| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.4 CrAccepted-AOC 0 BAGHI NAUGARH NAUGARH CHANDAULI UTTAR PRADESH 232111 | CHANDAULI | UTTAR PRADESH | 232111 | ₹1.4 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.4 Cr+₹52,183.90 (0.37%)Rejected-Finance GONDA | UTTAR PRADESH | 271305 | ₹1.4 Cr+₹52,183.90 (0.37%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹1.5 Cr+₹8.0 L (5.73%)Rejected-Finance | ₹1.5 Cr+₹8.0 L (5.73%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹1.5 Cr+₹8.4 L (5.97%)Rejected-Finance | ₹1.5 Cr+₹8.4 L (5.97%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹1.5 Cr+₹14.5 L (10.4%)Rejected-Finance VILLAGE BASIA POST SAHJANWAN THANA SAHJANWAN DISTRICT GORAKHPUR UTTAR PRADESH PIN 273209 | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273209 | ₹1.5 Cr+₹14.5 L (10.4%) | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | M/S PRAKASH CONSTRUCTION L6 | M/S BHAGWATI TRADERS L7 | APS CONSTRUCTION L8 | M/S K. K. CONSTRUCTION L3 | M/S Damyanti Singh L5 | M/ S A P SHUKLA AND COMPANY L2 | M/S BABA TRADERS L4 | RAM NARAYAN YADAV L9 | AKANKSHA ASSOCIATES L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Supply of Hume Pipe | ||||||||||||
| 1.01 | E/W in excavation of foundation in all types of soil including all leads, lifts and proper disposal and back filling as per direction of E/I including cost of T&P & labour etc required for proper completion of work. | 4,189.52 | M3 | 90 ₹3,77,056.8 | 90.89 ₹3,80,785.47 | 112 ₹4,69,226.24 | 72 ₹3,01,645.44 | 80 ₹3,35,161.6 | 60 ₹2,51,371.2 Lowest | 75 ₹3,14,214 | 126.5 ₹5,29,974.28 | 92.23 ₹3,86,399.43 |
| 1.02 | Centering & shuttering of C.C & RCC work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, scaffolding, T&P & labour etc. | 3,024.07 | M2 | 650 ₹19,65,645.5 | 504 ₹15,24,131.28 | 770 ₹23,28,533.9 | 450 ₹13,60,831.5 | 590 ₹17,84,201.3 | 200 ₹6,04,814 Lowest | 500 ₹15,12,035 | 770 ₹23,28,533.9 | 499.3 ₹15,09,918.15 |
| 1.03 | Cutting, bending , placing and binding TMT steel bar for Reinforcement with cost of binding wire required for proper completion of work including cost of all material, T&P & labour etc. | 6.92 | MT | 65,000 ₹4,49,800 | 65,122 ₹4,50,644.24 | 65,600 ₹4,53,952 | 61,500 ₹4,25,580 | 58,100 ₹4,02,052 | 58,000 ₹4,01,360 | 67,000 ₹4,63,640 | 65,600 ₹4,53,952 | 50,014.5 ₹3,46,100.34 Lowest |
| 1.04 | Laying C.C.A20 - M-15 with cement (OPC 43 grade),coarse sand of FM not less than 2 and crushed stone grit size 4.75 to 20mm including lead upto 60m, lift upto 3m,mechanical mixing & mechanical vibration but excluding cost of centering & shuttering required for proper completion of work including cost of all material, T&P & labour etc. | 1,055.8 | M3 | 9,200 ₹97,13,360 | 9,836.71 ₹1,03,85,598.42 | 10,000 ₹1,05,58,000 | 8,900 ₹93,96,620 | 9,100 ₹96,07,780 | 9,100 ₹96,07,780 | 9,000 ₹95,02,200 | 10,292 ₹1,08,66,293.6 | 7,845.59 ₹82,83,373.92 Lowest |
| 1.05 | E/W in filling in all types of soil including all leads, lifts and proper disposal and back filling as per direction of E/I including cost of T&P & labour etc required for proper completion of work. | 1,120 | M3 | 150 ₹1,68,000 | 99.67 ₹1,11,630.4 Lowest | 190 ₹2,12,800 | 110 ₹1,23,200 | 160 ₹1,79,200 | 110 ₹1,23,200 | 150 ₹1,68,000 | 194.5 ₹2,17,840 | 147.88 ₹1,65,625.6 |
| 1.06 | Earth work in removing obstruction for channelisation of drains with dressing including hard clay,charri bajri upto 5% lead upto 30 meters, lift upto 3meters excluding mechnical compaction but inclusive of manual compaction as per direction of E/I including cost of T&P & labour etc required for proper completion of work. | 3,484.25 | M3 | 70 ₹2,43,897.5 | 50.76 ₹1,76,860.53 | 70 ₹2,43,897.5 | 50 ₹1,74,212.5 | 65 ₹2,26,476.25 | 35 ₹1,21,948.75 Lowest | 60 ₹2,09,055 | 76.8 ₹2,67,590.4 | 56.41 ₹1,96,546.54 |
| 1.07 | Providing and laying inverted filter with 1 layer of coarse sand of F.M. not less than 2.0 and 1 layer each of 4.75 to 10 mm and 10 to 20 mm size crushed stone grit (granite) including cost of all material, T.& P., labour etc. required for proper completion of work. | 600.07 | M3 | 3,100 ₹18,60,217 | 4,829.28 ₹28,97,906.05 | 5,100 ₹30,60,357 | 4,150 ₹24,90,290.5 | 3,625 ₹21,75,253.75 | 4,250 ₹25,50,297.5 | 3,000 ₹18,00,210 Lowest | 5,160.76 ₹30,96,817.25 | 3,925.85 ₹23,55,784.81 |
| 1.08 | Dewatering with all cost of power/POL machine, pump, well point system & operator etc with assembling & dismantling of equipments etc required for proper completion of work. | 28,064.52 | KWH | 40 ₹11,22,580.8 | 34.77 ₹9,75,803.36 | 40 ₹11,22,580.8 | 20 ₹5,61,290.4 | 27.5 ₹7,71,774.3 | 15 ₹4,20,967.8 Lowest | 32 ₹8,98,064.64 | 41.5 ₹11,64,677.58 | 28 ₹7,85,806.56 |
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
10 Sept 2025, 1:00 pmClosed
SUPERINTENDING ENGINEER
RAPTI NAHAR NIRMAN MANDAL-1, BALRAMPUR
As Per Tender Notice
2025_UPIDC_1063821_4
02/SE/2025-26
Open Tender
Civil Works
Item Rate
90 days
Siddarthnagar
As Per Tender Notice
2 documents required · 2 mandatory
₹2,354
₹3.8 L
Yes
20 Nov 2025
12 Aug 2025
10 Sept 2025
12 Aug 2025
10 Sept 2025
12 Aug 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .