Tender Value
₹2.4 Cr
EMD Value
₹1 L
Closing Date
1 Jun 2026, 4:00 pmClosed
Executive Engineer
Executive Engineer PWD Building division kalpetta
Wayanad Development Package-Wayanad D e v e l o p m e n t P a c k a g e 2 0 2 4 - 2 0 2 5 - Construction of School Building at Govt. L.P School ,Peechamcode,Vellamunda G.P- WORK-Composite Work
2026_PWD_852858_1
PWD/BLDG/1227/2026-2027
Open Tender
Civil Works - Buildings
Percentage
540 days
peechamkode
Please refer Tender documents.
8 documents required · 8 mandatory
₹9,759
₹1 L
Yes
3 Jun 2026
25 May 2026
3 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DETAILED ESTIMATE(Civil work) | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | 335.74 | ₹335.4 |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 1 | cum | 122.28 | ₹122.16 |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | 7,404.03 | ₹7,396.63 |
| 1.004 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cum | 7,787.26 | ₹7,779.47 |
| 1.005 | OD331250/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note: Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable and less usage of cement is recoverable. All work above plinth level upto floor V level | 0.6 | cum | 11,733.61 | ₹7,028.43 |
| 1.006 | OD331251/2025-2026:Providing and laying in position machine batched and machine mixed design mix M- 25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note: Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable and less usage of cement is recoverable. All work up to plinth level | - | cum | 9,834.75 | - |
| 1.007 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | 360.41 | ₹360.05 |
| 1.008 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | sqm | 783.63 | - |
| 1.009 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 0.2 | sqm | 941.31 | ₹188.26 |
stage.html
html • 0.02 MB
finance_1441102.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1441102.xls
BOQ • 0.63 MB
viewsbd.pdf
Tender Documents • 25.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .