Executive Engineer, P.H.Works Division Porbandar
Construction of Compound wall at Paswari Well Headwork under M&R Kutiyana Group
322844
04/2026-2027
Open
Civil Works - Water Works
Porbandar
8 documents required · 8 mandatory
₹600
Executive Engineer P.H. Works Division, Porbandar
₹2,220
11 Jul 2026
11 Jul 2026
11 Jul 2026
27 Jul 2026
11 Jul 2026
Name of Work: Construction of Compound wall at Paswari Well Headwork under M&R Kutiyana Group
Sr. No. Item Net Amount
SCHEDULE B- Providing, Installing and Comissioning of Chlorination
Plant & Construction of Pump House At Different Headworks Of
Kutiyana RWSS Under M&R Kutiyana
PH WORKS DN, GWS & SB PORBANDAR
TA-Kutiyana Dist.-Porbandar
Name of work: Construction of Compound wall at Paswari Well Headwork under M&R Kutiyana Group
Memorandum showing the approximate quantities for Item of works to be carried out for the above work
Approximate amount put to tender Rs.
Quantity Unit Items Rate Rate in Words Amount
Excavation for foundation up to 1.5 M Depth including sorting
out and stacking of useful materials and disposal of the
excavated stuff up to 50 meter lead(R&B SOR 2024-25 P.No.67,
Itm. Code-04001A)
Rupees One Hundred
17.92 Cum. (A) In all sorts of soil and soft murrum 127.5 Twenty Seven & Paise Fifty
Rupees Two Hundred
4.48 Cum. (B) In hard murrum, boulders incl. macadam road. 277.04 Seventy Seven & Paise Four
0 Cum. (C) In Soft Rock and/or Masonary in CM or LM or Lime Concrete Paise only
(D) In hard rock and / or in C. C. 1:2:4 or RCC with blasting and
0 Cum. Paise only
chiseling or by chiseling only.
Providing and laying cement concrete 1:5:10 (1 Cement :
coarse and : 10 hand broken stone aggregate 40 mm Rupees Two Thousand Six
2.40 Cum. nominal size) and curing complete excluding cost of form 2603.71 Hundred Three & Paise
work in (a)foundation (R&B SOR 2024-25 P.No.73, Seventy One only
Itm.Code-05006A)
Coursed rubble masonry with hard stone of approved
Rupees Three Thousand
quality in foundation and plinth in cement mortar 1:6 (1
17.00 Cum. 3455.32 Four Hundred Fifty Five &
cement 6 course sand )etc complete.(R&B SOR 2024-25
Paise Thirty Two only
P.No.92, Itm. Code-07004A)
White Stone Bela mesonry block In course in
superstructure with stone of approved quality in Lime Rupees Six Thousand Four
10.32 Cum. Mortar1:6(1-Cement:6-course sand) including packing the 6459.42 Hundred Fifty Nine & Paise
joints etc. complete.(R&B SOR 2024-25 P.No.93, Itm. Forty Two only
C.C. M-20 (without w.p.chemical)
Providing and casting in situ C.C. in grade M-20
(proportions as per mix design or as per table9 of IS456
2000 in masses by weigh batching) using granite, quartzite
trap metal of size 6 mm to 20 mm for RCC work, including
scaffolding centering. formwork, needle vibrated Rupees Six Thousand
0.87 Cum. consolidation, curing complete up to 6 meter depth or 6722.00 Seven Hundred Twenty Two
height (excluding cost of reinforcement and neat finishing) only
with centering and shuttering/deshuttering etc. complete
(GWSS SOR 2022-23 P.No.43, Itm. No.-4) (4).Ring beam
Quantity Unit Items Rate Rate in Words Amount
Supplying cutting, bending, binding and placing in position
steel as per plan and design and as per ISS
including cost of steel andbinding wire for Rupees Seventy Three
0.114 MT reservoirs/structures only including lift up to meter height 73208.00 Thousand Two Hundred
or depth below G.L. for all diameters. Thermo Eight only
mechanically treated (TMT)bars Fe-415 grade for all
diameters.( GWSSB SOR 2022-23 I.No.9.2 P.No.45)
20 mm thick sand faced cement plaster on walls up to
height 10 metres above ground level consisting of 12 mm
Rupees Three Hundred
thick backing coat of C.M.1:3 (1-cement:3-sand)and 8mm
219.23 Sq.m. 327.45 Twenty Seven & Paise Forty
thick finishing coat of C.M. 1:1(1-cement :1-sand) etc.
complete.(R&B SOR 2024-25 P.No.137, Itm. Code-17009)
I am/ we are willing to carry out the work at …………………………………… above/ below (In
All the Items of work shall be carried out as per the PWD handbook volume-I & II (latest addition) and other specification of division as
All the column in schedule shall be filled in ink and the total of the entries in the last column shall be struck of by the contractor under his
Rates quoted shall be for the completed Item of work etc shall be include clearance of site (prior to commesement of work its close) in all
respects and hold goods for work under all conditions at site I.e. moisture weather.
The amount recoverable from the contractor by the Gujarat water supply and sewerage Board on any account shall be liable to be recovered
from the amount payable to the contractor /suppliers.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
schedule A.pdf
schedule B.pdf
specification paswari wall.pdf
VOL 1 A Tech Bid 01.pdf
GCC Paswari compound wall.pdf
NIT.pdf
Undertaking.pdf