 (B) Coventional Only
Extra for brick work in superstructure above floor two level Rupees Forty Nine and Paisa
Item No. 4 (C) Fly Ash Bricks Fifty Three Only
Extra for brick work in superstructure above floor two level Rupees Forty Two and Paisa
Item No. 5 (A) Modular Sixty Eight Only
(i) Half brick masonry in common brunt clay building bricks
having crushing strength not less than 35 Kg/Sq.Cm. in Cement Rupees Six Hundred Five and
mortar 1:4 (1- Cement : 4 -coarse sand ) in foundation and plinth Paisa Twenty Nine Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
(i) Half brick masonry in common brunt clay building bricks
having crushing strength not less than 35 Kg/Sq.Cm. in Cement Rupees Six Hundred Fourteen
mortar 1:4 (1- Cement : 4 -coarse sand ) in foundation and plinth and Paisa Eighty Four Only
(B) Conventional
(i) Half brick masonry in common brunt clay building bricks
having crushing strength not less than 35 Kg/Sq.Cm. in Cement Rupees Six Hundred Ninety One
mortar 1:4 (1- Cement : 4 -coarse sand ) in foundation and plinth and Paisa Eighty One Only
(C)Fly Ash Bricks
(ii) Half brick masonry in common brunt clay building bricks
having crushing strength not less than 35 Kg/Sq.Cm. in Cement Rupees Five Hundred Ninety
mortar 1:5 (1- Cement : 5 -coarse sand ) in foundation and plinth Five and Paisa Sixty Seven Only
(ii) Half brick masonry in common brunt clay building bricks
having crushing strength not less than 35 Kg/Sq.Cm. in Cement Rupees Six Hundred Four and
mortar 1:5 (1- Cement : 5 -coarse sand ) in foundation and plinth Paisa Six Only
(B) Conventional
(ii) Half brick masonry in common brunt clay building bricks
having crushing strength not less than 35 Kg/Sq.Cm. in Cement Rupees Six Hundred Seventy
mortar 1:5 (1- Cement : 5 -coarse sand ) in foundation and plinth Eight and Paisa Fourteen Only
(C)Fly Ash Bricks
(iii) Half brick masonry in common brunt clay building bricks
having crushing strength not less than 35 Kg/Sq.Cm. in Lime Rupees Five Hundred Eighty and
mortar 1:1.5 ( 1- Lime : 1.5 -coarse sand ) in foundation and plinth Paisa Thirty Four Only
(iii) Half brick masonry in common brunt clay building bricks
having crushing strength not less than 35 Kg/Sq.Cm. in Lime Rupees Five Hundred Eighty Six
mortar 1:1.5 ( 1- Lime : 1.5 -coarse sand ) in foundation and plinth and Paisa Eighty Nine Only
(B) Conventional
(iii) Half brick masonry in common brunt clay building bricks
having crushing strength not less than 35 Kg/Sq.Cm. in Lime Rupees Six Hundred Fifty and
mortar 1:1.5 ( 1- Lime : 1.5 -coarse sand ) in foundation and plinth Paisa Eighty One Only
(C)Fly Ash Bricks
Extra for brick work in superstructure above floor two level Rupees Forty One and Paisa Fifty
Item No. 5 (B) Coventional Only
Half brick masonry in common brunt clay building bricks having
crushing strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:3
( 1-Cement : 3-coarse sand ) with 2 Nos of 6mm Mild steel round Rupees Six Hundred Sixty Eight
bars after every three course embedded in Cement Mortar in and Paisa Nine Only
foundation and plinth (A)
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Half brick masonry in common brunt clay building bricks having
crushing strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:3
Rupees Six Hundred Seventy
( 1-Cement : 3-coarse sand ) with 2 Nos of 6mm Mild steel round
229 06009BA 6.31 Sqm 673.06 679.79 Nine and Paisa Seventy Nine
bars after every three course embedded in Cement Mortar in
foundation and plinth (B)
Half brick masonry in common brunt clay building bricks having
crushing strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:3
( 1-Cement : 3-coarse sand ) with 2 Nos of 6mm Mild steel round Rupees Seven Hundred Sixty One
bars after every three course embedded in Cement Mortar in and Paisa Eighty Four Only
foundation and plinth
(C)Fly Ash Bricks
Extra for brick work in superstructure above floor two level Rupees Forty Seven and Paisa
Item No. 5 (C) Fly Ash Bricks Fifteen Only
Extra for half brick masonry in superstructure above plinth Rupees Forty Eight and Paisa
level upto floor two level. (A) Modular Fifty One Only
Extra for half brick masonry in superstructure above plinth Rupees Fifty Three and Paisa
level upto floor two level. (B) Conventional Thirteen Only
Extra for half brick masonry in superstructure above plinth Rupees Fifty Three and Paisa
level upto floor two level. (C)Fly Ash Bricks Thirteen Only
Extra for half brick masonry in superstructure above floor
235 06011AA 6.33 Sqm 6 6.06 Rupees Six and Paisa Six Only
two level. (A) Modular
Extra for half brick masonry in superstructure above floor Rupees Six and Paisa Fifteen
two level.(B) Conventional Only
Extra for half brick masonry in superstructure above floor Rupees Seven and Paisa Twenty
two level. (C) Fly Ash Bricks Eight Only
Half brick thick honey- comb brick work with common burnt clay
building bricks having crushing strength not less than 35 Rupees Three Hundred Fifteen
Kg/Sq.Cm. (i) In Cement Mortar 1:4 ( 1- Cement : 4 and Paisa Twenty Six Only
Half brick thick honey- comb brick work with common burnt clay
building bricks having crushing strength not less than 35 Rupees Three Hundred Eight and
Kg/Sq.Cm. (ii) In Cement Mortar 1:5 ( 1- Cement : 5 Paisa Ninety Only
Half brick thick honey- comb brick work with common burnt clay
building bricks having crushing strength not less than 35 Rupees Three Hundred Fifty
Kg/Sq.Cm. (iii) Fly Ash Brick In Cement Mortar 1:5 ( 1-Cement : 5 - Eight and Paisa Seventy One Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Masonary work using Aerated light weight concrete block having
crushing strength not less than 35 kg/sqcm for super structure Rupees Four Thousand Five
241 6014 0 above plinth level upto floor two level in cement mortar 1:5 ( 1 cu.m 4552.32 4597.84 Hundred Ninety Seven and Paisa
cement : 5 fine sand ) complete as per Eighty Four Only
Technical Specification
Providing and laying Precast Lightweight concrete hollow core
wall with hollow core concrete unit of approved make & size of
mm thick, 600 mm wide and 2400 mm / 2600 mm / 2850 mm /
Rupees Seven Hundred Fifty
242 6015 0 3000 mm / 3300 mm in legth made from of controlled cement Sqm 747
Four and Paisa Forty Seven Only
concrete M20 having cube compressive strength not less than
MPa jointing with high strength & tensile adhesion non-shrink
cementitious joint compound / P.U. Foam. (Plaster not required)
Providing and laying Precast Lightweight concrete hollow core
wall with hollow core concrete unit of approved make & size of
120 mm thick, 600 mm wide and 2400 mm / 2600 mm / 2850 mm
Rupees Eight Hundred Fifty and
243 6016 0 / 3000 mm / 3300 mm in legth made from of controlled cement Sqm 842
Paisa Forty Two Only
concrete M20 having cube compressive strength not less than
MPa jointing with high strength & tensile adhesion non-shrink
cementitious joint compound / P.U. Foam. (Plaster not required)
Providing and laying Precast Regular concrete hollow core wall
with hollow core concrete unit of approved make & size of 92 mm
thick, 600 mm wide and 2400 mm / 2600 mm / 2850 mm / 3000 Rupees Seven Hundred Eighty
244 6017 0 mm / 3300 mm in legth made from of controlled cement concrete Sqm 777 784.77 Four and Paisa Seventy Seven
M35 having cube compressive strength not less than 35 MPa Only
jointing with high strength & tensile adhesion non-shrink
cementitious joint compound / P.U. Foam. (Plaster not required)
Providing and laying Precast Regular concrete hollow core wall
with hollow core concrete unit of approved make & size of
mm thick, 600 mm wide and 2400 mm / 2600 mm / 2850 mm / Rupees Eight Hundred Eighty
245 6018 0 3000 mm / 3300 mm in legth made from of controlled cement Sqm 875 883.75 Three and Paisa Seventy Five
concrete M35 having cube compressive strength not less than 35 Only
MPa jointing with high strength & tensile adhesion non-shrink
cementitious joint compound / P.U. Foam. (Plaster not required)
(i) Uncoursed Rubble Masonry with hard stone of approved
Rupees Two Thousand Five
quality in foundations and plinth in Cement Mortar 1:6 (1-
246 07001AA 7.6 cu.m 2537.14 2562.51 Hundred Sixty Two and Paisa
cement : 6-coarse sand including levelling up etc.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
(ii) Uncoursed Rubble Masonry with hard stone of approved
Rupees Two Thousand Six
quality in foundations and plinth in Cement Mortar 1:5 (1-cement
247 07001BA 7.6 cu.m 2580.06 2605.86 Hundred Five and Paisa Eighty
: 5-coarse sand including levelling
up etc. complete
(iii) Uncoursed Rubble Masonry with hard stone of approved
Rupees Two Thousand Four
quality in foundations and plinth in Lime Mortar 1:1.5 (1-Lime :
248 07001CA 7.6 cu.m 2379.73 2403.53 Hundred Three and Paisa Fifty
1.5-coarse sand including levelling up etc.
Extra over Item 7.6 for super structure above plinth level Rupees Three Hundred Sixty Five
upto floor two level and Paisa Fifty Five Only
Extra for additional lift in superstructure above floor two Rupees Twenty Five and Paisa
level. Sixty Two Only
Coursed rubble masonry with hard stone of approved quality in Rupees Three Thousand Four
251 07004A 7.17 A foundations and plinth in Cement Mortar 1:6 (1- Cement : 6-coarse cu.m 3384.01 3417.85 Hundred Seventeen and Paisa
sand) etc. complete. Eighty Five Only
Coursed rubble masonry with stone of approved quality in Rupees Three Thousand Four
252 07005AA 7.17 B foundations and plinth in Cement Mortar 1:5 (1-Cement : 5- coarse cu.m 3423.03 3457.26 Hundred Fifty Seven and Paisa
sand) etc. complete. Twenty Six Only
Coursed rubble masonry with stone of approved quality in Rupees Three Thousand Five
253 07005BA 7.17 C foundations and plinth in Cement Mortar 1:4 (1-Cement : 4- cu.m 3537.34 3572.71 Hundred Seventy Two and Paisa
coarse sand) etc. complete. Seventy One Only
Coursed rubble masonry with stone of approved quality in Rupees Three Thousand Seven
254 07005CA 7.17 D foundations and plinth in Cement Mortar 1:3 (1-Cement : 3- coarse cu.m 3749.61 3787.11 Hundred Eighty Seven and Paisa
sand) etc. complete. Eleven Only
Extra over item No. 7.17 for superstructure above plinth Rupees Three Hundred Forty
level upto floor two level One and Paisa Sixty Three Only
Extra for additional lift in superstructure above floor two Rupees Thirty Seven and Paisa
level. Thirty Seven Only
White Stone Bela mesonry block in course in superstructure with
Rupees Four Thousand Nine
stone of approved quality in Lime Mortar 1:1.5 (1-Lime putty : 1.5-
257 07008A 0 cu.m 4891.95 4940.87 Hundred Forty and Paisa Eighty
finesand) including
packing the joints etc. complete.
White Stone Bela mesonry work in partition walls upto 15 cm
Rupees Six Hundred Eighteen
258 07009A 0 thickness in cement Mortar 1:4 ( 1- Cement : 4- course Sqm 612.37
and Paisa Forty Nine Only
White Stone Bela mesonry block in course in superstructure with
Rupees Five Thousand Nine
stone of approved quality in Lime Mortar 1:5 (1-Cement :5- course
259 07010A 0 cu.m 5919.43 5978.62 Hundred Seventy Eight and Paisa
sand) including packing
the joints etc. complete.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
White Stone Bela mesonry block in course in superstructure with
Rupees Five Thousand Nine
stone of approved quality in Lime Mortar 1:6 (1-Cement : 6- course
260 07011A 0 cu.m 5892.11 5951.03 Hundred Fifty One and Paisa
sand) including packing
the joints etc. complete.
Precast concrete block masonry (including quoin blocks jamb
blocks closer etc.) with solid concrete blocks of approved size
Rupees Three Thousand Seven
made of cement concrete 1:3:6 mix (1- Cement : 3 coarse sand: 6-
261 07012A 7.75 cu.m 3689.53 3726.43 Hundred Twenty Six and Paisa
graded stone aggregates of 20 mm and down grade) in foundation
Forty Three Only
and plinth cement
Extra for masonry work with precast concrete block in Rupees Two Hundred Seventy
superstructue above plinth upto floor two level. Five and Paisa One Only
Precast concrete block masonry in partition walls 10 cm. thick
with solid block of approved size (including quion blocks Jamb Rupees Six Hundred Seventy
blocks closer etc.) made of C.C.1:3:6 (1- Cement : 3- coarse sand : 6 and Paisa Fifty Only
graded stone aggregates 20 mm and down grade) (A) in C.M. 1:4.
Providing and laying hollow block masonry 90 mm thick using
hollow concrete blocks IS 2185 (Part-I ) grade B (5.0) with Cement
Mortar 1:4 laying in perfect line level and plinth preparing grading Rupees Three Hundred Seventy
the joints incl. the cost of scaffolding and curing etc. (A) Block Six and Paisa Sixteen Only
masonry in 1:1:8
cement lime mortar
Providing and laying hollow block masonry 140 mm thick using
follow blocks masonry IS 2185 (Part-I ) grade B (5.0) with Cement
Mortar 1:4 laying in parfect line level and plint propering groding Rupees Four Hundred Fifty Five
the jaints ind. the cast of seaffolding and quiring etc . (A) Block and Paisa Thirty Six Only
masonry in 1:1:8
cement lime mortar
Providing and laying hollow block masonry 190 mm thick using
follow blocks masonry IS 2185 (Part-I ) grade B (5.0) with Cement
Mortar 1:4 laying in perfect line level and plint propering groding Rupees Five Hundred Nineteen
the jaints ind. the cast of seaffolding and quiring etc (A) Block and Paisa Sixty Only
masonry in 1:1:8
cement lime mortar
Providing formwork of ordinary timber planking so as to give a
rough finish including centering shuttering strutting and propping
etc. Height of propping and centering below supporting floor to Rupees One Hundred Seventy
ceiling not exceeding 4 M. and removal of the same for in situ Nine and Paisa Thirty Six Only
reinforced concrete and plain concrete work in. (A) Foundations
Footings Bases of Columns etc. and Mass concrete.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing formwork of ordinary timber planking so as to give a
rough finish including centering shuttering strutting and propping
etc. Height of propping and centering below supporting floor to
Rupees Two Hundred Sixty and
268 09001B1A 9.1 ceiling not exceeding 4 M. and removal of the same for in situ Sqm 258.3
Paisa Eighty Eight Only
reinforced concrete and plain concrete work in. (B) Flat surfaces
such as soffits of supspened floors slabs Landings and the like. (1)
Floors etc. upto 200 mm in thickness.
Providing formwork of ordinary timber planking so as to give a
rough finish including centering shuttering strutting and propping
etc. Height of propping and centering below supporting floor to
Rupees Two Hundred Eighty
269 09001B2A 9.1 ceiling not exceeding 4 M. and removal of the same for in situ Sqm 277.67
and Paisa Forty Five Only
reinforced concrete and plain concrete work in. (B) Flat surfaces
such as soffits of suspended floor roof slabs Landings and the like.
(2) Floors etc. above 200mm in thickness.
Providing formwork of ordinary timber planking so as to give a
rough finish including centering shuttering strutting and propping
etc. height of propping and centering below supporting floor to
Rupees Two Hundred Thirty
270 09001CA 9.1 ceiling not exceeding 4 M. and removal of the same for in situ Sqm 235.7
Eight and Paisa Six Only
reinforced concrete and plain concrete work in. (C) Vertical
surface such as walls (any thickness) partitions and the like
including attached buttresses & string course & the like.
Providing formwork of ordinary timber planking so as to give a
rough finish including centering shuttering strutting and propping
etc. height of propping and centering below supporting floor to Rupees Three Hundred Eleven
ceiling not exceeding 4 M. and removal of the same for in situ and Paisa Forty Three Only
reinforced concrete and plain concrete work in. (G) Columns
PillarsPosts and struts. (1) Square Rectangular Polygonal in plan.
Providing formwork of ordinary timber planking so as to give a
rough finish including centering shuttering strutting and propping
etc. height of propping and centering below supporting floor to Rupees Four Hundred One and
ceiling not exceeding 4 M. and removal of the same for in situ Paisa Eleven Only
reinforced concrete and plain concrete work in. (G) Columns
PillarsPosts and struts. (2)Circular or curved in Plan.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing formwork of ordinary timber planking so as to give a
rough finish including centering shuttering strutting and propping
etc. height of propping and centering below supporting floor to
Rupees Two Hundred Two and
273 09001H1A 9.1 ceiling not exceeding 4 M. and removal of the same for in situ Sqm 200.18
Paisa Eighteen Only
reinforced concrete and plain concrete work in. (H) (1) Sides and
soffits of Beams Beam Haunchings cantilevers Girders Bressumers
and Lintels not exceeding 1 M. in Depth.
Providing formwork of ordinary timber planking so as to give a
rough finish including centering shuttering strutting and propping
etc. height of propping and centering below supporting floor to
Rupees Two Hundred Sixty
274 09001H2A 9.1 ceiling not exceeding 4 M. and removal of the same for in situ Sqm 264.76
Seven and Paisa Forty One Only
reinforced concrete and plain concrete work in. (H) (2) Sides and
soffits of Beams Beam Haunchings canti-levers Girders
Bressumers and Lintels exceeding 1M.in Depth.
Providing formwork of ordinary timber planking so as to give a
rough finish including centering shuttering strutting and propping
etc. height of propping and centering below supporting floor to Rupees Seventy One and Paisa
ceiling not exceeding 4 M. and removal of the same for in situ Fifty Nine Only
reinforced concrete and plain concrete work in. (I) Edges of slabs
and Breaks in floors and walls.
Providing formwork of ordinary timber planking so as to give a
rough finish including centering shuttering strutting and propping
etc. height of propping and centering below supporting floor to
Rupees Six Hundred Eighty Four
276 09001KA 9.1 ceiling not exceeding 4 M. and removal of the same for in situ Sqm 678.04
and Paisa Eighty Two Only
reinforced concrete and plain concrete work in. (K) Small
surfaceassuch as cantiever brackets and ends of steps caps and
basses to pilasters and Columns and the like.
Providing formwork of ordinary timber planking so as to give a
rough finish including centering shuttering strutting and propping
etc. height of propping and centering below supporting floor to Rupees One Hundred Seventy
ceiling not exceeding 4 M. and removal of the same for in situ Three and Paisa Eighteen Only
reinforced concrete and plain concrete work in. (L) Chullah Hoods,
weather shades Chhajjas Corbels etc. including edges.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing formwork of ordinary timber planking so as to give a
rough finish including centering shuttering strutting and propping
etc. height of propping and centering below supporting floor to
Rupees Two Hundred Fifty Four
278 09001MA 9.1 ceiling not exceeding 4 M. and removal of the same for in situ Sqm 251.84
and Paisa Thirty Six Only
reinforced concrete and plain concrete work in. (M) Staircase with
sloping or stepped soffits including risers and stringers excluding
Providing formwork of ordinary timber planking so as to give a
rough finish including centering shuttering strutting and propping
etc. height of propping and centering below supporting floor to Rupees Three Hundred Ninety
ceiling not exceeding 4 M. and removal of the same for in situ Six and Paisa Twenty Two Only
reinforced concrete and plain concrete work in. (Q) Vertical fins
and vertical sun breakers.
Extra for additional height of propping and centering where the
height of propping and centering exceeds 4 .O M between
Rupees Four Hundred and Paisa
280 09002AA 9.2 supporting floor to ceiling including temporary brick or stone Sqm 396.14
pillars for supporting as required. (i)Height more than 4.0 M.and
Extra for additional height of propping and centering where the
height of propping and centering exceeds 4 .O M between
Rupees Seven Hundred Six and
281 09002BA 9.2 supporting floor to ceiling including temporary brick or stone Sqm 699.06
Paisa Five Only
pillars for supporting as required. (ii) Height more than 5.0 M.and
Extra for additional height of propping and centering where the
height of propping and centering exceeds 4 .O M between Rupees Five Hundred Eighty
282 09002CA 9.2 supporting floor to ceiling including temporary brick or stone Sqm 577.95 583.73 Three and Paisa Seventy Three
pillars for supporting as required. (iii) Height more than 6.0 M. and Only
Extra for Providing formwork with sheathing steel sheets so as to
Rupees Ninety Seven and Paisa
283 09003AA 9.7 give a fair finish in (A) Foundations, Footings, Bases of Sqm 96.37
Thirty Three Only
Columns etc. and Mass concrete
Extra for Providing formwork with sheathing steel sheets so as to
give a fair finish in (B)Flat surfaces such as soffits of slabs Landings Rupees Ninety Seven and Paisa
and the like. (1) Floors etc. upto 200mm in Thirty Three Only
Extra for Providing formwork with sheathing steel sheets so as to
give a fair finish in (B) Flat surfaces such as soffits of slabs Rupees Ninety Seven and Paisa
Landings and the like. 2) Floors etc.above 200mm in Thirty Three Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Extra for Providing formwork with sheathing steel sheets so as to
give a fair finish in (C)Vertical surface such as walls (anythickness) Rupees Ninety Seven and Paisa
partitions & lime including attached pilasters buttresses plinth & Thirty Three Only
string course & like.
Extra for Providing formwork with sheathing steel sheets so as to
Rupees Ninety Seven and Paisa
287 09003G1A 9.7 give a fair finish in (G) Columns, Pillars, Posts and struts. (1) Sqm 96.37
Thirty Three Only
Square, Rectangular or polygonal in plan.
Extra for Providing formwork with sheathing steel sheets so
Rupees Ninety Seven and Paisa
288 09003G2A 9.7 as to give a fair finish in (G) Columns, Pillars, Posts and struts. (2) Sqm 96.37
Thirty Three Only
Circular or curved in plan
Extra for Providing formwork with sheathing steel sheets so as to
give a fair finish in (H)(1) Sides and soffits of Beams, Beam Rupees Ninety Seven and Paisa
Haunchingscantilevers Girders, Bressumers and Lintels not Thirty Three Only
exceeding 1 M. in Depth.
Extra for Providing formwork with sheathing steel sheets so as to
give a fair finish in (H) (2) Sides and soffits of Beams, Beam Rupees Ninety Seven and Paisa
Haunchings cantilevers Girders, Bressumers and Lintels exceeding Thirty Three Only
Extra for Providing formwork with sheathing steel sheets so as to
Rupees Ninety Seven and Paisa
291 09003IA 9.7 give a fair finish in (I) Edges of slabs and Breaks in Sqm 96.37
Thirty Three Only
floors and walls.
Extra for Providing formwork with sheathing steel sheets so as to
give a fair finish in (K) Small surfaceas such as centilever Rupees Ninety Seven and Paisa
endsnBrackets and end of steps caps and basses to pilasters and Thirty Three Only
Columns including edges.
Extra for Providing formwork with sheathing steel sheets so as to
Rupees Ninety Seven and Paisa
293 09003LA 9.7 give a fair finish in (L) Chullah Hoods weather Shades Sqm 96.37
Thirty Three Only
Chhajjas Corbels etc. and the like.
Extra for Providing formwork with sheathing steel sheets so as to
give a fair finish in (M)Staircase with sloping or stepped soffits Rupees Ninety Seven and Paisa
including sisers and stringers excluding Thirty Three Only
Extra for Providing formwork with sheathing steel sheets so as to
Rupees Ninety Seven and Paisa
295 09003QA 9.7 give a fair finish in (Q)Vertical fins and vertical sun Sqm 96.37
Thirty Three Only
WOOD WORK & JOINERY
Providing wood work in frames of Doors, windows cleare story
Rupees Six Hundred Ten and
296 10001A 10.1 windows and othersimilar works wrought, framede and fixed in 10 Cu.Dm. 604.19
Paisa Twenty Three Only
position. (A) Indian Teak Wood
Providing wood work in Trusses, Purling, Rafter, Post,Post Plates, Rupees One Thousand Three
297 10002A 10.4 wall plates and the like wrought framed, hoisted Cu.Dm. 1370.4 1384.10 Hundred Eighty Four and Paisa
and fixed in position Ten Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing wood work in frames of false- ceiling, partitions etc Rupees Six Hundred Sixty Five
sawn and put up in position. (A) Indian Teak Wood and Paisa Thirty Three Only
Providing and fixing 35 mm thick shutters for Doors, windows and
clear story windows including anodised alluminium butt hinges Rupees Four Thousand Thirty
with necessary screws.(A) Indian Nine and Paisa Ninety One Only
Teak Wood (1) Fully Panelled
Providing and fixing 35 mm thick shutters for Doors, windows and
Rupees Three Thousand Three
clear story windows including anodised alluminium butt hinges
300 10004BA 10.12 Sqm 3292.26 3325.18 Hundred Twenty Five and Paisa
with necessary screws. (A) Indian
Teak Wood (ii) Fully Glazed.
Providing and fixing 35 mm thick shutters for Doors, windows and
Rupees Three Thousand Six
clear story windows including anodised alluminium butt hinges
301 10004CA 10.12 Sqm 3646.08 3682.54 Hundred Eighty Two and Paisa
with necessary screws. (A) Indian Teak Wood(iii) Partly panelled
Fifty Four Only
and partly glazed.
Providing and fixing 35 mm thick shutters for Doors, windows and
Rupees Three Thousand Seven
clearstory windows including blackenamelled
302 10005AA 10.13 Sqm 3710.98 3748.09 Hundred Forty Eight and Paisa
M.S. butt hinges with necessary screws. (A) Indian teak
wood. (i) Fully Panelled.
Providing and fixing 35 mm thick shutters for Doors, windows and
clearstory windows including blackenamelled Rupees Three Thousand Thirty
M.S. butt hinges with necessary screws. (A) Indian teak Three and Paisa Thirty Six Only
wood. (ii) Fully Glazed.
Providing and fixing 35 mm thick shutters for Doors, windows and
Rupees Three Thousand Three
clearstory windows including blackenamelled
304 10005CA 10.13 Sqm 3357.16 3390.73 Hundred Ninety and Paisa
M.S. butt hinges with necessary screws. (A) Indian teak wood. (iii)
Seventy Three Only
Partly panelled and partly glazed.
Providing and fixing 25 mm thick shutters for cupboards etc. Rupees Three Thousand One
305 10006AA 10.15 including anodised alluminium butt hinges with necessary screws. Sqm 3109.95 3141.05 Hundred Forty One and Paisa
(A) Indian teak wood. (i) Fully Panelled. Five Only
Providing and fixing 25 mm thick shutters for cupboards etc. Rupees Two Thousand Six
306 10006BA 10.15 including anodised alluminium butt hinges with necessary screws. Sqm 2659.61 2686.21 Hundred Eighty Six and Paisa
(A) Indian teak wood. (ii) Fully Glazed. Twenty One Only
Providing and fixing 25 mm thick shutters for cupboards etc.
Rupees Two Thousand Nine
including anodised alluminium butt hinges with necessary screws.
307 10006CA 10.15 Sqm 2884.78 2913.63 Hundred Thirteen and Paisa
(A) Indian teak wood. (iii) Partly panelled
Sixty Three Only
and partly glazed.
Providing and fixing 25 mm thick shutters for cupboards etc. Rupees Three Thousand One
308 10007AA 10.16 including black enamelled M.S. butt hinges with necessary screws. Sqm 3081.92 3112.74 Hundred Twelve and Paisa
(A) Indian teak wood. (i) Fully Panelled. Seventy Four Only
Providing and fixing 25 mm thick shutters for cupboards etc. Rupees Two Thousand Six
309 10007BA 10.16 including black enamelled M.S. butt hinges with necessary screws. Sqm 2631.56 2657.88 Hundred Fifty Seven and Paisa
(A) Indian teak wood. (ii) Fully Glazed. Eighty Eight Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing 25 mm thick shutters for cupboards etc.
Rupees Two Thousand Eight
including black enamelled M.S. butt hinges with necessary screws.
310 10007CA 10.16 Sqm 2856.74 2885.31 Hundred Eighty Five and Paisa
(A) Indian teak wood. (iii) Partly panelled
Thirty One Only
and partly glazed.
Add extra for providing and fixing 40 mm thick shutters Rupees Two Hundred Three and
instead of 35 mm thick shutters. Paisa Three Only
Providing and fixing 35 mm thick panelled ,glazed or panelled and
Rupees Three Thousand Five
glazed shutters, for Doors windows and clearstory windows
312 10009AA 10.23 Sqm 3545.57 3581.03 Hundred Eighty One and Paisa
including anodised alluminium But hinges with necessary screws
and indian teak wood shutters with. (A) Plywood sheet panels.
Providing and fixing 35 mm thick panelled ,glazed or panelled and
Rupees Three Thousand Five
glazed shutters, for Doors windows and clearstory windows
313 10009BA 10.23 Sqm 3551.12 3586.63 Hundred Eighty Six and Paisa
including anodised alluminium But hinges with necessary screws
Sixty Three Only
and indian teak wood shutters with. (B) Particle board panels
Providing and fixing 35 mm thick panelled ,glazed or panelled and
Rupees Three Thousand Five
glazed shutters, for Doors windows and clearstory windows
314 10009CA 10.23 Sqm 3519.49 3554.68 Hundred Fifty Four and Paisa
including anodised alluminium But hinges with necessary screws
Sixty Eight Only
and indian teak wood shutters with. (C) Hard board panels.
Providing and fixing 35 mm thick panelled ,glazed or panelled and
Rupees Three Thousand Five
glazed shutters, for Doors windows and clearstory windows
315 10009DA 10.23 Sqm 3491.69 3526.61 Hundred Twenty Six and Paisa
including anodised alluminium But hinges with necessary screws
and indian teak wood shutters with. (D) Asbestos sheet panels.
Providing and fixing 35 mm thick panelled ,glazed or panelled and
Rupees Three Thousand Two
glazed shutters, for Doors windows and clearstory windows
316 10010AA 10.24 Sqm 3258.35 3290.93 Hundred Ninety and Paisa
including black enamelled M.S. But hinges with necessary screws.
Ninety Three Only
(A) Plywood sheet panels.
Providing and fixing 35 mm thick panelled ,glazed or panelled and
Rupees Three Thousand Two
glazed shutters, for Doors windows and clearstory windows
317 10010BA 10.24 Sqm 3263.61 3296.25 Hundred Ninety Six and Paisa
including black enamelled M.S. But hinges with necessary screws.
Twenty Five Only
(B) Particle board panels
Providing and fixing 35 mm thick panelled ,glazed or panelled and
Rupees Three Thousand Two
glazed shutters, for Doors windows and clearstory windows
318 10010CA 10.24 Sqm 3231.98 3264.30 Hundred Sixty Four and Paisa
including black enamelled M.S. But hinges with necessary screws.
(C) Hard board panels.
Providing and fixing 35 mm thick panelled ,glazed or panelled and
Rupees Three Thousand Two
glazed shutters, for Doors windows and clearstory windows
319 10010DA 10.24 Sqm 3204.48 3236.52 Hundred Thirty Six and Paisa
including black enamelled M.S. But hinges with necessary screws .
(D) Asbestos sheet panels.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Provoding and fixing flush door shutters, solid core construction
with frame of first class hardwood with cross board and face
veneer or plywood face panels, including anodised alluminium Rupees One Thousand Eight
320 10011 10.3 butt hinges with necessary screws. (B) Non-decorative type and Sqm 1811.62 1829.74 Hundred Twenty Nine and Paisa
block board core anodised alluminium butt hinges in flush door Seventy Four Only
shutters (2) 35 mm
Extra for using bright finished M.S. piano hinges of (A) Rupees Nine Hundred Fourteen
Nickel plated piano hinges. and Paisa Thirty Two Only
Extra for providing vision panel not exceeding 0.1 Sq.M. in all types Rupees Twenty Four and Paisa
of flush doors. (A) Rectangular or Square. Thirty One Only
Providing and fixing 30 mm wire gauge shutters using galvanised
M.S. wire of I.S. gauge designation of 85 G. with wire of 0.56 mm Rupees Two Thousand Seven
323 10014A 10.5 dia,for Doors, windows and clearstory windows including Sqm 2746.26 2773.72 Hundred Seventy Three and
anodised alluminium butt hinges with necessary screws. (A) Paisa Seventy Two Only
Indian teak wood.
Providing and fixing 30 mm wire gauge shutters using galvanised
M.S. wire of I.S. gauge designation of 85 G. with wire of 0.56 mm
Rupees One Thousand Two
dia,for Doors, windows and clearstory windows including bright
324 10015A 10.5 Sqm 1246.26 1258.72 Hundred Fifty Eight and Paisa
finished or/ and black enamellede
Seventy Two Only
M.S. butt hinges with necessary Mango wood or equivalent
Extra for providing and fixing galvanised M.S wire gauge of
I.S. gauge designation 140 G,to 000 Rs. windows and cleastory Rupees Twenty Nine and Paisa
windows with wire of dia 0.71 mm instead of I,S,gauge designation Twenty One Only
85 G.with wire of dia.0.56 mm.
Providing and fixing 12 mm thick and 100mm wide pelmet of flat
pressed 3 layer neneed particle board solid core with 25 mm Rupees Two Hundred Eighteen
diametre alluminium curtain Road and brackets including fixing and Paisa Ninety Two Only
with 25mm x 3mm M.S flat 10cm,long and plugs etc.complete.
Providing and fixing 40mm panelled, Glazed or panelled and
Rupees Three Thousand Five
glazed partitions fixed to frames with iron scews etc. complete
327 10018A 10.8 Sqm 3485.12 3519.97 Hundred Nineteen and Paisa
with indian teak wood (Frames tobe paid
Ninety Seven Only
Providing and fixing Decorative plywood 4mm thick in partitions
including fixing to frames with screws etc, complete with 50mm x Rupees Eight Hundred Fifty Six
12mm teak wood beading (Frames and Paisa Thirty Six Only
tobe paid separately)
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing in partitions 4mm thick medium hard board
of approved quality including fixing to fames with screws etc, Rupees Five Hundred Thirty Six
complete with 50mm x 12mm teak wood beading (Frames tobe and Paisa Forty Four Only
paid separately)
25 mm thick wooden shelves supported on 40 x 40mm x 6 mm T
Rupees One Thousand Three
or L iron brackets fixed at suitable distances but not exceeding
330 10022A 11 Sqm 1325.72 1338.98 Hundred Thirty Eight and Paisa
cm. apart with Mango wood or equivalent
Ninety Eight Only
40 mm thick wooden shelves supported on 40 x 40mm x 6 mm T
Rupees One Thousand Seven
or L iron brackets fixed at suitable distances not exceeding 75 cm.
331 10023A 11 Sqm 1710.12 1727.22 Hundred Twenty Seven and
apart with Mango wood or equivalent
Paisa Twenty Two Only
Providing and fixing M.S. round or square bars with M.S.flats at
Rupees Seventy and Paisa Fifty
332 10024A 11 required spacing in wooden frames of windows kg 69.8
and clerestory windows.
Providing and fixing M.S. grills of required pattern to wooden
frames of windows etc. with M.S. flats at required spacings and Rupees One Hundred Five and
frame alround, square or round bars with round headed bolts and Paisa Eighteen Only
nuts or by screws (A) Plain Grill.
Providing and fixing M.S. grills of required pattern to wooden
frames of windows etc. with M.S. flats at required spacings and
Rupees One Hundred Fifty Eight
334 10025BA 10.1 frame alround, square or round bars with round headed bolts and kg 156.92
and Paisa Forty Nine Only
nuts or by screws. (B)
ORNAMENTAL GRILL
Providing and fixing hard drawn steel wire fabric 75mm x 25mm
Rupees Seven Hundred Seventy
mesh or weight not less than 7.75 kg. per Sq.M. to window frames
335 10026A 10.1 Sqm 770.07 777.77 Seven and Paisa Seventy Seven
etc. including 60 x 20mm beading of teak
Providing and fixing Fly proof galvanised M.S. wire gauge of
I.S.l gauge designation 85 G. with wire of dia.0.56 mm to windows Rupees Six Hundred Eighty Five
and celevating windows including 60 x 20mm beading of teak and Paisa Ninety One Only
Providing and fixing first class indian teak wood 75mm x 60mm Rupees Four Hundred Ninety
moulded hand rails in straight lengths complete. One and Paisa Seven Only
(i) Providing and fixing glazed louvered glass windows and
Rupees Four Thousand Two
ventilators with teak wood frame 10cm. x 7cm. size including
338 10029AA 0 Sqm 4160.51 4202.12 Hundred Two and Paisa Twelve
coats of oil painting to wood work
(ii) Providing and fixing glazed louvered glass windows and
Rupees Four Thousand Four
ventilators with teak wood frame 10cm. x 7cm. size including
339 10029BA 0 Sqm 4390.45 4434.35 Hundred Thirty Four and Paisa
coats of oil painting to wood work etc.complete. with wooden
Thirty Five Only
louvers plank 12mm thick
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing 35 mm thick shutters for Doors, windows and
clerestory windows including Indian teak wood frames 10 cm x 7 Rupees Four Thousand Six
340 10030A 0 cm. size including anodized alluminium fixtures and fastenings Sqm 4595.06 4641.01 Hundred Forty One and Paisa
including primer coat of approved quality and two coats of oil One Only
painting etc, complete. (i) Fully Glazed.
Providing and fixing 35 mm thick shutters for Doors, windows and
clerestory windows including Indian teak wood frames 10 cm x 7 Rupees Five Thousand Three
341 10030B 0 cm. size including anodized alluminium fixtures and fastenings Sqm 5285.45 5338.30 Hundred Thirty Eight and Paisa
including primer coat of approved quality and two coats of oil Thirty Only
painting etc, complete. (ii) Fully Panelled.
Providing and fixing 35 mm thick shutters for Doors, windows and
clerestory windows including Indian teak wood frames 10 cm x 7 Rupees Four Thousand Nine
342 10030C 0 cm. size including anodized alluminium fixtures and fastenings Sqm 4940.25 4989.65 Hundred Eighty Nine and Paisa
including primer coat of approved quality and two coats of oil Sixty Five Only
painting etc, complete. (iii) Partly panelled and partly glazed.
Providing and fixing 35 mm thick shutters for Doors, windows and
clerestory windows including Indian teak wood frames 10 cm x 7 Rupees Four Thousand Six
343 10031A 0 cm. size including black enamelled iron oxidixed fixtures and Sqm 4595.06 4641.01 Hundred Forty One and Paisa
fastenings including primer coat of approved quality and two coats One Only
of oil painting etc, complete. (i) Fully Glazed.
Providing and fixing 35 mm thick shutters for Doors, windows and
clerestory windows including Indian teak wood frames 10 cm x 7 Rupees Five Thousand Three
344 10031B 0 cm. size including black enamelled iron oxidixed fixtures and Sqm 5285.45 5338.30 Hundred Thirty Eight and Paisa
fastenings including primer coat of approved quality and two coats Thirty Only
of oil painting etc, complete. (ii) Fully Panelled.
Providing and fixing 35 mm thick shutters for Doors, windows and
clerestory windows including Indian teak wood frames 10 cm x
Rupees Four Thousand Nine
cm. size including black enamelled iron oxidixed fixtures and
345 10031C 0 Sqm 4940.25 4989.65 Hundred Eighty Nine and Paisa
fastenings including primer coat of approved quality and two coats
Sixty Five Only
of oil painting etc, complete. (iii) Partly panelled and partly
Providing and fixing 35 mm thick shutters for Doors, windows and
clerestory windows including Indian teak wood frames 12 cm x 7 Rupees Four Thousand Eight
346 10032A 0 cm. size including anodized alluminium fixtures and fastenings Sqm 4788.5 4836.39 Hundred Thirty Six and Paisa
including primer coat of approved quality and two coats of oil Thirty Nine Only
painting etc, complete. (i) Fully Glazed.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing 35 mm thick shutters for Doors, windows and
clerestory windows including Indian teak wood frames 12 cm x 7 Rupees Five Thousand Five
347 10032B 0 cm. size including anodized alluminium fixtures and fastenings Sqm 5478.89 5533.68 Hundred Thirty Three and Paisa
including primer coat of approved quality and two coats of oil Sixty Eight Only
painting etc, complete. (ii) Fully Panelled.
Providing and fixing 35 mm thick shutters for Doors, windows and
clerestory windows including Indian teak wood frames 12 cm x 7 Rupees Five Thousand One
348 10032C 0 cm. size including anodized alluminium fixtures and fastenings Sqm 5133.69 5185.03 Hundred Eighty Five and Paisa
including primer coat of approved quality and two coats of oil Three Only
painting etc, complete. (iii) Partly panelled and partly glazed.
Providing and fixing 35 mm thick shutters for Doors, windows and
clerestory windows including Indian teak wood frames 12 cm x 7 Rupees Four Thousand Five
349 10033A 0 cm. size including black enamelled iron oxidized fixtures and Sqm 4506.62 4551.69 Hundred Fifty One and Paisa
fastenings including primer coat of approved quality and two coats Sixty Nine Only
of oil painting etc, complete. (i) Fully Glazed.
Providing and fixing 35 mm thick shutters for Doors, windows and
clerestory windows including Indian teak wood frames 12 cm x 7 Rupees Five Thousand Five
350 10033B 0 cm. size including black enamelled iron oxidized fixtures and Sqm 5478.89 5533.68 Hundred Thirty Three and Paisa
fastenings including primer coat of approved quality and two coats Sixty Eight Only
of oil painting etc, complete. (ii) Fully Panelled.
Providing and fixing 35 mm thick shutters for Doors, windows and
clerestory windows including Indian teak wood frames 12 cm x
Rupees Five Thousand One
cm. size including black enamelled iron oxidized fixtures and
351 10033C 0 Sqm 5133.69 5185.03 Hundred Eighty Five and Paisa
fastenings including primer coat of approved quality and two coats
of oil painting etc, complete. (iii) Partly panelled and partly
Add extra for providing and fixing 40mm thick shutters Rupees Two Hundred Seventy
instead of 35 mm thick shutters including oil paining etc. complete. Two and Paisa Thirteen Only
Deduct for providing and fixing 25mm thick shutters instead of
Rupees Four Hundred Forty Four
353 10035 0 mm thick shutters including oil paining etc. Sqm 439.82
and Paisa Twenty Two Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing FRP frame size 125x65 mm and 35mm thick
FRP shutter with wood grain raised panneled design finish shutter
having extra reinforcement on sides & edges in Gel coat finish. The
core of the shutter & frame is to be filed up with injected
Rupees Two Thousand Nineteen
354 10036 0 polyurethene foam done in situ alongwith embedded wooden Sqm 1999.98
and Paisa Ninety Eight Only
pieces for stiffening & also taking hinges & fintures. The whole FRP
frame & shutter is to be water proof weather proof, termite proof
& resistance to mild acid/alkali. Rates are to be inclusive of
S.S hinges with fastener sleeve & alluminium fixtures & fastenings.
Providing and fixing FRP frame size 100x50 mm and 28mm thick
FRP depress panel shutter having extra reinforcement on sides &
edges in Gel coat finish. The core of the shutter & frame is to be
filed up with injected fire retardant grade polyurethene foam done Rupees Two Thousand Three
355 10037 0 in situ alongwith embedded wooden pieces for stiffening & also Sqm 2354.22 2377.76 Hundred Seventy Seven and
taking hinges & fintures. The whole FRP frame & shutter is to be Paisa Seventy Six Only
water proof weather proof, termite proof & resistance to mild
acid/alkali. Rates are to be inclusive of S.S hinges with necessary
screws & alluminium fixtures & fastenings & fastener sleeve.
Providing and fixing FRP frame size 125x65 mm and 35mm thick
FRP shutter having extra reinforcement on sides & edges in polish
finish. The core of the shutter & frame is to be filed up with
injected polyurethene foam done in situ alongwith embedded
Rupees Two Thousand Six
wooden pieces for stiffening & also taking hinges & fintures. The
356 10038 0 Sqm 2589.15 2615.04 Hundred Fifteen and Paisa Four
whole FRP frame & shutter is to be water proof weather proof,
termite proof & resistance to mild acid/alkali. Rates are to be
S.S hinges with necessary screws & alluminium S.S fixtures &
fastenings & fastener sleeve.
Providing and fixing FRP of 28mm thick Fibre Glass shutter with
1.5 to 2.0 mm thick fire retardent grade FRP skin in depressed
panel design having extra reinforcement on sides & edges & in Gel
coat finish. The core of the shutter is to be filled up with injected
Rupees One Thousand Five
retardent grade polyurethane foam done in situ alongwith
357 10039 0 Sqm 1544.88 1560.33 Hundred Sixty and Paisa Thirty
embedded wooden pieces for stiffening & also taking hinges &
fintures. The whole FRP frame & shutter is to be water proof
,weather proof, termite proof & resistance to mild acid/alkali.
Rates are to be inclusive of S.S hinges with necessary screws &
alluminium S.S fixtures & fastenings & fastener sleeve.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing FRP of 35mm thick Fiber Glass shutter with
1.5 to 2.0 mm thick fire retardent grade FRP skin in depressed
panel design having extra reinforcement on sides & edges & in Gel
coat finish. The core of the shutter is to be filled up with injected
Rupees One Thousand Two
retardent grade polyurethane foam done in situ alongwith
358 10040 0 Sqm 1257.06 1269.63 Hundred Sixty Nine and Paisa
embedded wooden pieces for stiffening & also taking hinges &
Sixty Three Only
fintures. The whole FRP frame & shutter is to be water proof
,weather proof, termite proof & resistance to mild acid/alkali.
Rates are to be inclusive of S.S hinges with necessary screws &
alluminium fixtures & fastenings.
Supply of 35mm thick Fiber Glass shutter with 1.5 to 2.0 mm thick
fire retardent grade FRP skin in wood grain rasied panel design
having extra reinforcement on sides & edges & in polish design
finish. The core of the shutter is to be filled up with injected
retardent grade polyurethane foam done in situ alongwith
Rupees Nine Hundred Eighty Six
359 10041 0 embedded wooden pieces for stiffening & also taking hinges & Sqm 976.62
and Paisa Thirty Nine Only
fintures. The whole shutter is to be water proof ,weather proof,
termite proof & resistance to mild acid/alkali. Rates are to be
S.S hinges with necessary screws & alluminium S.S finish fixtures &
Providing and fixing windown shutter of 75x30 mm size with 4mm
fully glazed panels with PVC batten main farme size having 1.5 to
2.0 mm thick fire retardent grade FRP shutter having extra
reinforcement on sides & edges in polish finish. The core of the
Rupees Two Thousand Eight
shutter & frame is to be filed up with injected polyurethene foam
360 10042 0 Sqm 2815.47 2843.62 Hundred Forty Three and Paisa
done in situ alongwith embedded wooden pieces for stiffening &
also taking hinges & fintures. The whole FRP frame & shutter is to
be water proof weather proof, termite proof & resistance to mild
acid/alkali. Rates are to be inclusive of S.S hinges with necessary
screws & alluminium S.S fixtures & fastenings & fastener sleeve.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing 30mm thick FACTORY MADE SOLID PANEL
PVC DOOR SHUTTER consisting of frame made out of M.S. tubes of
19 gauge thickness and size of 19mm x 19mm for stiles and 15mm
x 15 mm for top and bottom rails. M.S. frame shall have a coat of
steel primers of approved make and manufacture, M.S. frame shall
be covered with 5 mm thick heat moulded PVC ‘C’ channel of size
30 x 50 mm forming stiles, and 5mm thick 75mm wide PVC sheets
Rupees One Thousand One
for top rail, lock rail and bottom rail on either side, and 10mm
361 10043 0 sqm 1135.02 1146.37 Hundred Forty Six and Paisa
(5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top
Thirty Seven Only
rail and bottom rail, Panelling of 5 stiles and rails with 30mm wide
x 5mm thick PVC sheet beading on eighter side, and joined
together with solvent cement adhesive,. An additional 5mm thick
PVC strip of 20mm width is to be stculk on the interior side of the
‘c’ channel using PVC solvent cement adhesive etc. complete as per
direction of Engineer in charge, manufacture’s specification and
Providing and fixing 30mm thick FACTORY MADE SOLID BOTH
SIDE PRELAM PANEL PVC DOOR SHUTTER consisting
of frame made out of M.S. tubes of 19 gauge thickness and size of
19mm x 19mm for stiles, top and bottom rails. M.S. frame shall
have a coat of steel primer of approved makde and manufactures.
M.S frame covered with 5mm thick heat moulded prelim PVC ‘C’
channel of siz 30mm thickness, 70 mm width of which 50mm shall
be flat and 20mm shall be tapered in 45 degree Angle on either
side forming stiles, and 5mm thick, 95mm wide pream PVC sheet
out of which 75mm shall be flat and 20mm shall be tapered in
degree on the inner side ot form top and bottom rail and 115mm Rupees Two Thousand Two
362 10044 0 wide prelim PVc sheet out of which 75nmm shall be flat and 20mm sqm 2214 2236.14 Hundred Thirty Six and Paisa
shall be tapered on both side to form lock rail, Top, bottom and Fourteen Only
lock rails shall be provided either side of the panel. 10mm (5mm x
2) thick 20mm wide cross PVC sheet shall be provided as gap
insert for top rail and bottom rails. Panelling of 5mm thck both
side prelim PVC sheet to be fitted in the M.S. frame welded,sealed
to the stiles and rails with 7mm (5mm + 2 mm) thick x 15mm wide
PVC sheet beading on inner side, and joined togeth with solvent
cement adhesive. An additional 5mm thick PVC strip of 20mm
width is to be stuck on the interior side of the ‘C” chanel using PVC
solvent adhesive etc. complete as per direction of Engineering in
charge, manufacture’s specification and rawing.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing 30mm thick FACTORY MADE SOLID SINGLE
SIDE PRELAM PANEL PVC DOOR SHUTTER consisting
of frame made out of M.S. tubes of 19 gauge thckness and size of
19mm x 19mm for stiles, and 15mm x 15mm for top and bottom
rails. The M.s. frame shall have coat of steel primers of approved
makde and manufacture. The M.S. frame shall be covered with
5mm thick heat moulded single side prelim PVC ‘C’ channel of size
30 x 50mm to form stiles and 5mm thick and 75mm wide single
side prelim PVC sheets shallbe for the top, bttom and lock rails.
Paneling of 5mm thick one side prelim sheet to be fitted in the M.S.
frame and sealed to the front (Prelam side) stiles and rails (which Rupees Two Thousand Twenty
should have a 5mm 45 degree bent portion as beading) and Three and Paisa Three Only
attached to the back (white/lvory) stiles and rails (which should
have a 10mm 90 degree bent portion as beading) using 2 nos.
15mm wide x 5mm thick PVC sheet beading inside the 9 degree
bent beading. All stiles, rails and beading to be joined to the panel
using solvent cement.An additional 5mm thick PVC strip of 20mm
width is to be struck on the interior side of the ‘C’ channel using
PvC solvent adhesive and 10mm thick (5mm x 20) thick 20mm
width cross PVC sheet to be fitted as gap insert for top and bottom
rails, etc. complete as per direction of Engineer in charge,
manufacture’s specification and drawing.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing 30mm thick FACTOR MADE FULLY
GLAZED SOLID PVC DOOR SHUTTER consisting of frame made out
of M.S. tube of 19m gauge thickness and size of 19mm x 19mm for
styles and 15mm x 15mm for top, lock and bottom rails M.S. frame
shall have a coat of steel primer of approved make and
manufacture, M.s. frame shall be covered with 5mm thick heat
moulded PVC ‘C” channel of size 75mm x 30mm x 50mm out of
which 10mm shall be bent at 90 degree towards inner side on
front face of the door forming stiles. For top rail and bottom rail,
M.S. frame shall be covered with 5mm thick, 100mm wide PVC
sheet out of whch 10mm shall be bent of 90 degree towars inner
side on front face of the door. M.S. frame at lock rail shall be
covered with 125 mm wide PVC sheet out of which 10mm on both Rupees Two Thousand Thirty
the edges shall be bent at 90 degre on front face of the door and Three and Paisa Thirteen Only
75mm wide PVC sheet shall cover the
M.S. frame at top, lock and bottom rail on side of door, 5mm thick
20mm wide cross PVC sheet as gap insert for tp and bottom
rail.PVC sheet beading of 15mm thck (5mm x 30, 15mm wide to be
stuck, internally with solvent cement adhesive in stiles and rails.
Glass panel will be fitted exernally in the clear space available
between the stiles and rails and fixed between PVC sheet of stiles
and rails bent at 90 degree on front face and 15mm x 10mm ‘L’
shape outer beading nailed on stiles and rails at the back side. So
that the ‘L’ shape PVC beading can be removed when required for
replacement of broken glass etc.
complete as per direction of Engineer in charge and
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing 30mm thick factory made wire guazed
solid PVC Door shutter consisting of frame made out of
M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for
stiles and 15mm x 15mm for top, lock and bottm rails,
M.S. frame shall have a coat of steel primers of approved make and
manufacture, 19mm x 19mm M.S. square tubes shall be coveed
with 5mm thick head mouled PVC ‘C’ channel of size 30mm
thickness, 90mm width out of which 75mm shall be flat and 15 mm
shall be bent in 90 degree angle on either side forming stiles and
5mm thick 115mm wide PVC sheet out of which 100mm shal be
flat and 15mm shal be betn in 90 degree on the inner side to from
top and bottom rails and 130mm wide PVC sheet out of which
Rupees One Thousand Nine
100mm shal be flat and 15mm shal be bent in 90 degree on both
365 10047 0 sqm 1968 1987.68 Hundred Eighty Seven and Paisa
side to from lock rail 10mm (5mm x 2) thick, 20mm wide cross
Sixty Eight Only
PVC sheet as gap insert for top rail and bottom rail, panel will be of
G.I. wire gauge of 24 gauge to be fitted in by ‘C’ channel of size
10mm x 35mm on the either side in the stiles.The inner side ‘C’
channel is fixed by 19mm x 19mm M.S. tube on both side with
screws. The wire mesh in top, bottom and lock rail is sealed with
15mm x 15mm tube with G.I.wire, 1mm (5mmm x 2) thick PVC
strip of 25mm width is to be stuck and screw on both side of G.I.
wire guage interior at the top, bottom and lock rails. An additional
5mm thck PVC strip of 20mm width is to be stuck on the interior
side of the ‘C’ channel using PVC solvent cement adhesive etc.
complete as per dirction of Engineer
in charge, manufacture’s specification and drawing.
Providing and fixing 35mm thick factory made moulded door
shuter consisting of solid core single leaf flush door of 30mm
thickness, lipped with 15mm (5mm x 3) thick x 30mm width on
one stiles and top rail and 10mm (5mm x 2) thick x 30mm width
on the other stiles and bottom rails. The inner panel laminated
Rupees Two Thousand One
with 2mm thick termite proof, water proof and fire resistant
366 10048 0 sqm 2131 2152.31 Hundred Fifty Two and Paisa
moulded PVC sheet with 2,4,6 raised panel design in different plain
Thirty One Only
and /or prelim colours on one side after routing the moulded
design on flush door and 2mm plain and/or prelim PVC sheet on
other side using rubber adhesive on flush door and solvent cement
adhesive on the PVC liping etc. complete as per direction of
Engineer in charge, manufacture’s specification and drawing.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing 30mm thick factory made moulded door
shutter wood free consisting of frame made out of
M.S. tubes of 19 gauge thickness and size of 25mm x 25mm for
stiles, top and bottom rails, M.S. frame shall have a coat of steel
primers. The inner panel shall consist of 25mm thick High Density
EPS conforming to IS 4671-1984 bonded with 2mm thick termite
proof, water proof and fire resistant moulded PVC sheet with
raised panel design in different plain and /or prelim colours after
Rupees One Thousand Nine
routing the moulded design on one side and 2mm plain and/or
367 10049 0 sqm 1960 1979.60 Hundred Seventy Nine and Paisa
prelim PVC sheet on other side of the EPS. The edges of panel to be
sealed with lipping of 10mm wide PVC sheet batton (made by
sticking 2 PVC rigid foam sheets of 5mm thickness using PVC
solvent cement) and stiles 25mm (5mm x 5) thick and 30mm
width PVC sheet fitted along M.S. tube for lock provision and for
lock height 5mm thick PVC sheet of size 150mm x 100mm fixed
with upper and lower face of inner side of EPS panel etc. complete
as per direction of Engineer in charge manufacture’s specification
Providing and fixing factory made polyvinyl chioride (PVC) door
frame of the size 50 x 47 mm with a wall thickness of 5mm, made
out of extruded 5mm rigid PVC foam sheet, mitre out of two
corners and joined with 2nos. of 150mm long brackets of 15 x
15mm M.s. Square tubes. The two vertical door profiles are to be
reinforced with 19 x 19 mm
Rupees Three Hundred Eighteen
368 10050 0 m.s. square tube of 19 gauge, EPDM rubber gasket weather seal to sqm 314.88
and Paisa Three Only
be provided through out the frame. The door frame shal be fixed to
the wall using 65/100 mm long M.S. screws through the frame by
using PVC fasteners. A miniumum of 4 nos. os screws to be
provided for each vertical members and minium 2 nos. for
horizontal members etc. complete as per manufactures
specification and direction of Engineer in charge.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing of fully glazed solid PVC panel PVC door along
with solid PVC door frame. 30mm thick FACTORY MADE FULLY
GLAZED SOLID PVC DOOR SHUTTER consisting
of frame made out of M.S. tube of 19 gauge thickness and size of
19mm x 19mm for style and 15mm x 15mm for top, lock and
bottom rail. M.S. frame shall have a coat of steel primer of
approved make and manufacture. M.S. frame shall be covered with
5 mm thick heat mouled PVC ‘C” channel of size 75mm x 30mm x
50mm out of whch 10mm shall be bent at 90 degree towards inner
side on front face of the door. M.S. frame at lock rail shall be
covered with 125 mm wide PVC sheet out of which 0mm on both
Rupees One Thousand Eight
the edges shall be bent at 90 degree on front face of the door and
369 10051 0 sqm 1880.67 1899.48 Hundred Ninety Nine and Paisa
7mm wide PVC sheet shall cover the M.S. frame at top, lock and
Forty Eight Only
bottom rail on back side of door, 5 mm thick 20mm wide cross PVC
sheet as gap insert for top and bottom rail. PVC sheet beading of
15mm thick (5mm x3) 15mm wide to be stuck internally with
solvent cement adhesive in stiles and rails. Glass panel will be fittd
externally in the clear space available between the stiles and rails
and fixed between PVC sheet of stiles and rails bent at 90 degree
on front face and 15mm x 10mm ‘L shape outer beading nailed on
stiles and rails at the back side. So tha the ‘L’ shape PVC beading
can be removed when required for replacement of broken glass
etc. complete as per direction of Engineer in charge and
manufactuture’s specification
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing complete sliding shutter solid PVC window
25mm thick factory made glazed solid PVC window shutter
consisting of frame made out of M.S. tube of 19 gauge of size 15 x
15mm for styles top, bottom rail. M.S. frame shall have a coat of
steel primer of approved make and manufacture, M.S. frame shall
be covered with 4mm thick heat mouled PVC ‘C’ channel of size
58mm x 25mm x 38 mm out of which 8mm shall be bent at
degree towards inner side on front face of the window shutter
forming stiles. For top rail and bottom rails, M>S. frame shall be
covered with 4mm thick, 58mm wide PVC sheet out of which 8mm
shall be bent at 90 degree towards inner side on front face and Rupees Two Thousand Six
370 10052 0 38mm wide PVC sheet shall cover the M.S. frame at top and bottom sqm 2576.85 2602.62 Hundred Two and Paisa Sixty
rail on back side of window shutter, 4mm thick 15mm wide cross Two Only
PVC sheet as gap insert for top and bottom rail. PVC sheet beading
of 8mm thick (4mm x 2) to be stuck internally with solvent cement
adhesive in top and bottom rails. Glass panel will be fitted
externally in the clear space available between stiles & rails and
fixed between PVC sheet of stiles and rails bent at 90 degree on
front face 12mm x 123mm ‘L’ shape outer PVC beading nailed on
stiles and rails at the back side so that ‘L’ shape outer PVC beading
can be removed when required for replacement of broken glass
etc. complete as per direction of etc. complete as per direction of
Engineer in charge and manufactuture’s specification.
Providing and fixing Plain/Printed PVC sheet wall paneling of
thickness 5mm consisting of panels having size 1220 mm x
mm stuck on inner frame work of 50mm wide strips of 5mm thick
PVC sheet. The strips should have in their center a groove of 6mm
width and 1mm depth for sinking the head of the screw used to fix
the strips to the wall and should be placed vertically at equal
Rupees Eight Hundred Fifty
371 10053 0 intervals of 10” center to center. The PVC strips shall be fixd to the sqm 845
Three and Paisa Forty Five Only
wall using 65mm long M.s. scress through the groove in the strip
by using PVC fasteners. The distance between two screws shall not
be more than 200 A groove of 2mm may be left at the joint of two
panel for aesthetic looks. The exact size of the panel and
correspondingly of the grid may vary depending on the size of the
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing Prelam PVC sheet wall paneling of thickness
5mm consisting of panels having size 1220 x 2440 mm stuck on
inner frame work of 50mm wide strips of 5mm thick PVC sheet.
The strips should have in their center a grove of 6mm width asnd
1mm depth for sinking the had of the screw using to fix the strips
of the wall and should be placed vertically at equal intervals of 10”
Rupees Nine Hundred Fifty
372 10054 0 center to center. The PVC strips shall be fixed to the wall using sqm 944
Three and Paisa Forty Four Only
M.S. scres through the groove in the strip by using PVC fasteners.
The distance between two screws shall not be more than 200 mm.
A groove of 2mm may be left at the joint of two panel for aesthetic
looks. The exact size of the panel and correspondingly of the grid
may vary depending on the size of the wall.
Providing and fixing full height Prelam PVC partition system 50mm
thick consisting of 40mm sandwich PVC panel made out of 36mm
high density expanded polystyrene sheet (E.P.S. Thermocol) stuck
on both side with 2mm thick prelim PvC sheet reinforced with
frame work made from 35mm x 5mm M.S. angle. In between two
M.S. angles 4 mm with feathered edges shall be fixed on floor and
50 x 75 mm with feathered edges prelim PVC “C” channel of size
50mm x 75mm with feathered edges prelim PVC panel shall be Rupees Two Thousand One
373 10055 0 inserted in the PVC ‘C” channel The first and last M.S. angle should sqm 2152 2173.52 Hundred Seventy Three and
be erected such that it is inside a PVC C channel of size 50 x 75mm Paisa Fifty Two Only
In between adjoining EPS sandwiched PVC partition panel 4mm
thick x 75 mm width prelim PVC sheet feathered at edges shall be
stuck on front and back face using solvent cement etc. An
additional 4mm thick PVC strip of 40mm width is to be stuck on
the intrior side of the ‘C” channel using PVC solvent adhesive
completeas per direction of Engineer in charge.
Manufacture’s specification and drawing.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing full height Plan/colour PVC partition system
50mm thick consisting of 40mm sandwich PVC panel made out of
36mm high density expanded polystyrene sheet (E.P.S. Thermocol)
stuck on both side with 2mm thick plain PVC sheet reinforced with
frame work made from 35mm x 5mm M.S. angle. In between two
M.S. angles 4 mm thick plan heat moulded PVC ‘C’ channel of size
50mm x 100 mm with feathered edes shall be fixed on floor and
x 75 mm with feathered edges plain/printed/prelim PVC ‘C’
Rupees One Thousand Eight
channel shall be fixed in the ceiling. Sandwich PVC panel shall be
374 10056 0 sqm 1783 1800.83 Hundred and Paisa Eighty Three
inserted in the PVC “c” channel. The first and last M.S. angle should
be erected such that it is inside a PVC C channel of size 50 x 75mm.
In between adjoining EPS sandwiched PVC partition panel 4mm
thick x 75mm width plain PVC sheet feathered at edges shall be
stuck on front and back face using solvent cement etc. And
additional 4mm thick PVC strip of 40mm width is to be stuck on
the interior side of the C channel using PVC solvent adhesive
complete as per direction of Engineer in charge, manufacture’s
specification and drawing.
Providing and fixing full height Printed PVC partition system
50mm thick PVC partition consisting of 40mm sandwich PVC panel
made out of 36mm high density expanded polystyred shet (EPS
Thermocol) stuck on the both side with 2mm thick printed PVC
sheet reinforced with frame work made from 35mm x 5mm M.S.
angle. IN between two
M.S. angles 4mm thick printed heat moulded PVC C channel of size
50mm x 100mm with feathered, edges shall be fixed on floor and
50 x 75 mm with feathered edges printed PVC C channel shall be
fixed in the ceiling, Sandwich PVC panel shall be inserted in the Rupees One Thousand Nine
375 10057 0 PVC C channel. The first and last M.S. angle should be erected such sqm 1902 1921.02 Hundred Twenty One and Paisa
that it is inside a PVC C channel of size 50 x 75mm In between Two Only
adjoining EP sandwiched PVC partition panel 4mm thick x 75mm
width printed PVC sheet feathered at edges shall be suck on front
and back face using solvent cement. If the height of partition
exceeds 8 feet; then 15mm x 30mm M.S. tube is welded
horizontally at the joint of panels in between two vertical angels
etc. An additional 4mm thick PVC strip of 40mm width is to be
stuck on the interior side of the C channel using PVC solvent
adhesive complete as per direction of Engineer in charge,
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing PVC plain colour false ceiing with grid type
with alu frame consisting of 600 mm x 600mm 3mm thick plain
PVC sheet used as panel insert in a frame work made using
anodized alluminium T section of size 1” x 1” (25 x 25mm,
gauge or 1mm thick) in square pattern of grid sizes of 2 x 2 (600 x
Rupees Three Hundred Three
376 10058 0 600mm). The alluminium frame work is supported from the ceiling sqm 300.12
and Paisa Twelve Only
with the help of G.I. hook and G.I. wire/6mm M.S. rods of required
sizes to maintain proper level etc. The aluminium frame work is
supported on side wall with the use of alluminium L section of size
1 x 1 (25 x 25mm) angles et. Complete as per direction of Engineer
in charge. Manufactures, specification and drawing
Providing and fixing PVC Printed pain colour false ceiling with grid
type with alluminium frame consisting of 600mm x 600mm 3mm
thick plain PVC sheet used as panel insert in a frame work made
using anodized alluminium T section of size 1 x 1 (235 x 25mm,
gauge or 1 mm thick) in square pattern of grid sizes of 2 x 2 (600 x
600mm) The alluminium frame work is supported from the Rupees Seven Hundred Seventy
cceiling with the help of Three and Paisa Sixty Six Only
G.I. hook and G.I. wire/6mm M.S. rods of required sizes to maintain
proper level etc. The aluminium frame work is supported on side
wall with the use of alluminium L section of size 1 x 1 (25 x 25mm)
angles etc. complete as per direction of Engineer in charge.
Manufactures specification and drawing.
Providing and fixing PVC plain colour false ceiling with flush type
with alluminium frame, frame work is done with three different
sections of G.I. sheet of 24 gauge thickness named as C, U and L.
The C section is fixed with hangers at an equal distance of 36” each
and then U section is fixed perpendicular on C section with steel
screws at an equal distance of 16” each. The complete frame work
is supported by G.I. L angle 6mm rod hangers from the roof and L Rupees Three Hundred Fifty Two
sections is fixed all around the wall as shown in the diagram. 5mm and Paisa Fifty Six Only
PVC sheet strips of size 2 wide and fixed with counter sunk steel
screw on the U section. Further 3mm PVC sheet is stuck to these
PVC strips with solvent cement such that joining lines are perfectly
matched. P.U. putty is filled, ceiling for getting fine surface finish
etc. complete as per direction of Engineer in charge,
manufacturer’s specification and drawing.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing PVC printed false ceiling with flush type with
alluminium frame, frame work is done with three different
sections of G.I. sheet of 24 gauge thickness named as C, U and L.
The C section is fixed with hangers at an equal distance of 36” each
and then U section is fixed perpendicular on C section with steel
screws at and equal distance of 16” each. The complete frame work
is supported by G.I. L angle/6 mm rod hangers from the roof and L
Rupees Nine Hundred Eleven
379 10061 0 sections is fixed all around the wall as shown in the diagram. 5mm sqm 902
and Paisa Two Only
PVC sheet strips of size 2 wide are fixd with counter sunk steel
screws on the U section. Further 3mm PVC sheet is stuck to these
PVC strips with solvent cement such that joining lines are perfectly
matched. P.U. putty is filled, dried and leveled and requisite coats
of primer and paint is done on the ceiling for getting fine surface
finish etc. complete as per direction of Engineering and charge
manufacturer’s specification and drawing
Extra rate for using polyester fiber (12mm) with triangular of
equivalent cross section with specific gravity 1.35 to 1.40 (as a 1 Packet of Rupees Twenty Six and Paisa
secondary reinforcement) in concrete of any grade at the rate of 125 gms Twenty Six Only
125 gms per 50 kg of Cement consumption.
Extra rate for using polyester fiber (6mm) with triangular cross of
equivalent section with specific gravity 1.35 to 1.40 (as a 1 Packet of Rupees Twenty Six and Paisa
secondary reinforcement) in mortar of any grade at the rate of 125 125 gms Twenty Six Only
gms per 50 kg of cement consumption.
Providing fusion bonded Epoxy coating not less than 175 micron
Rupees Ten Thousand One
thickness and up to 300 micron to reinforcement bars as per IS-
382 10064A 0 M.T 10062 10162.62 Hundred Sixty Two and Paisa
13620-1993/ASTM-775 M including testing of coating at plant and
all taxes (A) 10mm to 16mm dia bar
Providing fusion bonded Epoxy coating not less than 175 micron
Rupees Seven Thousand Two
thickness and up to 300 micron to reinforcement bars as per IS-
383 10064B 0 M.T 7224 7296.24 Hundred Ninety Six and Paisa
13620-1993/ASTM-775 M including testing of coating at plant and
Twenty Four Only
all taxes (B) 20mm to 32 mm dia bar
Steel work, riveted in built up sections framed work including
cutting, hoisting, fixing in position and applying a priming coat of
Rupees Five Thousand Eight
red lead paint. (A) In beams and joists, channels angles Tees, flats,
384 11001AA 11.2 q 5831.19 5889.50 Hundred Eighty Nine and Paisa
with connecting plates or angle cleats as in main and cross beams.
Hip and jack rafters, purlins conneted to common rafters and the
Steel work, riveted in built up sections framed work including
Rupees Six Thousand Seven
cutting, hoisting, fixing in position and applying a priming coat of
385 11001DA 11.2 q 6680.28 6747.08 Hundred Forty Seven and Paisa
red lead paint. (D) In trussses and trussed purlins, upto 25 M. span
and 15 M ovarall height.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Steel work, welded in built up sections framed work including
cutting, hoisting, fixing in position and applying a priming coat of
Rupees Nine Thousand One
red lead paint. (A)In beams and joists, channels angles Tees, flats,
386 11002AA 11.4 q 9018.3 9108.48 Hundred Eight and Paisa Forty
with connecting plates or angle cleats as in main and cross beams.
Hip and jack rafters, purlins conneted to common rafters and the
Steel work, welded in built up sections framed work including
cutting, hoisting, fixing in position and applying a priming coat of Rupees Nine Thousand Eight and
red lead paint. (D) In trussses and trussed purlins, upto 25 M. span Paisa Sixty Two Only
and 15 M. ovarall height.
Providing and fixing in position collapsible steel shutters with
vertical channels 20 x 10 x 2 mm braced with flat iron diagonals
Rupees Five Thousand Nine
x 5 mm size with top and bottom rails of T_rin 40x 40 x 6 mm with
388 11003A 11.6 q 5873.1 5931.83 Hundred Thirty One and Paisa
38mm dia, steel pulleys complete with bolts, nuts, locking
Eighty Three Only
arrangements, stoppers handles including applying a priming coat
of red lead paint.
Providing and fixing 1mm thick M.S. sheet sliding shutters with
frame and diagonal braces of 40 x 40 x 6 mm angle iron, 3.15 mm
Rupees Three Thousand Seven
M.S. gusset plates at Junctions and corners 25 mm dia. pulley, 40 x
389 11004A 11.7 Sqm 3743.42 3780.85 Hundred Eighty and Paisa Eighty
40 x 6mm angle and T-iron guide rail at top and bottom
respactively with handles, stoppers and locking agangement etc,
including applying a priming coat of red lead paint.
Providing and fixing rolling shutters of approved make made of
mm wide M.S. laths inter-locked together through their entire
length and jointed together at the ends by end locks mounted on Rupees Three Thousand Five
390 11005A 0 specially designed pipe shaft with bracket plates, guide channels Sqm 3519.21 3554.40 Hundred Fifty Four and Paisa
and arragements for inside and outside locking with push-pull Forty Only
operation including the cost of hood cover and spring etc.
complete.(A) Shutters having width below 3.5 M.
Providing and fixing rolling shutters of approved make made of
mm wide M.S. laths inter-locked together through their entire
length and jointed together at the ends by end locks mounted on Rupees Four Thousand Five
391 11005B 0 specially designed pipe shaft with bracket plates, guide channels Sqm 4501 4546.01 Hundred Forty Six and Paisa One
and arragements for inside and outside locking with push-pull Only
operation including the cost of hood cover and spring etc.
complete. (B) Shutters having width 3.5 M. and above
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing rolling shutters of approved make made of
mm wide M.S. laths inter-locked together through their entire
length and jointed together at the ends by end locks mounted on Rupees Two Thousand Seven
392 11006A 11.9 specially designed pipe shaft with bracket plates, guide channels Sqm 2768.9 2796.59 Hundred Ninety Six and Paisa
and arrangements for inside and outside locking with push-pull Fifty Nine Only
operation complete but excluding the cost of hood cover and
spring. (A) Shutters having width below 3.5.M.
Providing and fixing rolling shutters of approved make made of
mm wide M.S. laths inter-locked together through their entire
length and jointed together at the ends by end locks mounted on Rupees Three Thousand Seven
393 11006B 11.9 specially designed pipe shaft with bracket plates, guide channels Sqm 3747.07 3784.54 Hundred Eighty Four and Paisa
and arrangements for inside and outside locking with push-pull Fifty Four Only
operation complete but excluding the cost of hood cover and
spring. (B) Shutters having width above 3.5 M.
Providing and fixing 27.5 cm. long wire spring grade No.2 of Rupees Six Hundred Thirty Seven
approved make for rolling shutters. and Paisa Twenty Two Only
Rupees One Hundred Twenty
Providing and fixing Hood cover for rolling shutters (A)
395 11008A 11.11 Rmt 120.03 121.23 One and Paisa Twenty Three
Shutters having width below 3.5 meters
Providing and fixing Hood cover for rolling shutters (B) Rupees One Hundred Twenty Six
Shutters having width 3.5 meters and above and Paisa Seventy Two Only
Fixing standard steel Doors, windows and ventilatos inwalls with
16 x 3.15 mm longs 10 cm. long embeded in Cement Concrete
block 15 x 10 x 10 of 1:3:6 (1- Cement : 3-coarse sand : 6-graded Rupees Two Hundred Thirty
stone aggregate of 20mm size ) cost for supply of door/ window/ Eight and Paisa Six Only
ventilators shall be paid
Providing and fixing M.S. Fan clamps type 1 to 16mm dia
M.S. bar bent to shape with hooked ends to R.C.C. slabs curing, Rupees One Hundred Thirty One
laying including painting the exposed portion of loops, all as per and Paisa Ninety Three Only
standard design complete.
Extra over rate of item 20 for providing and fixing M.S. fan clamps
type-II as per standard design in R.C.C. beams during laying
399 11011 11.21 Cm Height 1.49 1.50 Rupees One and Paisa Fifty Only
towards additional height of the clamp due to
Providing and fixing M.S. round holding down or anchor Rupees Fifty Five and Paisa Sixty
bolts with nuts and washer plates complete. Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing EZ-7 section door/window frame including Rupees Two Thousand Two
401 11013 0 welding and fixtures fastenings including 3 coats of approved Sqm 2187.48 2209.35 Hundred Nine and Paisa Thirty
enamel oil paint etc complete. Five Only
Providing and fixing window having extruded aluminum Colour
anodized section frame main outer size 127mm x 38.10mm x
1.35mm @wt. 1.384kg/m, horizontal Four track member size
122.20mm x 31.75mm x 1.10mm@ wt 1.205 kg/m, vertical
member of size 122.20mm x 31.75mm x 1.50mm @1.398 kg/mt
Rupees Two Thousand One
with sliding shutters of horizontal member size 40mm x 18mm x
402 11026 0 Sqm 2119.14 2140.33 Hundred Forty and Paisa Thirty
,vertical member of size 40mm x 18mm x 1.29mm @ 0.456 kg/mt
with 5 mm thick transparent bronze colour tinted float glass with
powder coated aluminum fittings and fixtures and transparent
silicon sealant glass fixing to frame as per details etc complete for
Providing and fixing window having extruded aluminum Colour
anodized section frame main outer size 95mm x 24mm x 1.17mm
@ wt.of 0.738 Kg/mt , horizontal Three track member size 92mm x
31.75mm x 1.30mm,@ Wt.1.07 Kg/mt , vertical member of size
92mm x 31.75mm x 1.50mm @ Wt. 1.06 Kg/mt with sliding
Rupees One Thousand Five
shutters of horizontal member size 40 mmx18mm x1.29mm @
403 11027 0 Sqm 1568.27 1583.95 Hundred Eighty Three and Paisa
Ninety Five Only
0.456 Kg/mt, vertical member of size 40mm x 18mm x 1.29 mm @
wt.of 0.456Kg/mt/ with 5 mm thick transparent bronze colour
tinted float glass with powder coated aluminum fittings and
fixtures and transparent silicon sealant glass fixing to frame as per
Providing and fixing window having extruded aluminum Colour
anodized section frame main outer size 63.50 x
38.10 x 1.95 mm,@ Wt 1.094 Kg / Rmt, horizontal two track
member size 61.85 mm x 31.75 mm x 1.20mm @ wt.of
Kg/mt, vertical member of size 61.85 mm x 31.75mm x 1.30 mm @
Rupees One Thousand Seven
wt.of 0.659 Kg/mt with sliding shutters of horizontal member size
404 11028 0 Sqm 1696.73 1713.70 Hundred Thirteen and Paisa
40mm x 18mm x 1.29mm @ wt.of 0.456Kg/mt, vertical member of
size 40mm x 18mm x
1.29mm @ wt.of 0.456Kg/mt, @ Wt. 0.457 Kg/mt with 5 mm thick
transparent bronze colour tinted float glass with powder coated
aluminum fittings and fixtures and transparent silicon sealant
glass fixing to frame as per details etc complete for window.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing standared extruded of alluminium section of
size 63.50 x 38.10 x 1.95 mm @ Wt 1.094Kg / Rmt with colour
Rupees One Thousand Three
anodized alluminium frame with 5 mm thick transparent bronze
405 11029 0 Sqm 1288.93 1301.82 Hundred One and Paisa Eighty
colour tinted float glass with colour anodized alluminium frame for
ventilation with 5 mm thick frosted glass as details etc complete
Providing and fixing standared extruded of alluminium section of
size 63mm x 38.10mm x 1.2mm @ Wt. 0.643 Kg/mt with colour Rupees One Thousand One
406 11030 0 anodized alluminium frame for ventilation with 5 mm thick frosted Sqm 1163.92 1175.56 Hundred Seventy Five and Paisa
glass as details etc Fifty Six Only
complete for Ventilation
Providing and fixing standared extruded of alluminium section of
Rupees One Thousand Five
size 63.50 x 38.10 x 1.95 mm,@ Wt 1.094Kg / Rmt with colour
407 11031 0 Sqm 1509.9 1525.00 Hundred Twenty Five and Zero
anodized alluminium frame with 5 mm thick transparent bronze
colour tinted float glass as details etc complete for Fix window.
Providing and fixing extruded aluminum window having extruded
aluminum Colour Powder Coated section frame main outer size
127mm x 38.10mm x 1.35mm ,@ Wt.1.384 Kg/mt,horizontal Four
track member size 122.20mm x
31.75mm x 1.10mm @ Wt. 1.205 Kg/mt,vertical member of size
Rupees Two Thousand One
122.20mm x 31.75mm x 1.50mm ,@ Wt. 1.398 Kg/mt with sliding
408 11032 0 Sqm 2119.14 2140.33 Hundred Forty and Paisa Thirty
shutters of horizontal member size 40mm x 18mm x 1.29mm @
wt.of 0.456Kg/mt,vertical member of size 40mm x 18mm x
1.29mm @ wt.of 0.456Kg/mt,@ with 5 mm thick transparent
bronze colour tinted float glass with powder coated aluminum
fittings and fixtures and transparent silicon sealant glass fixing to
frame as per details etc complete for window.
Providing and fixing window having extruded aluminum Colour
Powder Coated section frame main outer size 95mm x 24mm x
1.17mm @ wt.of 0.738 Kg/mt, horizontal Three track member size
92mm x 31.75mm x 1.30mm @ Wt.1.07 Kg/mt, vertical member of
size 92mm x 31.75mm x 1.50mm ,@ Wt. 1.06 Kg/mt with sliding
Rupees One Thousand Five
shutters of horizontal member size 40 mmx18mm x1.29mm @
409 11033 0 Sqm 1576.11 1591.87 Hundred Ninety One and Paisa
Eighty Seven Only
0.456 Kg/mt, vertical member of size 40mm x 18mm x 1.29 mm @
wt.of 0.456Kg/mt with 5 mm thick transparent bronze colour
tinted float glass with powder coated aluminum fittings and
fixtures and transparent silicon sealant glass fixing to frame as per
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing window having extruded aluminum Colour
Powder Coated section frame main outer size 63.50 x 38.10 x
mm,@ Wt 1.094 Kg / Rmt, horizontal two track member size
mm x 31.75 mm x 1.20mm @ wt.of 0.695 Kg/mt, vertical member
of size 61.85 mm x
Rupees One Thousand Seven
31.75mm x 1.30 mm @ wt.of 0.0.659 Kg/mt with sliding shutters of
410 11034 0 Sqm 1688.78 1705.67 Hundred Five and Paisa Sixty
horizontal member size 40mm x 18mm x
1.29mm @ wt.of 0.456Kg/mt, vertical member of size 40mm x
18mm x 1.29mm @ wt.of 0.456Kg/mt with 5 mm thick transparent
bronze colour tinted float glass with powder coated aluminum
fittings and fixtures and transparent silicon sealant glass fixing to
frame as per details etc complete for window
Providing and fixing standared extruded of alluminium section of
size 63.50 x 38.10 x 1.95 mm @ Wt 1.094Kg / Rmt with colour
Rupees One Thousand Two
Powder Coated alluminium frame with 5 mm thick transparent
411 11035 0 Sqm 1278.03 1290.81 Hundred Ninety and Paisa
bronze colour tinted float glass with colour anodized alluminium
Eighty One Only
frame for ventilation with 5 mm thick frosted glass as details etc
complete for.window
Providing and fixing standared extruded of alluminium section of
Rupees One Thousand One
size 63mm x 38.10mm x 1.2mm , @ Wt. 0.643 Kg/mt with colour
412 11036 0 Sqm 1163.92 1175.56 Hundred Seventy Five and Paisa
Powder Coated alluminium frame for ventilation with 5 mm thick
frosted glass as details etc complete for Ventilation
Providing and fixing standared extruded of alluminium section of
size 63.50 x 38.10 x 1.95 mm,@ Wt 1.094Kg / Rmt with colour Rupees One Thousand Eight
413 11037 0 Powder Coated alluminium frame with 5 mm thick transparent Sqm 1815.14 1833.29 Hundred Thirty Three and Paisa
bronze colour tinted float glass as details etc complete for Fix Twenty Nine Only
Fixing Metallic tower bolts of sizes with necessary screws
Rupees Fifty and Paisa Twenty
414 12001 12.4 etc. complete (Tower bolts and screws to be paid under separate Each 49.72
Fixing Metallic flush bolts of sizes with necessary screws
Rupees Ten and Paisa Eleven
415 12002 12.5 etc. complete (Flush bolts and screws to be paid under separate Each 10.01
Fixing metallic or plastic door handles of sizes with necessary
Rupees Three and Paisa Seventy
416 12003 12.3 screws etc. complete (Door handles and screws Each 3.72
to be paid under separate items)
Fixing metallic gate and shutter hooks and eyes of size (Hoks and Rupees Three and Paisa Seventy
eyes to be paid under seperate items) Six Only
Fixing metallic door latches of sizes with necessary screws etc.
Rupees Six and Paisa Seventy
418 12005 11.11 complete (Door latches and screws to be paid under Each 6.63
separate items)
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Fixing metallic mortice night latches with necassary screws
including making necessary holes in wooden door shutter etc. Rupees Ninety Four and Paisa
complete (Mortice night latches and screw to be paid Ninety Only
under separate items)
Fixing metallic ball catchers 10mm dia. (Ball catchers to be Rupees Seven and Paisa Eighty
paid under separate item) Three Only
Fixing metallic casement window fasteners with necessary screws
421 12008 12.2 etc. complete (casement window fasteners and screws to be paid Each 5.99 6.05 Rupees Six and Paisa Five Only
under separate items)
Fixing metallic casement stays of size with necessary screws etc.
422 12009 12.21 complete (casement stays and screws to be Each 5.99 6.05 Rupees Six and Paisa Five Only
paid under separate items)
Fixing metallic cup board or wardrobe locks of sizes with
Rupees Ninety Four and Paisa
423 12010 12.24 necessary screws etc.complete (Locks and screws to be Each 93.96
paid separately)
Fixing metallic or plastic cupboard or handrobe knobs of sizes with
Rupees Seven and Paisa Eighty
424 12011 12.25 necessary screws/ bolts etc. complete (knobs and screws / bolts to Each 7.75
be paid separately)
Fixing metallic floor door stoppers of sizes with rubber cushion
Rupees Four and Paisa Twenty
425 12012 12.26 screws etc. to suit shutter thickeness complete (Floor door stopper Each 4.2
with rubber cushion and screws to be paid under separate items)
Fixing metallic door handles or knobs for mortice locks with
Rupees Three and Paisa Seventy
426 12013 12.28 necessary screws etc. complete (Door handles /knobs and screws Each 3.72
to be paid spearately)
Providing and fixing 3mm thick PVC sheets as signage and display
of health signs/information of required size having retro reflective
Rupees Two Hundred Seventy
letters/design as per requirement, fixing the same through
427 Rate Analysis 0 Nos 275.00 277.75 Seven and Paisa Seventy Five
approved adhesive etc. complete, work shall be carried out as per
instruction of engineer-in-charge. (Approved make PVC foamed
sheets only)(45 x 15 cms)
Fabricating, supplying and fixing in position SS railing for staircase
with brush finish and 316 grade as per Indian Standrd and detailed Rupees Three Thousand Fifty
428 Rate Analysis 0 Rmt 3029.00
drawing including grinding, cleaning and filling the welded spots Nine and Paisa Twenty Nine Only
with SS finish (Only standard measurements will be paid for).
Providing and fixing sheet glass, selected quality (Type-C) bedded
Rupees One Thousand One
in putty and fixed with wooden beading including the cost of
429 13001A 13.1 Sqm 1171.63 1183.35 Hundred Eighty Three and Paisa
wooden beadings of first class teakwood and necessary cutting of
Thirty Five Only
glass. (1) 5 mm thick.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing sheet glass, selected quality (Type-C) bedded
Rupees One Thousand Two
in putty and fixed with wooden beading including the cost of
430 13001B 13.1 Sqm 1205.5 1217.56 Hundred Seventeen and Paisa
wooden beadings of first class teakwood and necessary cutting of
glass. (2) 6 mm thick.
Providing and fixing rough cast wired glass, 6mm thick bedded in
putty and fixed with wooden beading including the cost of wooden Rupees Five Hundred Sixty Four
beadings of Indian teak wood and necessary cutting of glass. (C) and Paisa Eighty Five Only
Wired - figured glass
Providing and fixing sheet glass ordinary quality bedded in putty
Rupees One Thousand One
and fixed with wooden beadings including the cost of wooden
432 13003A 13.5 Sqm 1130.06 1141.36 Hundred Forty One and Paisa
beadings of first-class teak wood and necessary cutting of glass. (3)
Thirty Six Only
Providing and fixing sheet glass ordinary quality bedded in putty
Rupees One Thousand One
and fixed with wooden beadings including the cost of wooden
433 13003B 13.5 Sqm 1151.05 1162.56 Hundred Sixty Two and Paisa
beadings of first-class teak wood and necessary cutting of glass. (4)
Extra for using ground glass (frosted or obscured on one Rupees Thirty Eight and Paisa
side) instead of plain glass. Twenty Nine Only
Deduct for difference in cost of meterials and labour involved in
method of glazing if changed in item No. 13 (A) Front and back Rupees Four Hundred Sixty
puttied and sprigged or fixed with glazing Seven and Paisa Ninety Six Only
Grinding, Polishing and rounding of edges of glass or glazing Rupees Twenty and Paisa Eighty
sheets. Eight Only
PAVING & FLOOR FINISHES
Providing and laying 40mm thick marble chips flooring rubbed
and polished (I.E. terrazo) to granolithic finish with under layer
30mm thick cement concrete 1:2:4 (1- Cement:2-coarse sand :4-
graded stone aggregate 10 mm and down gauge) and top layer
Rupees Seven Hundred Seventy
437 14001AA 14.2 10mm thick with white, black or white and blak marble cihps of Sqm 765.21
Two and Paisa Eighty Six Only
required sizes from 1mm to 4mm nominal size laid in cement
marble powder mix 3:1 (3-Cement : 1-Marble powder by weight)
in proportion of 4:7 (4-Cement :7-marble chips by volume) (A)
Dark shade pigment with ordinary cement (In top layer only)
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying 40mm thick marble chips flooring rubbed
and polished (I.E. terrazo) to granolithic finish with under layer
30mm thick cement concrete 1:2:4 (1- Cement:2-coarse sand :4-
graded stone aggregate 10 mm and down gauge) and top layer
Rupees Nine Hundred and Paisa
438 14001BA 14.2 10mm thick with white, black or white and blak marble cihps of Sqm 891.14
required sizes from 1mm to 4mm nominal size laid in cement
marble powder mix 3:1 (3-Cement : 1-Marble powder by weight)
in proportion of 4:7 (4-Cement :7-marble chips by volume) (B)
Light shade pigment with white cement (In top layer only)
Providing and laying 40mm thick marble chips flooring rubbed
and polished (I.E. terrazo) to granolithic finish with under layer
30mm thick cement concrete 1:2:4 (1- Cement:2-coarse sand :4-
graded stone aggregate 10 mm and down gauge) and top layer
10mm thick with white, black or white and blak marble cihps of Rupees Six Hundred Thirty Seven
required sizes from 1mm to 4mm nominal size laid in cement and Paisa Fifty Four Only
marble powder mix 3:1 (3-Cement : 1-Marble powder by weight)
in proportion of 4:7 (4-Cement :7-marble chips by volume) (C)
Medium Shade pigment with approx 50% white cement and 50%
ordinary cement (In top layer only)
Providing and laying 40mm thick marble chips flooring rubbed
and polished (I.E. terrazo) to granolithic finish with under layer
30mm thick cement concrete 1:2:4 (1- Cement:2-coarse sand :4-
graded stone aggregate 10 mm and down gauge) and top layer Rupees Seven Hundred
440 14001DA 14.2 10mm thick with white, black or white and blak marble cihps of Sqm 710.33 717.43 Seventeen and Paisa Forty Three
required sizes from 1mm to 4mm nominal size laid in cement Only
marble powder mix 3:1 (3-Cement : 1-Marble powder by weight)
in proportion of 4:7 (4-Cement :7-marble chips by volume) (D)
White cement without any pigment (In top layer only)
Providing and laying 40mm thick marble chips flooring rubbed
and polished (I.E. terrazo) to granolithic finish with under layer
30mm thick cement concrete 1:2:4 (1- Cement:2-coarse sand :4-
graded stone aggregate 10 mm and down gauge) and top layer
Rupees Seven Hundred Seventy
441 14001EA 14.2 10mm thick with white, black or white and blak marble cihps of Sqm 765.21
Two and Paisa Eighty Six Only
required sizes from 1mm to 4mm nominal size laid in cement
marble powder mix 3:1 (3-Cement : 1-Marble powder by weight)
in proportion of 4:7 (4-Cement :7-marble chips by volume) (E)
Light Shade pigment with ordinary cement (In top layer only.)
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying marble chips skirting (Terrazo) or dedo
rubbed, and polished to Granolithic finish top layer 6mm thick
with white,black or white and black marble chips of size from
smallest to 4mm nominal size laid in cement marble powder mix
Rupees Five Hundred Eighty Five
442 14002AA 14.4 3:1 (3- Cement : 1 marble powder by weight) in proportion of 4:7 Sqm 579.57
and Paisa Thirty Seven Only
(4-cement marble powder mix
: 7-marble chips by volume) 20mm thick with under layer 14mm
thick cement plaster 1:3 (1-cement : 3-coarse sand)
(A) Dark shade pigment with ordinary cement (In top layer only)
Providing and laying marble chips skirting (Terrazo) or dedo
rubbed, and polished to Granolithic finish top layer 6mm
white,black or white and black marble chips of size from smallest
to 4mm nominalsize laid in cement marble powder mix 3:1 (3-
Rupees Five Hundred Eighty Five
443 14002BA 14.4 Cement : 1 marble powder by weight ) in proportion of 4:7 (4- Sqm 579.57
and Paisa Thirty Seven Only
cement marble powder mix : 7- marble chips by volume) 20mm
thick with under 14mm thick layer cement plaster 1:3 (1-cement :
(B) Light shade pigment with white cement (In top layer only)
Providing and laying marble chips skirting (Terrazo) or dedo
rubbed, and polished to Granolithic finish top layer 6mm
white,black or white and black marble chips of size from smallest
to 4mm nominalsize laid in cement marble powder mix 3:1 (3-
Rupees Six Hundred Seventy One
444 14002CA 14.4 Cement : 1 marble powder by weight) in proportion of 4:7 (4- Sqm 665.12
and Paisa Seventy Seven Only
cement marble powder mix : 7-marble chips by volume) 20mm
thick with under 14mm thick layer cement plaster 1:3 (1-cement :
3-coarse sand) (C) Medium shade pigment with appox 50% white
cement and 50% ordinary cement (In top layer only)
Providing and laying marble chips skirting (Terrazo) or dedo
rubbed, and polished to Granolithic finish top layer 6mm
white,black or white and black marble chips of size from smallest
to 4mm nominal size laid in cement marble powder mix 3:1 (3-
Rupees Six Hundred Eighty Nine
445 14002DA 14.4 Cement : 1 marble powder by weight) in proportion of 4:7 (4- Sqm 682.89
and Paisa Seventy Two Only
cement marble powder mix : 7-marble chips by volume) 20mm
thick with under 14 mm thick layer cement plaster 1:3 (1-cement :
3-coarse sand) (D) White cement without any pigment (In top
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying marble chips skirting (Terrazo) or dedo
rubbed, and polished to Granolithic finish top layer 6mm
white,black or white and black marble chips of size from smallest
to 4mm nominalsize laid in cement marble powder mix 3:1 (3- Rupees Six Hundred Twenty
Cement : 1 marble powder of 4:7 (4- cement marble powder mix : Four and Paisa Forty Nine Only
7-marble chips by volume) 20mm thick with under plaster 1:3 (1-
cement : 3-coarse sand) (E) Light shade pigment with ordinary
cement(In top layer only)
Providing and laying cushioning layer on R.C.C. Slab consisting of
75mm thick lime, concrete using brick aggregate of 20mm nominal Rupees Two Hundred Fifty Four
size mortar compresing of 1- and Paisa Thirty Six Only
Lime : 2- fine sand)
Precast terrzo tiles 22mm thick with white, Black or white and
black marble chips of sizes upto 6mm, laid in floors, treads of steps
and landings on a bed of 25mm average thickness of lime mortar Rupees Five Hundred Eighty Two
1:6 jointed with neat cement slurry mixed with pigment to match and Paisa Ten Only
the shade of tiles including rubbing and polishing complete with
precast tiles of (1) Light shades using white cement
Precast terrzo tiles 22mm thick with white Black or white and
black marble chips of sizes upto 6mm laid in floors, treads of steps
and landings on a bed of 25mm average thickness of lime mortar Rupees Five Hundred Sixty Nine
1:6 jointed with neat cement slurry mixed with pigment to match and Paisa Five Only
the shade of tiles including rubbing and polishing complete with
precast tiles of (1) Dark shades using ordinary cement
Precast terrzo tiles 27 to 28mm thick with white Black or white
and black marble chips of sizes upto 6mm laid in floors, treads of
steps and landings on a bed of 25mm average thickness of lime Rupees Six Hundred Twelve and
mortar 1:6 jointed with neat cement slurry mixed with pigment to Zero Paisa Only
match the shade of tiles including rubbing and polishing complete
with precast tiles of (1) Light shades using white cement
Precast terrzo tiles 27 to 28mm thick with white Black or white
and black marble chips of sizes upto 6mm laid in floors, treads of
steps and landings on a bed of 25mm average thickness of lime Rupees Six Hundred Twelve and
mortar 1:6 jointed with neat cement slurry mixed with pigment to Paisa Eighty Six Only
match the shade of tiles including rubbing and polishing complete
with precast tiles of (2) Dark shades using ordinary cement
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying precast terrazo tile 20mm thick white,black,
white and black (or of the colour specified in specification of
tender item) marble chips of sizes upto 6mm laid in floors, treads
of steps and landings on a bed of 25mm average thickness of Lime
Rupees Five Hundred Eighty Five
452 14004AA 14.19 mortar 1:1.5(1-Lime putty Sqm 579.57
and Paisa Thirty Seven Only
: 1.5 coarse sand) or C.M. 1:6 (1:cement :6 - coarse sand) jointed
with neat cement slurry mixed with pigment to match the shade of
tiles including rubbing and polishing complete with precast tiles
of.(A) Light shades using white cement
Providing and laying precast terrazo tile 20mm thick white and
black (or of the colour specified in specification of tender item)
marble chips of sizes upto 6mm laid in floors, treads of steps and
landings on a bed of 25mm average thickness of Lime mortar
Rupees Six Hundred Seventeen
453 14004BA 14.19 1:1.5(1-Lime putty : 1.5 sand) or Sqm 611.85
and Paisa Ninety Seven Only
C.M. 1:6 jointed with neat cement slurry mixed with pigment to
match the shade of tiles including rubbing and polishing
complete with precast tiles of.(B) Medium shades using approx.
50% white cement and 50% ordinary cement
Providing and laying precast terrazo tile 20mm thick
white,black,white and black (or of the colour specified in
specification of tender item) marble chips of sizes upto 6mm laid
in floors, treads of steps and landings on a bed of 25mm average
Rupees Five Hundred Forty Six
454 14004CA 14.19 thickness of Lime mortar 1:1.5(1-Lime putty Sqm 540.82
and Paisa Twenty Three Only
: 1.5 coarse sand) or C.M. 1:6(:1 - cement :6 - coarse sand) jointed
with neat cement slurry mixed with pigment to match the shade of
tiles including rubbing and polishing complete with precast tiles
of. (B) Dark shades using ordinary cement
Providing and laying precast terrazo tiles 20mm thick with marble
chips of sizes. upto 6mm in skirting and risers of steps not
exceedings 30 cms. in height on 10mm thick cement plaster 1:3 (1- Rupees Six Hundred Sixty Five
cement : 3-coarse sand ) jointed with neat cement slurry including and Paisa Twenty Six Only
rubbing and polishing complete with tiles of. (A) Light shades
using white cement
Providing laying precast terrazo tiles 20mm thick with marble
chips of sizes. upto 6mm in skirting and risers of steps not
exceedings 30 cms. in hieght on 10mm thick cement plaster 1:3 (1-
Rupees Seven Hundred Forty
456 14005BA 14.21 cement : 3-coarse sand ) jointed with neat cement slurry including Sqm 736.16
Three and Paisa Fifty Two Only
rubbing and polishing complete with tiles of. (B) Medium Shades
50% white Cement and 50% ordinary cement
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying precast terrazo tiles 20mm thick with marble
chips of sizes. upto 6mm in skirting and risers of steps not
exceedings 30 cms. in height on 10mm thick cement plaster 1:3 (1-
Rupees Six Hundred Thirty Five
457 14005CA 14.21 cement : 3-coarse sand ) jointed with neat cement slurry including Sqm 629.61
and Paisa Ninety One Only
rubbing and polishing complete with tiles of. (B) Dark shades using
Providing and laying chequered terrazo tiles 22mm thick with
marble chips of sizes upto 6mm in floors on 25mm thick bed of
Lime mortar 1:1.5 (1-Lime putty : 1.5 coarse sand) or C.M. 1:6 (1 - Rupees Seven Hundred Sixty
cement :6 - coarse sand) jointed with neat cement slurry mixed Nine and Paisa Sixty One Only
with pigment to match the shade of the tiles including rubbing and
polishing complete. (A) Light shades using white cement
Providing and laying chequered terrazo tiles 22mm thick with
marble chips of sizes upto 6mm in floors on 25mm thick bed of
Lime mortar 1:1.5 (1-Lime putty : 1.5 coarse sand) or C.M. 1:6 (1 - Rupees Seven Hundred Fifty One
cement : 6 - coarse sand) jointed with neat cement slurry mixed and Paisa Sixty Seven Only
with pigment to match the shade of the tiles including rubbing and
polishing complete. (B) Dark shades using ordinary cement
Providing and laying chequered terrazo tiles 28mm thick with
marble chips of sizes upto 6mm in treads of stairs and staircases in
12mm thick bed of lime mortar 1:1.5 (1-Lime putty :1.5 coarse
Rupees Seven Hundred Forty Six
460 14007AA 14.27 sand) or C.M. 1:6 (1- cement : 6- coarse sand) jointed with neat Sqm 739.38
and Paisa Seventy Seven Only
cement slurry mixed with pigment to match the shade of tiles
including rubbing and polishing complete. (A) Light shades using
Providing and laying chequered terrazo tiles 28mm thick with
marble chips of sizes upto 6mm in treads of stairs and staircases in
12mm thick bed of lime mortar 1:1.5 (1-Lime putty :1.5 coarse Rupees Seven Hundred Fifty
sand) or C.M. 1:6 jointed with neat cement slurry mixed with Eight and Paisa Twenty Only
pigment to match the shade of tiles including rubbing and
polishing complete. (B) Dark shades using ordinary cement
Providing and laying white glazed tiles 6mm thick in flooring
treads of steps and landing laid on a bed of 12mm thick cement Rupees Nine Hundred Thirty
mortar 1:3 (1-cement : 3-coarse sand ) Nine and Paisa Eighteen Only
finishing with flush pointing in white cement.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying Ceramic tiles 6mm thick in flooring treads of
steps and landing laid on a bed of 12mm thick cement mortar 1:3 Rupees Nine Hundred Eighty One
(1-cement : 3-coarse sand ) finishing and Paisa Fifty Seven Only
with flush pointing in white cement.
Providing and laying Vitrified tiles 8 to 10 mm thick , 24'' x 24'' in
flooring treads of steps and landing laid on a bed of 12mm thick Rupees One Thousand Ninety
cement mortar 1:3 (1-cement : 3-coarse sand ) finishing with flush Nine and Paisa Ninety Five Only
pointing in white cement.
Providing and laying Vitrified tiles 8 to 10 mm thick , 36'' x 36'' in
Rupees One Thousand Five
flooring treads of steps and landing laid on a bed of 12mm thick
465 14008DA 14.29 (C2) Sqm 1506.66 1521.73 Hundred Twenty One and Paisa
cement mortar 1:3 (1-cement : 3-coarse sand ) finishing with flush
Seventy Three Only
pointing in white cement.
Providing and laying white glazed tiles 6mm thick in skrting risers
of steps and dedo on 10mm thick cement plaster 1:3 (1-cement : 3- Rupees Nine Hundred Seventy
coarse sand) and jointed with white cement and Paisa Seventeen Only
Providing and layingCeramic tiles 6mm thick in skrting risers of
steps and dedo on 10mm thick cement plaster 1:3 (1-cement : 3- Rupees One Thousand Twenty
coarse sand) and jointed with white cement and Paisa Seventy One Only
Providing and laying Vitrified tiles 8 to 10 mm thick , 24'' x 24'' in
Rupees One Thousand One
skrting risers of steps and dedo on 10mm thick cement plaster 1:3
468 14009CA 14.32 (C1) Sqm 1158.4 1169.98 Hundred Sixty Nine and Paisa
(1-cement : 3-coarse sand) and jointed
Ninety Eight Only
with white cement slurry
Providing and laying Vitrified tiles 8 to 10 mm thick , in skrting
Rupees One Thousand Five
risers of steps and dedo on 10mm thick cement plaster 1:3 (1-
469 14009DA 14.32 (C2) Sqm 1561.7 1577.32 Hundred Seventy Seven and
cement : 3-coarse sand) and jointed with
Paisa Thirty Two Only
white cement slurry
Providing and fixing 50mm internal or external angles of Rupees One Hundred Eighteen
glazed tiles and Paisa Seventy Seven Only
Providing and laying marble stone slab flooring over 20mm
(average)base of cement mortar 1:6 (1-cement : 6 coarse sand) or Rupees Two Thousand One
471 14011A 14.36 L.M. 1:1.5(1- lime putty : 1.5 - coarse sand) laid and jointed with Sqm 2166.49 2188.15 Hundred Eighty Eight and Paisa
gray cement slurry including rubbing and polishing complete. (A) Fifteen Only
Marble slab 25mm thick
Providing and laying polished Kota stone slab flooring over 20mm
(Average) thick base of cement mortar 1:6 (1- cement : 6-coarse
sand) or L.M. 1.1.5 (1-Lime putty :1.5 - coarse sand) laid over and Rupees One Thousand One and
jointed with grey cement slurry mixed with pigment to match the Paisa Fourteen Only
shade of slab including rubbing and polishing etc. complete. (A)
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying polished Kota stone slab flooring over 20mm
(Average) thick base of cement mortar 1:6 (1- cement : 6-coarse Rupees One Thousand Sixty Nine
sand) or L.M. 1.1.5 laid over and jointed with grey cement slurry and Paisa Sixty Two Only
including rubbing and polishing etc. complete. (B) 30 mm thick
Providing and laying polished kota stone slab 25mm thick in risers
of steps,skirting Dedo and pillars laid on 10mm thick cement Rupees One Thousand One
474 14013A 14.44 mortar 1:3 (1-Cement : 3 coarse sand) and jointed with gray Sqm 1138.14 1149.52 Hundred Forty Nine and Paisa
cement slury mixed with pigment to match the shade of slab Fifty Two Only
including rubbing and polishing etc. complete.
Providing and laying rough chiseled dressed stone flooring over
20mm average thick base of cement mortar 1:5 (1- Cement : 5-
Rupees Five Hundred Sixty Three
475 14014AA 14.46 coarse sand) or L.M. 1:1.5 (1-Lime putty : 1.5 - coarse sand) Sqm 557.63
and Paisa Twenty One Only
including pointing with cement mortar 1:2 (1- cement : 2-stone
dust) etc. complete. (A) 25mm thick
Providing and laying rough chiseled dressed stone flooring over
20mm thick base of cement mortar 1:5 (1-Cement : 5- coarse sand)
Rupees Six Hundred Thirty One
476 14014BA 14.46 or L.M. 1:1.5 including pointing with cement mortar 1:2 (1-cement Sqm 625.4
and Paisa Sixty Five Only
: 2-stone dust) etc. complete. (B)
Providing and laying cement concrete flooring 1:2:4 (1- cement : 2-
coarse sand : 4-graded stone aggregate 20mm nominal size) laid in Rupees Two Hundred Ninety
one layer and finished with a floating coat of neat cement. (A) and Paisa Twenty Three Only
Providing and laying cement concrete flooring 1:2:4 (1- cement : 2-
coarse sand : 4-graded stone aggregate 20mm nominal size) laid in Rupees Three Hundred Thirty
one layer and finished with a floating coat of neat cement. (B) Nine and Paisa Fifteen Only
Providing and laying cement concrete pavement (25mm to 50mm
Rupees Four Thousand Four
thick) with 1:2:4 (1-cement : 2-coarse sand : 4-stone aggregate
479 14016A 14.74 cu.m 4373.78 4417.52 Hundred Seventeen and Paisa
20mm nominal size) including finishing with floating coat of neat
cement complete.
Providing and laying precast cement concrete tiles 20mm thick
with aggregate of sizes upto 6mm laid on floors, treads of steps
and landing on 20mm thick bed of cement mortar 1:6 (1-cement :
Rupees Five Hundred Seven and
480 14017A 14.81 6-coarse sand) or L.M. 1:1.5 (1 - Lime putty : 1.5 - coarse sand) Sqm 502.08
jointed with neat cement slurry with pigment to match the shade
of tiles complete with precast tiles of (C) Dark shades using
ordinary cement
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and laying chequered precast cement concrete tiles
22mm thick with aggegate of sizes upto 6mm in floors, treads of
Rupees Five Hundred Forty One
481 14018AA 14.86 steps and landings on 20mm thick bed of C.M. 1:6 (1-cement : 6- Sqm 535.85
and Paisa Twenty One Only
sand) or L.M. 1:1.5(1-Lime putty : 1.5 coarse sand) joint with neat
cement slurry with pigments to match the shade of the tiles.
Extra for rubbing & polishing the precast c.c. tiles for Rupees One Hundred Fifty One
flooring sketing deta. and Paisa Thirty One Only
Providing and laying brick on edge flooring laid dry grouted with
Rupees Five Hundred Seventy
483 14019A 14.9 c.M. 1:6 (1 - Cement : 6 - coarse sand) including finishing the joints Sqm 565.66
One and Paisa Thirty Two Only
flush curing etc. complete.
P & L 24" x 24" vitrified 8 mm thick tile flooring over 20 mm
(average) base of cement mortar 1:6 ( 1 cement: 6 coarse sand) on
Rupees One Thousand Four
new surface or fixing on existing flooring by adhesive material
484 14020A 0 Sqm 1418.59 1432.78 Hundred Thirty Two and Paisa
including dismentaling of existing flooring and jointed with color
Seventy Eight Only
cement slurry including finised with flush pointing & cleaning the
surface etc. complete for DARK shade
P & L 24" x 24" vitrified 8 mm thick tile flooring over 20 mm
(average) base of cement mortar 1:6 ( 1 cement: 6 coarse sand) on
Rupees One Thousand Four
new surface or fixing on existing flooring by adhesive material
485 14021A 0 Sqm 1418.59 1432.78 Hundred Thirty Two and Paisa
including dismentaling of existing flooring and jointed with color
Seventy Eight Only
cement slurry including finised with flush pointing & cleaning the
surface etc. complete for antiskit
P & L 24" x 24" vitrified 8 mm thick tile flooring over 20 mm
(average) base of cement mortar 1:6 ( 1 cement: 6 coarse sand) on
Rupees One Thousand Four
new surface or fixing on existing flooring by adhesive material
486 14022A 0 Sqm 1436.79 1451.16 Hundred Fifty One and Paisa
including dismentaling of existing flooring and jointed with color
cement slurry including finised with flush pointing & cleaning the
surface etc. complete for light shade
Providing and fixing pre-cast concrete kerb stone of gray cement
based concrete block 30cm length,30cm height and 15cm thick of
Rupees Three Hundred Ninety
487 14023A 0 M200 grade concret as per approved design and including Rmt 390.68
Four and Paisa Fifty Nine Only
excavation for fixing in proper line and level,filling the joint with
C:M 1:3 (1cement:3fine sand) etc complete.
Providing and fixing pre-cast concrete kerb stone of gray cement
based concrete block 30cm length,30cm height and 15cm thick of
Rupees Three Hundred Seventy
488 14032 0 M250 grade concret as per approved design and including Rmt 367.01
and Paisa Sixty Eight Only
excavation for fixing in proper line and level,filling the joint with
C:M 1:3 (1cement:3fine sand) etc complete.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking
concrete block 60mm thick with grade of concrete M300 pnumatic
compressed / vibrated mechanically and as per approved design Rupees Seven Hundred Four and
Confirming to IS 15658 : 2006 including 35 mm Sand layer for Paisa Seven Only
levelling and filling the joint with sand in proper line and level as
per guidlines of IRC : SP 63-2018 etc. Complete.
Providing and laying broken chine mosaic flooring
for terrace using 12 mm to 20 mm broken pieces of glazed tiles to
be laid over cement mortar 1:3 to plain or slope and to be
Rupees Seven Hundred Sixty Five
490 14035 0 tempered to bring mortar creme out upto Sqm 758.39
and Paisa Ninety Seven Only
surface using white cement including rounding off junctions and
extending them upto 15 cm along the wall,clearing with water
and oxalic acid etc. as directed.
Providing and laying coloured glazed tiles of the size 300 mm x
200 mm x 8 mm / 300 mm x 450 mm x 8 mm in skirting, risers of Rupees One Thousand Four
491 14036 0 steps and dedo on 10 mm. thick cement plaster 1:3 (1 cement : 3 Sqm 1438.41 1452.79 Hundred Fifty Two and Paisa
coarse sand) & jointed with white Seventy Nine Only
Providing and laying coloured glazed tiles of the size 300 mm x
Rupees One Thousand Four
200 mm x 8 mm / 300 mm x 450 mm x 8 mm in skirting, risers of
492 14036 0 Sqm 1403.33 1417.36 Hundred Seventeen and Paisa
steps and dedo on 10 mm. thick cement plaster 1:3 (1 cement :
Thirty Six Only
coarse sand) & jointed with white cement slurry.
Providing and laying polished Granite stone slab 25mm thick in
flooring,risers of steps, skirting Dedo and pillars laid on 20mm Rupees Two Thousand One
493 Rate Analysis 0 thick cement mortar 1:3 (1-Cement : 3 coarse sand) and jointed Sqm 2101.78 2122.80 Hundred Twenty Two and Paisa
with gray cement slury including rubbing and polishing etc. Eighty Only
complete. as per instructions of EIC.
Providing and laying polished Green Marble stone 18mm thick in
Door Frame, Window Jambs laid on 10mm thick cement mortar
Rupees One Thousand Five
1:3 ( 1 cement : 3 coarse sand ) and jointed with grey cement
494 Rate Analysis 0 Sqm 1506.00 1521.06 Hundred Twenty One and Paisa
slurry with matching pigment incl. rubbing and polishing etc
complete colour and shed as approved by achitect and engineer in
Providing and laying machine cut free edges machine polished
Kota stone for shelves in cupboard and walls in single piece
Rupees Eight Hundred Twenty
495 Rate Analysis 0 (Miximum 150) 25 mm including cutting grooves in walls and Sqm 816.73
Four and Paisa Ninety Only
fixing the stone with neat cement slurry in true line and level as
directed . etc. complete. for Shelves
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing 0.75meterwide and 0.80Meter hight sand
which type platform including supplying and fixing granite stone
Rupees Five Thousand Three
18 mm thick mirror polished stones in top and side position and
496 Rate Analysis 0 Sqm 5265.66 5318.31 Hundred Eighteen and Paisa
vertical strip at front over 25 mm thick polished kotah stone
Thirty One Only
platform fixing in top and sides and intermediates supports fixing
with cement mortar and adhesive and finishing etc complete.
Providing Water proofing treatment of using ZAYCOSIL water
proofing chemical on old flooring, proper cleaning of slab surface is Rupees Three Hundred Fifteen
497 SOR ANAND 0 Sqm 312.00
done after that one coat of zaycosil is done after proper curing of and Paisa Twelve Only
that coat one coat of zaycoat is apply of old flooring on terrace.
Provinding and laying Dr.Fixit water proofing treatment on terrace
including cleaning, washing and drying crack or terrace area upto
20. mtr height. Grooving in cracks 5mm wide depth and clean
proper then apply Dr.Fixit crack-x- paste for filling cracks and dry
Rupees Five Hundred Eighty Five
498 Rate Analysis 0 upto 4 to6 hour. Then prime the surface with Dr. Fixit primeseal Sqm 579.75
and Paisa Fifty Five Only
diluted with potable water by volume in 2:1 ratio(2 part primer
and 1 part water ) and alloe it to dry for 2 to 3 hours. and finally
apply Dr.Fixit new coat in three layer.All three layer should be in
three different colour for proper thickness.
Providing and laying chaina mosic water proofing treatment on
terrace including applying neat cement slurry 2.75 Kg./Sqm. Of
cement admixed with water proofing compound after cleaning the
surface (b) laying cement concrete usig brick bats 25 to 100 mm
size with 50% C.M. 1:5 (1 cement : 5 coarse sand) admixed with Rupees Nine Hundred Thirty
499 Rate Analysis 0 water proofing compound over 20 mm thick layer of C.M. 1:5 to Sqm 928.00 937.28 Seven and Paisa Twenty Eight
required slope including rounding of junction of walls and slabs (a) Only
after two days of proper curing applying a second with 20 mm
thick C.M. 1:4 and china mosaic tiling and finally finishing the
surface with trowel white cement slurry (e) after finishing the
whole terrace shall be flooded with wateweeks.
Providing & Fixing 0.9 m L X 0.6 m W & 6 mm Thick plate Of Rupees Four Thousand Six
500 Rate Analysis 0 Acrelic Set for inaugral Purpose including Finishing & engraving Nos 4569.00 4614.69 Hundred Fourteen and Paisa
Letters Etc. Complete as directed By engineer -in -charge. Sixty Nine Only
Providing & Fixing 1.2 m X 0.9 m X 0.025 m Thick plate Of Granite Rupees Six Thousand One
501 Rate Analysis 0 Stone Set in C.M. 1:4 including Finishing & engraving Letters Etc. Nos 6111.11 6172.22 Hundred Seventy Two and Paisa
Complete as directed By engineer -in -charge. Twenty Two Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing corrugated G.I. sheet of class-3 roofing fixed with
glavanished iron J or L Hooks, Bolts and nuts 8mm diameter with
Rupees Seven Hundred Thirty
502 15001A 15.1 bitumen and G.I. limpet washer or G.I. limpet washer. filled with Sqm 726.92
Four and Paisa Nineteen Only
white lead complete excluding the cost of purlins, Rafters and
Trusses.(1) 0.80 mm thick sheet.
Providing ridges or hips 600 mm overall in plain G.I. sheet class-3
fixed with G.I.J. or L Hooks and nuts 8mm dia G.I. Limpet and Rupees Six Hundred Fifty Seven
bitumen washer complete. (1) 0.80 mm thick and Paisa Ninety Eight Only
Providing valleys 900mm overall in plain 1.6mm thick G.I. sheet
fixed with G.I. J or L Hooks, Bolts and nuts glavanised iron J or L Rupees One Thousand Seventy
Hooks Bolts and nuts 8mm dia G.I. Limpet and bitumen washers Eight and Paisa Forty Six Only
Providing and fixing 150mm wide 450mm over all semicircular
plain G.I.sheet class-3 gutter with Iron brackets 40mm x 3mm size
Rupees Five Hundred Seventy
505 15005A 15.1 Bolts, Nuts, washers etc. including making necessary connection Sqm 569.6
Five and Paisa Thirty Only
with rain water
pipes. (i) 0.80 mm thick Sheet.
Filling cement concrete 1:2:4 (1- Cement :2-coarse sand :4- graded
Rupees Twenty Three and Paisa
506 15007 15.26 stone aggregate 12.5 mm nominal size) in gaps of Rmt 23.39
A.C. sheet corrugation and wings of ridges.
Providing and fixing tiles roofing with manglore tiles Rupees Two Hundred Sixty
including teak reepers of sizes 50mm x 25mm. Seven and Paisa Forty One Only
Providing and fixing five courses water profing treatment with
bitumen felt consisting of second and fourth course of blown /
bitumen or/ and residual bitumen applied hot at
1.2 kg.per Sq.M.of area for each course and first course with fibre
Rupees Four Hundred Eighty
508 15011A 15.75 base bitunen saturated under lay type land third course with fibre Sqm 478.33
Three and Paisa Eleven Only
base self finished felt type 2 grade 1 and fifth and final course of
stone grit 6mm and down size or pea sizes gravel spread at
Cu. Metre / Sq. metre including preparation of surface excluding
grading complete.
Providing and fixing on wall face C.I. Rain water pipe including
filling the joints with spun yarn soaked in neat cement slurry and Rupees Two Hundred Ninety
cement mortar 1:2 (1- Cement : 2-fine Three and Paisa Sixty Two Only
sand) (A) 75 mm dia.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing M.S Holder bat clamps of approved design to
C.I. or S.C.I. pipes embedded in and including cement concrete
blocks 100mm x 100mm x 100mm. size of 1:2:4 ( 1-Cement : 2- Rupees One Hundred Twenty
coarse sand :4- graded stone aggregate of 20mm nominal size ) and Paisa Sixty Five Only
and cutting holes and making good the wall etc, complete. (A)
Providing and fixing and embedding sand, C.I. rain water pipes in
the masonry surrounded with 12mm thick cement mortar of the Rupees Three Hundred Thirteen
same mix as that of masonry. (A) 75 mm dia and Paisa Eighty Four Only
Providing and fixing for wall plugs and standard holder bat clamps
comprising of two semicircular haves of flat iron and cast iron base Rupees Seventy and Paisa
screwed on wooden plugs. (B) 80 mm Seventy Seven Only
Providing and fixing for wall plugs and standard holder bat clamps
comprising of two semicircular haves of flat iron and cast iron base Rupees Eighty and Paisa Forty
screwed on wooden plugs. (C) 100 mm Only
Providing and Fixing 6 mm thick Lexan Polycarbonate multi wall
Rupees One Thousand Four
roofing sheet fixed with hilti screw and rubber silicon sealer and
514 15019 0 Sqm 1427.62 1441.90 Hundred Forty One and Paisa
alluminium strip of size 50 x 3 mm etc complete as directed by
Engineer in charge.
515 CEILING & LINING
Providing and fixing wooden planks ceiling with tounged and
grooved jointing and wood screws (frame work and cover fillings Rupees One Thousand Forty Six
to be measured and laid for separately) (A) Indian Teak wood (i) and Paisa Thirty Three Only
Providing and fixing wooden planks ceiling with tounged and
Rupees One Thousand Five
grooved jointing and wood screws (frame work and cover fillings
517 16001BA 16.3 Sqm 1511.55 1526.67 Hundred Twenty Six and Paisa
to be measured and laid for separately) (A) Indian Teak wood (ii)
Sixty Seven Only
Providing and fixing wooden planks ceiling with tounged and
Rupees One Thousand Eight
grooved jointing and wood screws (frame work and cover fillings
518 16001CA 16.3 Sqm 1815.23 1833.38 Hundred Thirty Three and Paisa
to be measured and laid for separately) (A) Indian Teak wood (iii)
Thirty Eight Only
Deduct for butt jointing in place of touged and grooved Rupees Thirty Eight and Paisa
type joint in item No.16.3 Eighty One Only
Providing and fixing fibre insulations board lining with butt
Rupees Two Hundred Seventy
520 16003A 16.4 jointing and Nails (frame worked cover fillets to be measured and Sqm 271.77
Four and Paisa Forty Nine Only
paid for separately) (i) 12mm thick
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing fibre insulations board lining with butt
Rupees Three Hundred Sixty
521 16003B 16.4 jointing and Nails (frame worked cover fillets to be measured and Sqm 359.11
Two and Paisa Seventy Only
paid for separately) (ii) 18mm thick
Providing and fixing fibre insulations board lining with butt
Rupees Four Hundred Forty
522 16003C 16.4 jointing and Nails (frame worked cover fillets to be measured and Sqm 439.17
Three and Paisa Fifty Six Only
paid for separately) (iii) 25mm thick
Providing and playwood lining with but jointed and nails (frame
Rupees Three Hundred Seven
523 16004A 16.13 work and cover fillets to be measured and paid for Sqm 304.19
and Paisa Twenty Three Only
separately) (i) 6mm thick ply.
Providing and playwood lining with but jointed and nails (frame
Rupees Four Hundred Ten and
524 16004B 16.13 work and cover fillets to be measured and paid for Sqm 406.72
Paisa Seventy Nine Only
separately) (ii) 9mm thick ply.
Providing and fixing eco-friendly light weight calcium
silicate false ceiling tiles having Tegular edge & 15 mm Thick
Densified edges on the Tile Periphery for Extra Strength The Light
weight calcium silicate ceiling tiles shall have , light reflection 85%
non-combustible as per B.S. 476 part IV, 100% humidity resistance
and also having thermal conductivity0.043° w/m KC.for the best
thermal Insulation . The Light weight calcium Silicate tile shall be
of approved texture Fine fissured/ Spintone/Cosmos having NRC
value of 0.5 & Globe having NRC value of 0.75 NRC or equivalent of
size 595 X 595 mm to be laid on true horizontal level suspended
inter locking metal grid of hot dipped galvanized steel sections
(galvanizing @120 grams per sqm including both side) consisting Rupees One Thousand Six
525 16006 0 of main ‘T’ runner suitably spaced at joints to get required length Sqm 1657.57 1674.15 Hundred Seventy Four and Paisa
and size of 24X38mm made from 0.30 mm thick (minimum) sheet, Fifteen Only
1200mm centre to centre, and cross ‘T’ of size 24X28mm made out
of 0.33mm (Minimum) sheet spaced 1200mm along spaced
between main ‘T’ at 600mm centre to centre to form agrid of
1200X600mm and secondary cross ’T’ of length 600mm and size
24x28mm made of 0.30 mm thick (Minimum) sheet to be
interlocked at middle of the 1200X600mm panel to form grid of
size 600X600mm resting on periphery walls/partitions on a
perimeter wall angle pre-coated steel of size (24X24X3000mm
made of 0.40mm thick (minimum) sheet with the help of rawl
plugs at 450mm centre to centre with 25mm long dry wall screws
@ 230mm interval and laying 15mm thick Densified edges
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Pro. And fixing single layer water proof gypsum board 12.5 mm
thick sections using water proof board of size 1220 mm x 1830 mm
x 8.0 mm suspended by GI suspender channel of size 25 mm x
mm with intermediate channel og size 18 mm x 40 mm x 0.8 mm at
1220 mm center to center ceiling section of size 40 mm x 35 mm x
Rupees Six Hundred Six and
526 16007 0 0.55 mm at 457 mm c/c and perimeter channel A of size 20 mm x Sqm 600.94
Paisa Ninety Five Only
0.5 mm at edges & drops incl.paper tap sand sofit cleat, anchor
fastener, scoch bolt connecting cleat,joining compound top coat on
ceiling incl.making necy.opening for light fitting,diffuser etc. comp.
as per detail drawing as directed
PLASTERING & POINTING 0.00 Zero Paisa Only
Providing 10mm thick cement plaster in single coat on
brick/concrete walls for interior plastering upto floor two level Rupees One Hundred Forty
and finished even and smooth in (i)Cement mortar 1:3 Three and Paisa Sixty Six Only
(1-cement:3-sand)
Providing 10mm thick cement plaster in single coat on
brick/concrete walls for interior plastering upto floor two level Rupees One Hundred Twenty
and finished even and smooth in (ii) Cement mortar Nine and Paisa Fourteen Only
1:4 (1-cement :4-sand)
Providing 10mm thick cement plaster in single coat on
brick/concrete walls for interior plastering upto floor two level Rupees One Hundred Fourteen
and finished even and smooth in (iii) Cement mortar and Paisa Sixty Four Only
1:6 (1-cement:6-sand)
Providing 15mm thick cement plaster in single coat on Rough
(Similar)side of single or half brick walls for interior plastering Rupees One Hundred Ninety
upto floor two level and finished even and smooth in (i) Cement Two and Paisa Forty One Only
mortar 1:3 (1-cement:3-sand)
Providing 15mm thick cement plaster in single coat on Rough
(Similar)side of single or half brick walls for interior plastering Rupees One Hundred Seventy
upto floor two level and finished even and smooth in (ii) Cement One and Paisa Twenty One Only
mortar 1:4 (1-cement :4-sand)
Providing 15mm thick cement plaster in single coat on Rough
(Similar)side of single or half brick walls for interior plastering Rupees One Hundred Forty Nine
upto floor two level and finished even and smooth in (iii) Cement and Paisa Fifty Three Only
mortar 1:6 (1-cement:6-sand)
Providing 20mm thick cement plaster in single coat on single or
half brick walls for interior plastering upto floor two level and Rupees Two Hundred Forty Six
finished even and smooth in (i) Cement and Paisa Twenty Two Only
mortar 1:3 (1-cement:3-sand)
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing 20mm thick cement plaster in single coat on single or
half brick walls for interior plastering upto floor two level and Rupees Two Hundred Eighteen
finished even and smooth in (ii) Cement and Paisa Forty Nine Only
mortar 1:4 (1-cement :4-sand)
Providing 20mm thick cement plaster in single coat on single or
half brick walls for interior plastering upto floor two level and Rupees One Hundred Eighty Nine
finished even and smooth in (iii) Cement and Paisa Fourteen Only
mortar 1:6 (1-cement:6-sand)
Extra over items 58 to 64 for finishing with a floating coat Rupees Forty Nine and Paisa
of neat cement slurry. Forty One Only
(A) Extra over items 58 to 67 for providing and mixing water Per bag of
Rupees Forty Nine and Paisa
537 17005 17.7 proofing materials in cement mortar in proportion 50Kg of 48.77
Twenty Six Only
recommended by the manufacturer. Cement
Extra over items 58 to 71 for plastering on ceilings and sofits of
Rupees Twenty Five and Paisa
538 17006 17.91 stairs upto floor two level instead of plastering on Sqm 25.18
Forty Three Only
Extra over items 1 to 69, 71 to 87 and 90 for interior plastering
Sqm x No. Rupees Twenty Three and Paisa
539 17007A 17.94 above floor two level for every additional storey 23.09
of storey Thirty Two Only
height. (1) Single coat plaster
Extra over items 1 to 69, 71 to 87 and 90 for interior plastering
Sqm x No. Rupees Twenty Six and Paisa
540 17007B 17.94 above floor two level for every additional storey 26.32
of storey Fifty Eight Only
height.(2) Two coat plaster
Extra over items 1 to 69, 71 to 87 and 90 for interior plastering
Sqm x No. Rupees Four and Paisa Seventy
541 17007C 17.94 above floor two level for every additional storey height. (3) 4.69
of storey Four Only
Floating coat of neat cement
Extra over item 91 for plastering on ceiling and soffits of stairs
Rupees Twenty One and Paisa
542 17008 17.93 above floor two level for every additional storey Sqm 21.16
Thirty Seven Only
20mm thick sand faced cement plaster on walls upto height
metres above ground level consisting of 12mm thick backing coat Rupees Three Hundred Thirty
of C.M. 1:3 (1-cement : 3-sand) and 8mm thick finishing coat of Seven and Paisa Fifty Two Only
C.M. 1:1 (1-cement : 1-sand) etc. complete.
Pointing on brickwork with cement mortar 1:3 (1-cement : Rupees Ninety Eight and Paisa
3-coarse sand) (A) Flush pointing Sixty Six Only
Pointing on brickwork with cement mortar 1:3 (1-cement : Rupees One Hundred One and
3-coarse sand) (B) Ruled pointing Paisa Fifty Nine Only
Pointing on brickwork with cement mortar 1:4 (1-cement : Rupees Ninety Four and Paisa
4-coarse sand)(A) Flush pointing Forty One Only
Pointing on brickwork with cement mortar 1:4 (1-cement : Rupees Ninety Seven and Paisa
4-coarse sand) (B) Ruled pointing Eighteen Only
Pointing on coursed stone masonry with cement mortar 1:3 (1- Rupees Ninety and Zero Paisa
cement : 3-coarse sand) (A) Flush pointing Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Pointing on coursed stone masonry with cement mortar 1:3 (1- Rupees Ninety Two and Paisa
cement : 3-coarse sand) (B) Ruled pointing Ninety Four Only
Pointing on Uncoursed stone masonry with cement mortar 1:3 (1- Rupees One Hundred Five and
cement : 3-coarse sand) (A) Flush pointing Paisa Ninety Nine Only
Pointing on Uncoursed stone masonry with cement mortar 1:3 (1- Rupees One Hundred Ten and
cement : 3-coarse sand)(B) Ruled pointing Paisa Twenty Two Only
Extra over item 17.112 to 17.151 for pointing on walls on the
Rupees Six and Paisa Seventy
552 17014 17.154 outside at height more than 10metres from ground level for every Sqm 6.63
additional height of 5 metres of part there of.
Providing cement vata (10cm. x 10 cm. size) quarter round in
Rupees Twenty Four and Paisa
553 17015 0 cement mortar 1:1 including neat cement finishing, Rmt 24.04
Twenty Eight Only
watering etc. complete.
Providing 20 mm thick double coat mala cement plaster on
interior brick / concrete work for plastering comprising of base
coat of 12 mm thick cement plaster in cement mortar (1 Cement : 4 Rupees Two Hundred Seventy
coarse sand) in rough finishing and 8 mm thick top coat of cement Seven and Paisa Eighteen Only
mortar 1:2 (1 Cement : 2 Coarse sand) finished with trovel
including scaffolding curing etc. complete.
Providing 20 mm thick cement plaster by using Ready Mix Mortar
for plaster in single coat on single or half brick walls for interior Rupees Two Hundred Fifteen
plastering upto floor two level and finished even and smooth in and Paisa Six Only
Cement mortar 1:6 (1 Cement : 6 sand)
Providing 15 mm thick cement plaster by using Ready Mix Mortar
for plaster in single coat on rough (similar) side of single or half Rupees One Hundred Sixty Three
brick walls for interior plastering upto floor two level and finished and Paisa Twenty Eight Only
even and smooth in Cement mortar 1:6 (1 Cement : 6 sand)
Providing 10 mm thick cement plaster by using Ready Mix Mortar
for plaster in single coat on brick/ concrete walls for interior Rupees One Hundred Seven and
plastering upto floor two level and finished even and smooth in Paisa Sixty Five Only
Cement mortar 1:6 (1 Cement : 6 sand)
Providing 20 mm thick cement plaster by using Ready Mix Mortar
Rupees Two Hundred Thirty
for plaster in single coat on single or half brick walls for interior
558 17021 0 Sqm 231.66 233.98 Three and Paisa Ninety Eight
plastering upto floor two level and finished even and smooth in
Cement mortar 1:4 (1 Cement : 4 sand)
Providing 15 mm thick cement plaster by using Ready Mix Mortar
for plaster in single coat on rough (similar) side of single or half Rupees One Hundred Seventy
brick walls for interior plastering upto floor two level and finished One and Paisa Eighty Four Only
even and smooth in Cement mortar 1:4 (1 Cement : 4 sand)
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing 10 mm thick cement plaster by using Ready Mix Mortar
for plaster in single coat on brick/ concrete walls for interior Rupees One Hundred Seventeen
plastering upto floor two level and finished even and smooth in and Paisa Eleven Only
Cement mortar 1:4 (1 Cement : 4 sand)
Providing 20 mm thick cement plaster by using Ready Mix Mortar
for plaster in single coat on single or half brick walls for interior Rupees Two Hundred Fifty One
plastering upto floor two level and finished even and smooth in and Paisa Eight Only
Cement mortar 1:3 (1 Cement : 3 sand)
Providing 10 mm thick cement plaster by using Ready Mix Mortar
for plaster in single coat on brick/ concrete walls for interior Rupees One Hundred Twenty
plastering upto floor two level and finished even and smooth in Seven and Paisa Fifty Eight Only
Cement mortar 1:3 (1 Cement : 3 sand)
Providing 15 mm thick cement plaster by using Ready Mix Mortar
for plaster in single coat on rough (similar) side of single or half Rupees One Hundred Eighty
brick walls for interior plastering upto floor two level and finished Eight and Paisa Forty Two Only
even and smooth in Cement mortar 1:3 (1 Cement : 3 sand)
White washing with lime on wall surface (two coats) to give an
even shade including thoroughly booming the surface to remove Rupees Twelve and Paisa Thirty
all dirt, dust; mortar drops and other foreign Nine Only
White washing with lime on wall surface (one coats) to give an
even shade including thoroughly booming the surface to remove Rupees Five and Paisa Seventy
all dirt, dust; mortar drops and loose scales of lime wash and other Two Only
foreign matter.
Extra over items 11 to 12 for every subsequent coat of Rupees Five and Paisa Seventy
white washing with lime on wall surface. Two Only
Extra over item 11 for white washing with lime on ceilings Rupees One and Paisa Fifteen
and/or sloping roofs. Only
Extra over Item 2 for white washing with lime on ceilings
568 18005 18.15 Sqm 0.49 0.49 Paisa Forty Nine Only
and sloping roofs.
Extra over Item 13 for every subsequent coat of white washing
569 18006 18.16 Sqm 0.49 0.49 Paisa Forty Nine Only
with lime on ceilings and/or sloping roofs.
Colour washing with lime on wall surface (two coats ) over and
including a primary coat of white washing to give an even shade Rupees Twelve and Paisa Fifty
after through brooming the surface to remove all dirt, dust, mortar Six Only
drops and other foreigh matter.
Colour washing with lime on wall surface (one coats ) to give an
even shade including throughly brooming the surface to loose Rupees Eight and Zero Paisa
scales of lime wash and other foreign Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Extra over item 17 to 18 for every subsequent coat of Rupees Eight and Zero Paisa
colour wash with lime on wall surface Only
Extra over Item 17 for colour washing on ceilings and/or Rupees Two and Paisa Thirteen
sloping roofs. Only
Extra over items 18,19 for colour washing on ceilings and Rupees Two and Paisa Thirteen
sloping roofs. Only
Cement washing with portland cement slurry on wall surface (one
Rupees Eleven and Paisa Seventy
575 18012 18.29 coat) to give a smooth finish including thoroughly broomings the Sqm 11.62
surface to remove all dirt, mortar drops and other foreign Brand.
Extra over Item No. 29 for every subseqent coat of cement Rupees Eleven and Paisa Seventy
washing with port land cement slurry Four Only
Removing dry or oil bound distemper by a washing and scraping
Rupees Eleven and Paisa Twenty
577 18014 18.33 and sand papering the wall surface smooth including necessary Sqm 11.15
repairs to scratches complete.
Extra over item 33 for removing dry oil bound distemper on Rupees One and Paisa Sixty Four
ceilings and sloping roofs. Only
Distempering with dry distemper of approved brand and
manufacture (two coats) and of required shade on wall surfaces of
given an even shade, over and including a priming coat of whiting Rupees Forty Eight and Paisa
after thoroughly brooming the surface free from mortar dropping Twenty Seven Only
and other foreign
Distempering with dry distemper of approved brand and
manufacture (One coats) and of required shade on wall surfaces of
Rupees Fifteen and Paisa Sixty
580 18017 18.39 given an even shade, after thoroughly brushing the surface clean of Sqm 15.5
all grease, dirt, loose pieces of scales including preparing the
surface even and sand papered smooth.
Extra over Items No. 38 and 39 of every subsequent coat at
Rupees Fourteen and Paisa Sixty
581 18018 18.4 distempering with dry distemper of approved brand and Sqm 14.53
Extra over item 38 for distemepring with dry distemper on Rupees Six and Paisa Fifty Two
ceilings and slopings roofs. Only
Extra over item 39,40 for distempering with dry distemper Rupees One and Paisa Sixty Four
on ceilings and slooping roofs. Only
Distempeing (Two coats) with oil bound distemper of approved
brand and manufacture and of required shade on wall surfaces to
give an even shade, over and including a priming coat with
Rupees Seventy Three and Paisa
584 18021 18.44 distemper primer of approved brand and manufacture after Sqm 72.97
thoroughly brushing the surface free from mortar dropping and
other foreign matter and also including preparing the surface even
and sand papered smooth.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Distempeing (Two coats) with oil bound washable distemper of
approved brand and manufacture and of required shade on wall
surfaces to give an even shade, over and including a priming coat Rupees Seventy Three and Paisa
with alkali resistance primer of approved brand after thoroughly Seventy Only
brushing the surface and other foreign matter and also including
preparing the surface even and sand parpered smooth.
Distempeing (One coats) with oil bound washable distemper of
approved brand and of required shade on wall surfaces to give an
even shade, after thorouhly brushing the surface clean of all grease Rupees Twenty Eight and Paisa
dirt, loose pieces of scales and also including distempering with Five Only
oil bound washable distemper of preparing the surface even and
Extra over Item 44 to 46 for every subsequent coat of Rupees Thirty and Paisa Fifty
approved brand and manufacture. Only
Extra over Item 44,45 for distempering with oil bound washable Rupees Eight and Paisa Sixteen
distemper on celling and sloping roofs. Only
Extra over Item 46,47 for every subsequent coat of Rupees Three and Paisa Twenty
distempering on celling and sloping roofs. Six Only
Finishing wall with water proofing cement paint of on wall
surfaces (Two coats) to give an approved brand and manufacture Rupees Fifty Nine and Paisa Fifty
and of required shape even shade after thoroughly brushing the Three Only
surface to remove all dirt and remains of loose powered materials.
Extra over Item 51 for every subsequent coat of water proofing
Rupees Thirty Two and Paisa
591 18028 18.53 cement paint of approved brand and Sqm 31.97
Twenty Nine Only
Extra over item 51 for finishing with cement paint on ceiling Rupees Six and Paisa Fifty Two
and sloping roofs. Only
Extra over item 53 for every subsequent coat of finishing with Rupees Three and Paisa Twenty
cement paint on ceiling and sloping roofs. Six Only
Wall painting (two coats) with plastic emulsion paint of approved
brand and manufacture on undecorated wall surface to give an
Rupees Eighty and Paisa Eighty
594 18031 18.57 even shade including throughly brushing the surface free from Sqm 80.07
mortar droppings and other foreign matter and sand papered
Extra over item 57 for every subsequent coat of wall painting with Rupees Forty One and Paisa Fifty
plastic emulsion pain of approved brand. Three Only
Extra over item 57 for painting with plastic emulsion paint of Rupees Five and Paisa Thirty
approved brand on ceilings and sloping roofs. Nine Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Extra over item 59 for every subsequent coat of painting with Rupees Two and Paisa Thirteen
plastic emulsion paint on ceiling and slopping roofs. Only
Applying priming coat over new steel and other metel surface after
and including preparing the surface by throughly cleaning,
oil,grease, dirt and other foreign matter and scoured with brushes Rupees Thirty Five and Paisa
fine steel wood, scrapers and sand paper with ready mixed Seventy One Only
priming paint brushing red
Painting two coats (excluding priming coat) on new steel and other
metal surface with enamel paint, brushing, interior to give an even Rupees Ninety and Zero Paisa
shade including cleaning the surface an even shade including Only
cleanicn the surface of all dirt, dust and other foreign matter.
Painting one coats (excluding priming coat) on previously painted
steel and other metal surface with enamel paint, brushing to give Rupees Fifty Six and Paisa Fifty
an even shade including cleaning the surface of all dirt, dust and Nine Only
other foreign matter.
Rupees Fifty Five and Paisa
601 19004 19.15 Extra over item 7 and 11 for every subsequent coat of paint Sqm 55.34
Eighty Nine Only
Painting two coats (excluding priming coat) on new steel and other
metal surface with synthetic enamel paint, brushing to give an Rupees Sixty Six and Paisa Ninety
even shade including cleaning the surface of all dirt, dust and Four Only
other foreign matter.
Painting one coats (excluding priming coat) on previously printed
steel and other metal surface with synthetic enamel paint,
Rupees Forty Five and Paisa One
603 19006 19.21 brushing to give an even shade including cleaning the surface of all Sqm 44.56
dirt, dust and other foreign
Extra over item 19 and 21 for every subsequent coat of Rupees Fifty Two and Paisa
paint. Twenty One Only
Painting two coats (excluding priming coat) on external surface of
new rain water, soil, waste and vent pipes and fittings with ready
Rupees Twenty One and Paisa
605 19008B 19.5 mixed bituminous brushing, black, anticorrosive to give an even Sqm 21.64
Eighty Six Only
shade including cleaning of all dirt, dust and other foreign matter.
Painting two coats (excluding priming coat) on external surface of
new rain water, soil, waste and vent pipes and fittings with ready
Rupees Twenty Seven and Paisa
606 19008C 19.5 mixed bituminous brushing, black, anticorrosive to give an even Sqm 26.8
shade including cleaning of all dirt, dust and other foreign matter.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Appliying priming coat over new wood and wood based surface
after and including preparing the surface by throughly cleaning oil,
Rupees Forty Two and Paisa
607 19009B 19.59 grease, dirt and other foreign matter, sand papering and knotting. Sqm 41.66
(B) Ready mixed paint
brushing wood primier pink.
Appliying priming coat over new wood and wood based surface
after and including preparing the surface by throughly cleaning oil,
Rupees Forty Two and Paisa
608 19009C 19.59 grease, dirt and other foreign matter, sand papering and knotting. Sqm 41.66
(C) Ready mixed paint
brushing priming for enamel
Extra over item 59 for every subsequent coat of priming coat. (B) Rupees Forty Two and Paisa
Ready mixed paint brushing wood primier pink. Eleven Only
Extra over item 59 for every subsequent coat of priming coat. (C) Rupees Forty Two and Paisa
Ready mixed paint brushing priming for enamel Eleven Only
Painting two coats (excluding priming coat) on new wood and
wood based surface with enamel paint, interior to give an even
Rupees Ninety and Zero Paisa
611 19011 19.71 shade including cleaning the surface of all dirt, dust and other Sqm 89.11
foreign matter sand papering and
Painting one coats (excluding priming coat) on previously painted
wood and wood based surface with enamel paint, to give an even Rupees Fifty Eight and Paisa
shade including cleaning the of all dirt, dust and other foreign Four Only
Extra over item 71 and 73 for every subsequent coat of Rupees Fifty Five and Paisa
paint. Eighty Nine Only
Painting two coats (excluding priming coat) on new wood and
wood based surface with ready mixed paint, brushing, oil, gloss,
Rupees One Hundred Seven and
614 19014 19.77 semi gloss to give and even shade including cleaning of all dust, Sqm 106.88
Paisa Ninety Five Only
dirt and other foreign matter
sand papering and stopping.
Varnishing two coats (excluding priming coat) on new wood and
wood based surface under coating with flatting varnish and
Rupees Fifty Eight and Paisa
615 19015 19.84 finished coat with varnish to give an even surface including Sqm 57.47
cleaning the surface of all dirt, dust and sand papering so as to
produce a smooth dry surface.
Rupees Thirty One and Paisa
616 19016 19.86 Extra over item 84 for every subsequent coat of varnish. Sqm 31.45
Seventy Six Only
Polishing with french polish on new wood and wood based surface
Rupees One Hundred Thirty
617 19017 19.87 to give an even surface including cleaning, the surface of all dirt, Sqm 136.58
Seven and Paisa Ninety Five Only
dust and sand papering smooth and including a coat of wood filler.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Polishing with french polish on previously polished wood and
wood based surface to give an even surface including cleaning, the Rupees Seventy One and Paisa
surface of all dirt, dust and sand papered smooth and including a Nine Only
coat of wood filler.
Appliying wax polish on new wood and wood surface with bees
wax polish in proportion of 2:1.5 :1:0.5 (2-Bees wax : Rupees Sixty Six and Paisa
1.5 Linseed oil : 1- Turpentine even surface including Seventy Only
cleaning the surface of all dirt dust and sand papered smooth.
Appliying wax polish on previously wax polished wood and wood
based surface with bees wax polish in proportion of 2:1.5 :1:0.5 (2-
Bees wax : 1.5 Linseed oil : 1- Turpentine : Rupees Thirty Seven and Paisa
0.5 varnish by weight to give an even surface including cleaning Sixty Seven Only
the surface of all dirt dust and sand papered
Coat tarring two coats on new wood and wood based surfaces
using 0.16 and 0.12 Litres of coal tar par Sq.M. in the first and Rupees Thirty Five and Paisa
second coat respectively to give an even shade including cleaning Thirty Nine Only
of all dirt, dust and other foreign matter.
Rupees Twenty Three and Paisa
622 19022 19.1 Extra over item 19.98 or every subsequent coat of painth Sqm 23.25
Forty Eight Only
Writing letter or figures on any surface with black japan paint
(stops,comas, hyphens and the like not to be measured and paid Per Letter Rupees Three and Paisa Twenty
for separately)(i) Block (Letters/Figures) Per Cm/Ht. Six Only
(Per 10 Letter pet CM.HT)
Writing letter or figures on any surface with black japan paint
(stops,comas, hyphens and the like not to be measured and paid Per Letter Rupees Three and Paisa Forty
for separately) (ii) Indian Per Cm/Ht. Three Only
(Letters/Figures)
Extra over items 19.119 for using thick white paint instead of black Per Letter
625 19024A 19.121 0.07 0.07 Paisa Seven Only
japan paint. (i) Block (Letters/Figures) Per Cm/Ht.
Extra over items 19.119 for using thick white paint instead of black Per Letter
626 19024B 19.121 0.07 0.07 Paisa Seven Only
japan paint. (ii) Indian (Letters/Figures) Per Cm/Ht.
Painting lines, deashes, arrows, letters etc on roads, Air fields and
like in two coats with road marking paint, brushing including Rupees One Hundred Twenty Six
cleaning the surface of all dirt, dust and other foreign matter. (i) and Paisa Twenty One Only
Over 10cm in width
Painting lines, deashes, arrows, letters etc on roads, Air fields and
like in two coats with road marking paint, brushing including Rupees Thirteen and Paisa Thirty
cleaning the surface of all dirt, dust and other foreign matter. (ii) Seven Only
Upto 10 cm in width
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Painting lines, deashes, arrows, letters etc on roads, Air fields and
like in one coats with road marking paint, brushing including Rupees Fifty Six and Paisa Fifty
cleaning the surface of all dirt, dust and other foreign matter. (i) Nine Only
Over 10cm in width
Painting lines, deashes, arrows, letters etc on roads, Air fields and
like in one coats with road marking paint, brushing including
630 19026B 19.127 Sqm 5.99 6.05 Rupees Six and Paisa Five Only
cleaning the surface of all dirt, dust and other foreign matter. (ii)
Upto 10 cm in width
Finishing wall with weather proof exterior emulsion paint on wall
surface (two coats) to give an required shape even shade after Rupees One Hundred Seventeen
thoroughly brushing the surface to remove all dirt, and remains of and Paisa Forty Only
loose powdered materials.etc complete
Applying two coats of putty & two coats of primer of approved
brand and manufacture on new wall surface to give an even shade
Rupees Forty and Paisa Fifty
632 19032 0 including thoroughly brushing the surface free from mortar sqm 40.19
dropping and other foreign
matter and sand papered smooth.
Rupees Five Hundred Twenty
Demolition and disposal of unserviceable materials with all
633 20001A 20.1 cu.m 523.06 528.29 Eight and Paisa Twenty Nine
lead and lift.(i) Lime concrete.
Demolition and disposal of unserviceable materials with all Rupees Six Hundred Eight and
lead and lift.(i) Lime concrete. Paisa Nineteen Only
Demolition including stacking of serviceable materilas and
Rupees One Thousand Fifty Six
635 20002 20.3 disposal of unserviceable materials with all lead and lift. (i) cu.m 1046.12
and Paisa Fifty Eight Only
Demolition of Brick work and stone masonry including stacking of
serviceable materilas and disposal of unserviceable materials with Rupees Three Hundred Sixty Five
all lead and lift. (i) In Lime and Paisa Twenty Four Only
Demolition of Brick work and stone masonry including stacking of
serviceable materilas and disposal of unserviceable materials with Rupees Five Hundred Forty Nine
all lead and lift.(ii) In Cement and Paisa Forty Nine Only
Demolition of terrace including stacking of serviceable materilas
Rupees Sixty Three and Paisa
638 20004 20.21 and disposal of unserviceable materials with all Sqm 63.13
Seventy Six Only
lead and lift.(i) Brick tile covering.
Dismentaling tiled of stone floors laid in mortar including stacking
Rupees Forty Seven and Paisa
639 20005 20.23 of serviceable materilas and disposal of unserviceable materials Sqm 47.47
Ninety Four Only
with all lead and lift.
Dismentaling of wooden floors including stacking of serviceable
Rupees Seventy One and Paisa
640 20006 20.25 materilas and disposal of unserviceable Sqm 71.03
Seventy Four Only
materials with all lead and lift.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Dismentaling of sheet roofing including ridges, Hips, Valleys,
Gutters etc. stacking of serviceable materilas and disposal of Rupees Forty Seven and Paisa
unserviceable materials with all lead and lift.(i) Ninety Four Only
G.I.sheet roofing.
Dismentaling of sheet roofing including ridges, Hips, Valleys,
Gutters etc. stacking of serviceable materilas and disposal of Rupees Fifty Three and Paisa
unserviceable materials with all lead and lift.(ii) Thirty Three Only
A.C. sheet roofing.
Dismentalings manglore of country tile roofing with battens
boarding etc. including stacking of serviceable materilas and Rupees Eighty Seven and Paisa
disposal of unserviceable materials with all lead and lift.(ii) A.C. Forty Only
Dismentling wood work, wrought framed and fixed in frames Rupees One Thousand Seven
644 20010 20.35 trusses including stacking the materials with all cu.m 1737.07 1754.44 Hundred Fifty Four and Paisa
lead and lift. Forty Four Only
Dismentling expanded metal or I.R.C Fabric with necessary battens
Rupees Fifty Five and Paisa
645 20011 20.39 and beadings including frame work, and stacking the serviceable Sqm 55.22
Seventy Seven Only
materials with all lead and lift.
Dismentling steel work including distempering and stacking Rupees Three and Paisa Seventy
the materials with all lead and lift. Six Only
Dismentling doors, windows, ventilators etc. (wood or steel)
shutters including chowkhats architraves, holdfasts and other Rupees One Hundred Eighty
attachment etc. complete and stacking them within all lead and Seven and Paisa Fifty Two Only
lift.(i) Not exceeding 3 Sq.M. in area.
Dismentling doors, windows, ventilators etc. (wood or steel)
shutters including chowkhats architraves, holdfasts and other Rupees Two Hundred Fifty One
attachment etc. complete and stacking them within all lead and and Paisa Ten Only
lift.(ii) Exceeding 3 Sq.M. in area.
Dismentling barbed wire in fencing including making rolls and also
including dismentling fencing posts including all earth work
Rupees Sixty Six and Paisa Fifty
649 20014 20.51 concrete in base and making good the disturbed ground stacking Rmt 65.87
useful materials as directed and disposing as directed and
disposing of the unserviceable materials with all lead and lift.
Dismentling C.I. pipes G.S.W.pipes abd A.C. rain water pipes with
Rupees Seventy Four and Paisa
650 20015 20.56 fittings and clamps including stacking the materials with all lead Rmt 74.11
Eighty Five Only
and lift ( for any dia, of pipe)
Dismantling santtary fittings like wash basin . W.C. pan Indian and
Rupees Four Hundred Four and
651 20016 0 European type, flushing tank etc. including stacking the materials Each 400.37
Paisa Thirty Seven Only
with all lead and lift.
Scraping oil paint from steel and other metal surface and making Rupees Fifty and Paisa Fifty Five
the surface even (with Hand Scraping.) Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing 15 mm diameter backup rod having minimum
density 22 kg per cum (ASTMD - 3575) & compression strength of Rupees Thirteen and Paisa Seven
0.40 kg per sqm (ASTM - 5249) and finishing with polysulphide Only
sealant etc. complete. For 12 mm wide expansion joint
Providing and fixing 25 mm diameter backup rod having minimum
density 22 kg per cum (ASTMD - 3575) & compression strength of Rupees Seventeen and Paisa
0.40 kg per sqm (ASTM - 5249) and finishing with polysulphide Eighty Only
sealant etc. complete. For 20 mm wide expansion joint
Providing and fixing 30 mm diameter backup rod having minimum
density 22 kg per cum (ASTMD - 3575) & compression strength of Rupees Twenty and Paisa
0.40 kg per sqm (ASTM - 5249) and finishing with polysulphide Seventeen Only
sealant etc. complete. For 25 mm wide expansion joint
Providing and fixing 50 mm diameter backup rod having minimum
density 22 kg per cum (ASTMD - 3575) & compression strength of Rupees Fifty Three and Paisa
0.40 kg per sqm (ASTM - 5249) and finishing with polysulphide Thirty Only
sealant etc. complete. For 40 mm wide expansion joint
Providing and fixing 60 mm diameter backup rod having minimum
density 22 kg per cum (ASTMD - 3575) & compression strength of Rupees Sixty Nine and Paisa
0.40 kg per sqm (ASTM - 5249) and finishing with polysulphide Seven Only
sealant etc. complete. For 50 mm wide expansion joint
Removing and scraping of old deteriorated plaster of any thickness
fromm wall / R.C.C member including stacking of serviceable Rupees Nineteen and Paisa Forty
material and disposal of unserviceable from site of work with all One Only
Providing and fixing of Corner Angle for Various Flashing in
100mm x 100mm size in Equal Shape with 5mm edge lipping on
both side . The Angle Flashing shall be made out of 0.5 mm thick
pre coated GI sheet with edge bending of approximate 5mm. The
Precoated sheet shall be of minimum 240 mpa steel grade
confirming to IS 14246:1995 and shall have zinc coating of Rupees Seven Hundred Eighty
minimum 120 gsm as per IS:277:1992 , 5-7 microns epoxy primer One and Paisa Two Only
on both side of the sheet and polyester top coat 15-18 micron. The
PPGI Sheet shall have plastic protective guard film of minimum
microns to avoid scratches during transportation. The U track
shall be fixed with suitable POP rivet with wall and roof panels
with minimum spacing of 450 mm c/c.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing of Corner Angle for Various Flashing in
150mm x 150mm size in Equal Shape with 5mm edge lipping on
both side . The Angle Flashing shall be made out of 0.5 mm thick
pre coated GI sheet with edge bending of approximate 5mm. The
Precoated sheet shall be of minimum 240 mpa steel grade
confirming to IS 14246:1995 and shall have zinc coating of Rupees Seven Hundred Eighty
minimum 120 gsm as per IS:277:1992 , 5-7 microns epoxy primer Five and Paisa Ninety One Only
on both side of the sheet and polyester top coat 15-18 micron. The
PPGI Sheet shall have plastic protective guard film of minimum
microns to avoid scratches during transportation. The U track
shall be fixed with suitable POP rivet with wall and roof panels
with minimum spacing of 450 mm c/c.
Providing and fixing PUF Insulated continueous sandwich panels
for roofs of total thickness not less than 30 mm made out from
continue line method.Panel shall have 0.5 mm thick pre coated GI
sheet on both side of Polyurethane foam with external face being
corrugated in shape for GI and PU foam both material.The crest
height of the panel shall be of 35mm minimum wiht 250mm c/c
pitch. The Precoated sheet shall be of minimum 240 mpa steel
grade confirming to IS 14246:1995 and shall have zinc coating of
120 gsm as per IS:277 , 5-7 microns epoxy primer on both side of Rupees Three Thousand One
661 20048 0 the sheet and polyester top coat 15-18 micron.The PPGI Sheet shall Sqm 3115.67 3146.83 Hundred Forty Six and Paisa
have protective guard film of minimum 25 microns to avoid Eighty Three Only
scratches wihile trasportation.The roof panels are laid over a
frame work of trusses, columns and purlins fixed using 90mm self
drilling bolt with rubber washer including all types of flashings. PU
Foam must be self-extinguishing, fire retardant type having
minimum density of 40 Kg/Cu.mt.( +, - 2 Kgs) including 0.25mm
craft paper edging,self tapping screws of required length and
nos.etc complete as per structural design and direction of
Engineer-in-charge.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing PUF Insulated continueous sandwich panels
for roofs of total thickness not less than 30 mm made out from
continue line method.Panel shall have 0.35 mm thick pre coated GI
sheet on both side of Polyurethane foam with external face being
corrugated in shape for GI and PU foam both material.The crest
height of the panel shall be of 35mm minimum wiht 250mm c/c
pitch. The Precoated sheet shall be of minimum 240 mpa steel
grade confirming to IS 14246:1995 and shall have zinc coating of
120 gsm as per IS:277 , 5-7 microns epoxy primer on both side of Rupees Two Thousand Nine
662 20049 0 the sheet and polyester top coat 15-18 micron.The PPGI Sheet shall Sqm 2895.98 2924.94 Hundred Twenty Four and Paisa
have protective guard film of minimum 25 microns to avoid Ninety Four Only
scratches wihile trasportation.The roof panels are laid over a
frame work of trusses, columns and purlins fixed using 90mm self
drilling bolt with rubber washer including all types of flashings. PU
Foam must be self-extinguishing, fire retardant type having
minimum density of 40 Kg/Cu.mt.( +, - 2 Kgs) including 0.25mm
craft paper edging,self tapping screws of required length and
nos.etc complete as per structural design and direction of
Engineer-in-charge.
Providing and fixing PUF Insulated continueous sandwich panels
for walls of total thickness not less than 50 mm and width 1.0 m
made out from continue line method on automatic plant.Panel
shall have 0.5 mm thick pre coated GI sheet on both side of
Polyurethane Foam confirming to IS 12436:1988.The Precoated
sheet shall be of minimum 240 mpa steel grade confirming to IS
14246:1995 and shall have zinc coating of minimum 120 gsm as
per IS:277:1992 , 5-7 microns epoxy primer on both side of the Rupees Three Thousand One
663 20050 0 sheet and polyester top coat 15-18 micron.The PPGI Sheet shall Sqm 3115.54 3146.70 Hundred Forty Six and Paisa
have plastic protective guard film of minimum 25 microns to Seventy Only
avoid scratches during trasportation.The panels shall be vertically
joined together by tongue and groove joints. The PU Foam shall be
self-extinguishing, fire retardant type having minimum density of
40 Kg/Cu.mt.( +, - 2 Kgs) including 0.25 mm thick craft paper
edging on both edges. The panels shall be fixed to the steel frame
structure with minimum 5mm thick self tapping GI screws of
required length and nos. with minimum spacing of 300 mm c/c.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing PUF Insulated continueous sandwich panels
for walls of total thickness not less than 50 mm and width 1.0 m
made out from continue line method on automatic plant.Panel
shall have 0.35 mm thick pre coated GI sheet on both side of
Polyurethane Foam confirming to IS 12436:1988.The Precoated
sheet shall be of minimum 240 mpa steel grade confirming to IS
14246:1995 and shall have zinc coating of minimum 120 gsm as
per IS:277:1992 , 5-7 microns epoxy primer on both side of the Rupees Two Thousand Eight
664 20051 0 sheet and polyester top coat 15-18 micron.The PPGI Sheet shall Sqm 2851.77 2880.29 Hundred Eighty and Paisa
have plastic protective guard film of minimum 25 microns to Twenty Nine Only
avoid scratches during trasportation.The panels shall be vertically
joined together by tongue and groove joints. The PU Foam shall be
self-extinguishing, fire retardant type having minimum density of
40 Kg/Cu.mt.( +, - 2 Kgs) including 0.25 mm thick craft paper
edging on both edges. The panels shall be fixed to the steel frame
structure with minimum 5mm thick self tapping GI screws of
required length and nos. with minimum spacing of 300 mm c/c.
Providing and fixing PUF Insulated continueous sandwich panels
for walls of total thickness not less than 40 mm and width 1.0 m
made out from continue line method on automatic plant.Panel
shall have 0.5 mm thick pre coated GI sheet on both side of
Polyurethane Foam confirming to IS 12436:1988.The Precoated
sheet shall be of minimum 240 mpa steel grade confirming to IS
14246:1995 and shall have zinc coating of minimum 120 gsm as
per IS:277:1992 , 5-7 microns epoxy primer on both side of the
Rupees Three Thousand Seventy
665 20052 0 sheet and polyester top coat 15-18 micron.The PPGI Sheet shall Sqm 3048.22
Eight and Paisa Seventy Only
have plastic protective guard film of minimum 25 microns to
avoid scratches during trasportation.The panels shall be vertically
joined together by tongue and groove joints. The PU Foam shall be
self-extinguishing, fire retardant type having minimum density of
40 Kg/Cu.mt.( +, - 2 Kgs) including 0.25 mm thick craft paper
edging on both edges. The panels shall be fixed to the steel frame
structure with minimum 5mm thick self tapping GI screws of
required length and nos. with minimum spacing of 300 mm c/c.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing PUF Insulated continueous sandwich panels
for walls of total thickness not less than 40 mm and width 1.0 m
made out from continue line method on automatic plant.Panel
shall have 0.35 mm thick pre coated GI sheet on both side of
Polyurethane Foam confirming to IS 12436:1988.The Precoated
sheet shall be of minimum 240 mpa steel grade confirming to IS
14246:1995 and shall have zinc coating of minimum 120 gsm as
per IS:277:1992 , 5-7 microns epoxy primer on both side of the Rupees Two Thousand Eight
666 20053 0 sheet and polyester top coat 15-18 micron.The PPGI Sheet shall Sqm 2784.47 2812.31 Hundred Twelve and Paisa
have plastic protective guard film of minimum 25 microns to Thirty One Only
avoid scratches during trasportation.The panels shall be vertically
joined together by tongue and groove joints. The PU Foam shall be
self-extinguishing, fire retardant type having minimum density of
40 Kg/Cu.mt.( +, - 2 Kgs) including 0.25 mm thick craft paper
edging on both edges. The panels shall be fixed to the steel frame
structure with minimum 5mm thick self tapping GI screws of
required length and nos. with minimum spacing of 300 mm c/c.
Structural steel work ( Confirming to IS 4923-1997) riveted, bolted
or welded in builtup for all type sections, in framed work,
including cutting, hoisting, fixing in position and applying a Rupees One Hundred Thirty One
priming coat of approved steel primer all complete as per the and Paisa Fifteen Only
structural designs and directions of Engineer in charge.Column (
Providing and fixing of Bottom and top U track for closing of end
joints for cut PUF panels of size of 52mm x 30mm with 5mm
lipping on Both edges. The U track shall be made out of 0.5 mm
thick pre coated GI sheet.The Precoated sheet shall be of minimum
240 mpa steel grade confirming to IS 14246:1995 and shall have
zinc coating of minimum 120 gsm as per IS:277:1992 , 5-7 microns Rupees Five Hundred Ninety
epoxy primer on both side of the sheet and polyester top coat 15- Seven and Paisa Fifty Three Only
18 micron. The PPGI Sheet shall have plastic protective guard film
of minimum 25 microns to avoid scratches during transportation.
The U track shall be fixed with suitable POP rivet with wall roof
panels and plinth with Expandable fastners with minimum spacing
of 450 mm c/c. The Utrack shall be fixed
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing of Bottom and top U track for closing of end
joints for cut PUF panels of size of 52mm x 30mm with 5mm
lipping on Both edges. The U track shall be made out of 0.5 mm
thick pre coated GI sheet.The Precoated sheet shall be of minimum
240 mpa steel grade confirming to IS 14246:1995 and shall have
zinc coating of minimum 120 gsm as per IS:277:1992 , 5-7 microns Rupees Five Hundred Sixty Seven
epoxy primer on both side of the sheet and polyester top coat 15- and Paisa Sixteen Only
18 micron. The PPGI Sheet shall have plastic protective guard film
of minimum 25 microns to avoid scratches during transportation.
The U track shall be fixed with suitable POP rivet with wall roof
panels and plinth with Expandable fastners with minimum spacing
of 450 mm c/c. The Utrack shall be fixed
Providing and fixing of Ridge flashing for roof panel shall be made
out of 0.5 mm thick pre coated GI sheet . The Precoated sheet shall
be of minimum 240 mpa steel grade confirming to IS 14246:1995
and shall have zinc coating of minimum 120 gsm as per
IS:277:1992 , 5-7 microns epoxy primer on both side of the sheet
Rupees Five Hundred Twenty
670 20057 0 and polyester top coat 15- 18 micron. The PPGI Sheet shall have Rmt 515.28
and Paisa Forty Three Only
plastic protective guard film of minimum 25 microns to avoid
scratches during transportation. The ridge shall be fixed to the
steel members by pop rivet or self drilling/self stitching fastners
@ maximum 450 mm c/c along length of capping/flashing etc
Providing and fixing of Ridge flashing for roof panel shall be made
out of 0.5 mm thick pre coated GI sheet . The Precoated sheet shall
be of minimum 240 mpa steel grade confirming to IS 14246:1995
and shall have zinc coating of minimum 120 gsm as per
IS:277:1992 , 5-7 microns epoxy primer on both side of the sheet
Rupees Eight Hundred Sixty
671 20057A 0 and polyester top coat 15- 18 micron. The PPGI Sheet shall have Sqm 858.8
Seven and Paisa Thirty Nine Only
plastic protective guard film of minimum 25 microns to avoid
scratches during transportation. The ridge shall be fixed to the
steel members by pop rivet or self drilling/self stitching fastners
@ maximum 450 mm c/c along length of capping/flashing etc
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing of end cap of Roofing panel. The End Cap track
shall be made out of 0.5 mm thick pre coated GI sheet suitable for
30mm thick panel.The Precoated sheet shall be of minimum
mpa steel grade confirming to IS 14246:1995 and shall have zinc
coating of minimum 120 gsm as per IS:277:1992 , 5-7 microns Rupees Seven Hundred Seventy
epoxy primer on both side of the sheet and polyester top coat 15- Seven and Paisa Seventy Six Only
18 micron. The PPGI Sheet shall have plastic protective guard film
of minimum 25 microns to avoid scratches during transportation.
The U track shall be fixed with suitable POP rivet with wall and
roof panels with minimum spacing of 450 mm c/c.
Providing and fixing of end cap of Roofing panel. The End Cap track
shall be made out of 0.5 mm thick pre coated GI sheet suitable for
40mm thick panel.The Precoated sheet shall be of minimum
mpa steel grade confirming to IS 14246:1995 and shall have zinc
coating of minimum 120 gsm as per IS:277:1992 , 5-7 microns Rupees Six Hundred Ninety
epoxy primer on both side of the sheet and polyester top coat 15- Seven and Paisa Eighty Six Only
18 micron. The PPGI Sheet shall have plastic protective guard film
of minimum 25 microns to avoid scratches during transportation.
The U track shall be fixed with suitable POP rivet with wall and
roof panels with minimum spacing of 450 mm c/c.
Providing and fixing of Corner Angle for Various Flashing in 25mm
x 25mm size in Equal Shape with 5mm edge lipping on both side .
The Angle Flashing shall be made out of 0.5 mm thick pre coated GI
sheet with edge bending of approximate 5mm. The Precoated
sheet shall be of minimum 240 mpa steel grade confirming to IS
14246:1995 and shall have zinc coating of minimum 120 gsm as Rupees Five Hundred Seven and
per IS:277:1992 , 5-7 microns epoxy primer on both side of the Paisa Ten Only
sheet and polyester top coat 15-18 micron. The PPGI Sheet shall
have plastic protective guard film of minimum 25 microns to
avoid scratches during transportation. The U track shall be fixed
with suitable POP rivet with wall and roof panels with minimum
spacing of 450 mm c/c.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing of Corner Angle for Various Flashing in 50mm
x 50mm size in Equal Shape with 5mm edge lipping on both side .
The Angle Flashing shall be made out of 0.5 mm thick pre coated GI
sheet with edge bending of approximate 5mm. The Precoated
sheet shall be of minimum 240 mpa steel grade confirming to IS
14246:1995 and shall have zinc coating of minimum 120 gsm as Rupees Five Hundred Seventy
per IS:277:1992 , 5-7 microns epoxy primer on both side of the and Paisa Sixty Eight Only
sheet and polyester top coat 15-18 micron. The PPGI Sheet shall
have plastic protective guard film of minimum 25 microns to
avoid scratches during transportation. The U track shall be fixed
with suitable POP rivet with wall and roof panels with minimum
spacing of 450 mm c/c.
Providing and fixing of Corner Angle for Various Flashing in
100mm x 100mm size in Equal Shape with 5mm edge lipping on
both side . The Angle Flashing shall be made out of 0.5 mm thick
pre coated GI sheet with edge bending of approximate 5mm. The
Precoated sheet shall be of minimum 240 mpa steel grade
confirming to IS 14246:1995 and shall have zinc coating of Rupees Seven Hundred Eighty
minimum 120 gsm as per IS:277:1992 , 5-7 microns epoxy primer Four and Paisa Twenty Nine Only
on both side of the sheet and polyester top coat 15-18 micron. The
PPGI Sheet shall have plastic protective guard film of minimum
microns to avoid scratches during transportation. The U track
shall be fixed with suitable POP rivet with wall and roof panels
with minimum spacing of 450 mm c/c.
Providing and fixing of Corner Angle for Various Flashing in
150mm x 150mm size in Equal Shape with 5mm edge lipping on
both side . The Angle Flashing shall be made out of 0.5 mm thick
pre coated GI sheet with edge bending of approximate 5mm. The
Precoated sheet shall be of minimum 240 mpa steel grade
confirming to IS 14246:1995 and shall have zinc coating of Rupees Eight Hundred Seventy
minimum 120 gsm as per IS:277:1992 , 5-7 microns epoxy primer Five and Paisa Eighty One Only
on both side of the sheet and polyester top coat 15-18 micron. The
PPGI Sheet shall have plastic protective guard film of minimum
microns to avoid scratches during transportation. The U track
shall be fixed with suitable POP rivet with wall and roof panels
with minimum spacing of 450 mm c/c.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Preparing and applying of water soluble, nonflammable, reactive
and penetrative silane nanotechnology with water (<1000 ppm
TDS) in the ratio of 1 liter silane :20 liter water mixed with 0.5 liter
acrylic copolymer polymer compatible and stable in silane
solution. Take 1 liter of silane nanotechnology and add in 20 liter
water in drum under manual stirring and then add 0.5 liter acrylic Rupees Eighty One and Paisa
copolymer under manual stirring and mix completely. Spray apply Twenty Seven Only
the solution at the rate of 1 liter per sqm on horizontal and 0.5 liter
per sqm on vertical new or old cementitious / concrete surface .
(For very dense concrete of M50 and above for bridges may not
absorb 1 liter per sq meter so reduce the water of dilution to
1:10)Horizonal Surface
Preparing and applying of water soluble, nonflammable, reactive
and penetrative silane nanotechnology with water (<1000 ppm
TDS) in the ratio of 1 liter silane :20 liter water mixed with 0.5 liter
acrylic copolymer polymer compatible and stable in silane
solution. Take 1 liter of silane nanotechnology and add in 20 liter
water in drum under manual stirring and then add 0.5 liter acrylic Rupees Forty Six and Paisa
copolymer under manual stirring and mix completely. Spray apply Thirty Four Only
the solution at the rate of 1 liter per sqm on horizontal and 0.5 liter
per sqm on vertical new or old cementitious / concrete surface .
(For very dense concrete of M50 and above for bridges may not
absorb 1 liter per sq meter so reduce the water of dilution to
1:10)Vertical Surface
Providing and fixing M.S. fan clamps of shape and size as specified Rupees One Hundred Seventy
680 21001 21.8 in existing R.C.C. slab including cutting chase and Each 175.97 177.73 Seven and Paisa Seventy Three
making good. Only
Cutting out cracks of roof terrace to V- section , cleaning out,
Rupees Sixty Six and Paisa Eighty
681 21002A 21.23 wetting , grouting with cement and sand slurry 1:3 (1- Rmt 66.19
cement 3-sand )
Cutting out cracks roof terrace to V-Section cleaning out and filling
Rupees Seventy Six and Paisa
682 21003A 21.24 solidly with a hot mixture of bitumen and clean Rmt 76.2
Ninety Six Only
dry sand (1:1 by weight)
Providing and fixing 1.20 Metre high fencing with 2.0 Metre long
M.S. Angle posts 40mm x 40 mm x6 mm and oil painting 3 coats
fixed at 2.5 Mt,C/c. with five Horizontan lines and two diagonals of
Rupees Three Hundred Ninety
683 22001 22.2 galvanised steel barbed wire weighting 9.38 Kg. per 100 Metre, Rmt 388.05
One and Paisa Ninety Three Only
strained and fixed to posts with G.I,staples including fixing the
postsin ground with 0.5 M x 0.5.M x 0.5 M. block in C.C1:5:10 etc
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Construction of B,B,masonery paniyara 23cm. x 75cm. wall and
15cm x 15cm curbing including fixing precast R.C.C. arble mosaic
Rupees Two Thousand One
(Terrazo) slab of 75mm thickness on top and smooth finishing in
684 22002 0 Rmt 2108.37 2129.45 Hundred Twenty Nine and Paisa
cement plaster in C.M. 1:3 curing etc. complete including drainage
Forty Five Only
out waste water
Constructing a sink (chowkedi) with C.C. 1:2:4, 12cm. thick over
Rupees Two Thousand Two
B.B. masonry in C.M,(1:6) in front and dwarf wall 1.0 Mt.high and
685 22003 0 Rmt 2235.66 2258.02 Hundred Fifty Eight and Paisa
23 cm.thick cement plaster to masonry / in C.M.1:3) and cement
concrete flooring in 1:2:4: mi x 5 cm. dia. drain pipe etc.complete.
Constructing a cooking platform 60 cm. width and 70 cm high
resting on B.B.Masonry walls 23 cm.thick in C.M.(1:6) with (i)
Rupees Two Thousand Six
Fixing or precast R.C.C.1:2:4) 8 cm. thick slab with marble chips set
686 22004A 0 Rmt 2668.09 2694.77 Hundred Ninety Four and Paisa
in C.M. (1:6) (6mm thick terrazo) with plastering on exposed
Seventy Seven Only
faces walls in C.M. (1:4) etc
Constructing a cooking platform 60 cm. width and 70 cm high
resting on B.B.Masonry walls 23 cm.thick in C.M.(1:6) with (ii) Rupees Two Thousand Six
687 22004B 0 Fixing black kadappa stone 30mm thick laid on precast R.C.C. Rmt 2629.76 2656.06 Hundred Fifty Six and Paisa Six
(1:2:4) slab with plastering on exposed faces of wall in C.M. (1:4) Only
Carrying out timber treatment to all wood work including drilling
holes and spraying oil based chemical solution on surface of timber
work for termite control including labor and material etc.
complete. Using Chlorpyriphos20 EC as per 6313 2013 Part III (1%
concentration by mass) is recommended one litre chemical Rupees Fifty Three and Paisa
emulsion diluted with 19 liters of kerosene. Total diluted Sixty Six Only
concentration will be 20 liters inclusive of 1 liter chemical
emulsion application in drilled holes and 0.75 / Litre chemical per
one Sqmt two coat on wood surface not protected by paint or
Applying general insecticide pest control treatment to floors,
cupboards etc including labour materials etc. complete. Using
Imidacloprid 30.5 SCas Per IS 6313 part -II( (0.075% concentration Rupees Forty Six and Paisa
by mass) is recommended 10.5ml chemical diluted with 5 liters of Ninety Five Only
water application 0.5 litre chemical /Sqm of surface is
recommended as per I.S.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Carring out plinth treatment to post construction / existing
structure by spraying chemical solution for termite control
treatment including labour and material consistment with
I.S.I specification. Using Chlordene and Chiorpurfiles 20 EC. As Per
Rupees Ninety Eight and Paisa
690 22007 0 6131_paret-II Consentration Weight one percent is recommended Smt 97.84
Eighty Two Only
i.e one litre 20 EC chemical emulsion with 19 liter give 1 %
concrentration inclusive of one litre chemical emulsion appication
at the rate of 5 Litre chemical / Sqm of surface is recommended as
Carrying out wall treatment for termite control including spraying
with chemical solution in oil base including labour and material
Using Chlorpyriphos 20 ECAs per IS 6313 part - II (1%
concentration by mass) is recommended i.e one litre chemical Rupees Twenty Eight and Paisa
emulsion diluted with 19 liter oil base. Total solution will be 20 Fifty Four Only
liters inclusive of one liter chemical emulsion application at the
rate of 7.5 litre chemical / Sqm of surface is recommended as per
Providing and fixing Rajula stone 75mm thick 60mm x 45mm size Rupees Eighty Two and Paisa
including fixing in cement mortar as directed. Twenty Eight Only
Providing and laying bilimora type Brick facing in C.M. 1:1 laid
Rupees Eight Hundred Sixty Six
693 22010A 0 over bedding of cement mortar 1:3 (20mm thickness) including Smt 858.18
and Paisa Seventy Six Only
clearing watering scaffolding etc. complete.
Providing and fixing Teak wood rail of 60mm x 20mm size and
Rupees Seventy One and Paisa
694 22011 0 50cm. length including 3 coats of oil paint to wood Rmt 70.47
work with set of 3 pags.
Providing erecting and fixing double coated ISI water tank of
Rupees Three and Paisa Ninety
695 22014 0 required capacity each with all necessary fittings and connection litre 3.91
etc. complete on terrace
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Pro. and mixing Migratory Corrosion Admixture having Specific
Gravity 1.01 to 1.04 pH value (Minimum 9.50) shall be alkaline in
nature and having bipolar concrete penetrating corrosion
inhibiting properties, inhabitor shall be non-nitrite based & have
the ability to provide corrosion protection to both anodic and
cathodic sites on the steel surface, inhibitor-steel complex shall
formed polydentate complexes, having more than one bond with
Rupees Seven Hundred Twenty
696 22015 0 steel per molecule of inhibitor, with steel surface to promote Cum 717.2
Four and Paisa Thirty Seven Only
proper film formation with enhenced bond to steel, inhibiting the
electro-chemical corrosion reaction, inhibitor shall not have any
adverse effect on concrete compressive strength, inhibitor shall
have a corrosion rate of zero coulombs per ASTM-G109-2005,
admixture shall be conforming to IS 9103 and in liquid form at the
rate of 3 kg per cmt vol. of concrete admixture shall be added to
the water during mixing of cement.
Pro. and mixing Migratory Corrosion Admixture having Specific
Gravity 1.01 to 1.04 pH value (Minimum 9.50) shall be alkaline in
nature and having bipolar concrete penetrating corrosion
inhibiting properties, inhabitor shall be non-nitrite based & have
the ability to provide corrosion protection to both anodic and
cathodic sites on the steel surface, inhibitor-steel complex shall
formed polydentate complexes, having more than one bond with Rupees Fourteen and Paisa
steel per molecule of inhibitor, with steel surface to promote Twenty Seven Only
proper film formation with enhenced bond to steel, inhibiting the
electro-chemical corrosion reaction, inhibitor shall not have any
adverse effect on concrete compressive strength, inhibitor shall
have a corrosion rate of zero coulombs per ASTM-G109-2005,
admixture shall be conforming to IS 9103 and in liquid form at the
rate of 5% by weight of cementitious materials.. Etc. complete.
Providing and fixing Resin Bonded Rock Wool of density 48 kg / Rupees Two Thousand Seven
698 22017 0 cum as & where required as directed by Engineer-in- Charge. Rock Cum 2710.97 2738.08 Hundred Thirty Eight and Paisa
Wool confirming to IS: 8183 Eight Only
Providing and fixing Vapour Breather Membrane Confirming to Rupees One Hundred Seventy
699 22018 0 IBC 2009 on Exterior Cement Board as & Sqm 170.03 171.73 One and Paisa Seventy Three
Where directed by Engineer-in-Charge. Only
Providing and Laying of One side alluminium foil thermal bubble
insulation barrier on the external side of the LWGS wall Panel Rupees One Hundred Thirty Six
under the Cement Board as & Where directed by and Paisa Seventy Nine Only
Engineer-in-Charge.
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and Fixing 12 mm thick moisture & fire resistant heavy
duty Cement Fibre Board (High pressure steam cured) Confirming
Rupees Seven Hundred Twenty
701 22020 0 to ISO 4862-2000 in wall panels of one face of cold formed Sqm 715.5
Two and Paisa Sixty Six Only
galvanised light gauge steel frame structure to form wall /
partition as & Where directed by Engineer-in-Charge
Supply & fixing factory finished cold formed Light guage steel
frame sections confirming to SP:6 (5) 1980 at site or work
including riveted, bolted or welded in builtup for all type of Rupees One Hundred Fourteen
sections ,in framed work, cutting, hoisting, fixing in position and and Paisa Forty Four Only
applying primer coat of approved steel primer etc. complete as per
structural designs & directions of Engineer-in-charge.
Anti-Termite System:Providing and laying of permanent piping
technology anti-termite treatment before flooring work by
installing LLDP (Low linear density polyethylene) tube of 8 mm
O.D. & 6.4 mm 1.D. with inbuilt pressure compensation chip every
30 cm interval in the tube, having working pressure of 2 Kg/cm2
and release rate of 1.9 Itr/hour fixed by P-clips and nails. The LLDP
pipe shall be installed at the entire periphery of the building and at
internal network of building at a depth of 20 to 200 mm under
floor at every 2 to 3 mtr. c/c distance (adjusted as per building
layout ) & Ends of loop pass through a PVC elbow of minimum
Rupees One Hundred Thirty Four
703 22022 0 mm ID at junction box of wall and floor level, entering into a steel Sq.mt 133
and Paisa Thirty Three Only
reinforced grooved flexible pipe of minimum 22 mm ID leading
into junction box and the loops shall terminate in junction boxes &
test every junction during injecting chemicals for termite control
treatment. The anti termite chemical Imidacloprid 30.5% SC mix as
per IS-6313 (part III) shall be injected by the pressure pump
diluted with water @ 10.5 ml/5 ltr of water at the rate of
Kg/sq.cm @ 5 Ltr/SMT. The contractor shall submit approved line
plan for piping system and junction boxes dully approved by
Engineer-in-Charge with bond of 5 year warranty.(i)Anti Termite
chemical injected area (Chemical injecting incl. labour cost)
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Anti-Termite System:Providing and laying of permanent piping
technology anti-termite treatment before flooring work by
installing LLDP (Low linear density polyethylene) tube of 8 mm
O.D. & 6.4 mm 1.D. with inbuilt pressure compensation chip every
30 cm interval in the tube, having working pressure of 2 Kg/cm2
and release rate of 1.9 Itr/hour fixed by P-clips and nails. The LLDP
pipe shall be installed at the entire periphery of the building and at
internal network of building at a depth of 20 to 200 mm under
floor at every 2 to 3 mtr. c/c distance (adjusted as per building
layout ) & Ends of loop pass through a PVC elbow of minimum
Rupees Sixty Three and Paisa
704 22023 0 mm ID at junction box of wall and floor level, entering into a steel sq.mt 63
Sixty Three Only
reinforced grooved flexible pipe of minimum 22 mm ID leading
into junction box and the loops shall terminate in junction boxes &
test every junction during injecting chemicals for termite control
treatment. The anti termite chemical Imidacloprid 30.5% SC mix as
per IS-6313 (part III) shall be injected by the pressure pump
diluted with water @ 10.5 ml/5 ltr of water at the rate of
Kg/sq.cm @ 5 Ltr/SMT. The contractor shall submit approved line
plan for piping system and junction boxes dully approved by
Engineer-in-Charge with bond of 5 year warranty.(II)Anti Termite
chemical injected area (Chemical injecting incl. labour cost)
Providing and fixing to wall, ceiling and floor galvanised Mild steel
tubes (Medium grade) of the following nominal bore, tube fitting Rupees Two Hundred Fifty One
and clamps including making good the wall ceiling and floor.(A) and Paisa Ten Only
Providing and fixing to wall, ceiling and floor galvanised Mild steel
tubes (Medium grade) of the following nominal bore, tube fitting Rupees Three Hundred Four and
and clamps including making good the wall ceiling and floor.(B) Zero Paisa Only
Providing and fixing to wall, ceiling and floor galvanised Mild steel
tubes (Medium grade) of the following nominal bore, tube fitting Rupees Four Hundred One and
and clamps including making good the wall ceiling and floor.(C) Paisa Ninety Five Only
Providing and fixing to wall, ceiling and floor galvanised Mild steel
tubes (Medium grade) of the following nominal bore, tube fitting Rupees Five Hundred and Paisa
and clamps including making good the wall ceiling and floor.(D) Ninety Seven Only
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing to wall, ceiling and floor galvanised Mild steel
tubes (Medium grade) of the following nominal bore, tube fitting Rupees Six Hundred Eight and
and clamps including making good the wall ceiling and floor.(E) Paisa Thirty Five Only
Providing and fixing to wall, ceiling and floor galvanised Mild steel
tubes (Medium grade) of the following nominal bore, tube fitting Rupees Seven Hundred Ninety
and clamps including making good the wall ceiling and floor.(F) Four and Paisa Eighteen Only
Providing and laying in trenches galvanised mild steel tubes
(Medium grade) of the following nominal bore, and tube fitting Rupees One Hundred Fifty Two
(Earthwork in trenches to be measured and paid for and Paisa Ninety Five Only
separately)(A) 15mm
Providing and laying in trenches galvanised mild steel tubes
(Medium grade) of the following nominal bore, and tube fitting Rupees One Hundred Ninety
(Earthwork in trenches to be measured and paid for Three and Paisa Forty Only
separately)(B) 20mm
Providing and laying in trenches galvanised mild steel tubes
(Medium grade) of the following nominal bore, and tube fitting Rupees Two Hundred Eighty
(Earthwork in trenches to be measured and paid for separately) Two and Paisa Ninety Eight Only
Providing and laying in trenches galvanised mild steel tubes
(Medium grade) of the following nominal bore, and tube fitting Rupees Four Hundred Twenty
(Earthwork in trenches to be measured and paid for Six and Paisa Forty Only
separately)(D) 40mm
Providing and laying in trenches galvanised mild steel tubes
(Medium grade) of the following nominal bore, and tube fitting Rupees Seven Hundred Twenty
(Earthwork in trenches to be measured and paid for Five and Paisa Seventy One Only
separately)(E) 65mm
Providing and laying in trenches galvanised mild steel tubes
(Medium grade) of the following nominal bore, and tube fitting Rupees Nine Hundred Twenty
(Earthwork in trenches to be measured and paid for One and Paisa Sixty Eight Only
separately)(H) 80mm
Making connection of galvanised Mild steel distribution branch
with galvanised mild steel main 50mm to 80mm nominal bore by Rupees Nine Hundred Sixteen
providing and fixing tee including cutting and threading the pipes and Paisa Thirty Five Only
Providing and fixing to wall ceiling and floor 6.0 Kg. F/Cm2
working pressure poluthene pipes of the following outside Dia.
Rupees Eighty Two and Paisa
718 23004A 23.8 Low densidy, complete with special falnge compression type Rmt 81.36
fittings, wall clipsetc. including making good the wall ceiling and
Ref. SOR Aprroved Rate
Item No Item No.as Description Unit Rate Incl.
Item Code SOR Rates Rate in Words
per NBO 1% L.C.
Providing and fixing to wall ceiling and floor 6.0 Kg. F/Cm2
working pressure poluthene pipes of the following outside Dia.
Rupees One Hundred Five and
719 23004B 23.8 Low densidy, complete with special falnge compression type Rmt 104.46
Paisa Fifty Only
fittings, wall clipsetc. including making good the wall ceiling and
Providing and fixing to wall ceiling and floor 10.0 Kg. F/Cm2
working pressure poluthene pipes of the following outside Dia.
Rupees One Hundred Twenty
720 23004C 23.8 Low densidy, complete with special falnge compression type Rmt 120.76
One and Paisa Ninety Seven Only
fittings, wall clipsetc. including making good the wall ceiling and
Providing and fixing to wall ceiling and floor 10.0 Kg. F/Cm2
working pressure poluthene pipes of the following outside Dia.
Rupees One Hundred Twenty
721 23004D 23.8 Low densidy, complete with special falnge compression type Rmt 126.1
Seven and Paisa Thirty Six Only
fittings, wall clipsetc. including making good the wall ceiling and
Providing and fixing to wall ceiling and floor 10.0 Kg. F/Cm2
working pressure poluthene pipes of the following outside Dia.
Rupees One Hundred Seventy
722 23004E 23.8 Low densidy, complete with special falnge compression type Rmt 169.51
One and Paisa Twenty One Only
fittings, wall clipsetc. including making good the wall ceiling and
Providing and fixing to wall ceiling and floor 10.0 Kg. F/Cm2
working pressure polythene pipes of the following outside Dia.
Rupees Two Hundred Eighty
723 23004F 23.8 Low densidy, complete with special falnge compression type Rmt 277.46
and Paisa Twenty Three Only
fittings, wall clipsetc. including making good the wall ceiling and
Providing and fixing to wall ceiling and floor 10.0 Kg. F/Cm2
working pressure poluthene pipes of the following outside Dia.
Rupees Three Hundred Thirty
724 23004G 23.8 Low densidy, complete with special falnge compression type Rmt 335.69
Nine and Paisa Five Only
fittings, wall clipsetc. including making good the wall ceiling and
floor.(G)110 mm
Providing and fixing cast iron spigot and socket soil, waste and
Rupees Seven Hundred Forty
725 23005BA 23.79 ventilating pipes of the following nominal size.(B) Rmt 733.67
One and Paisa One Only
Providing and fixing cast iron spigot and socket soil, waste and
Rupees Eight Hundred Ninety
726 23005CA 23.79 ventilating pipes of the following nominal size.(C) Rmt 883.55
Two and Paisa Thirty Nine Only
Providing and fixing in position cowel went to pipes.(B) Rupees Three Hundred Ninety
75mm dia. Three and Paisa Four Only
Providing and fixing in position cowel went to pipes.(C) Rupees Five Hundred Five and
100mm dia Paisa Seventeen Only
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 Civil Building Specification Book.pdf
02 Electrical Specification Book.pdf
03 Circular Part 1.pdf
04 Circular Part 2.pdf
05 Special Condition and formats.pdf
06-01 Civil Make List 2025 (1).pdf
06-02 Special Instruction to Bidder.pdf
07 SBD PADRA KARJAN Final.pdf
08 SCH-B ARC VADODARA FINAL 29-04-2026 Padra.pdf
09 Specification Civil.pdf
10 Tender Document 06-07.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .