Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.0 LAdmitted-Finance 578 AVAS VIKAS JANAKPURI B IZATNAGAR BAREILLY 243122 UP | BAREILLY | UTTAR PRADESH | 243122 | ₹78.0 L | L1 | Admitted-Finance |
| 2 | L2₹87.2 L+₹9.2 L (11.8%)Admitted-Finance 160 PREM NAGAR BAREILLY | ₹87.2 L+₹9.2 L (11.8%) | L2 | Admitted-Finance |
| 3 | L3₹89.9 L+₹11.9 L (15.2%)Admitted-Finance 232 1 D SHIVLOK KANKARKHERA DISTT MEERUT UP PIN 250001 | MEERUT | MEERUT | UP | 250001 | ₹89.9 L+₹11.9 L (15.2%) | L3 | Admitted-Finance |
| 4 | L4₹90.4 L+₹12.4 L (15.9%)Admitted-Finance PILIBHIT BYE PASS NEAR GURUNG GAS GODOWN BAREILLY UP 243001 | BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | ₹90.4 L+₹12.4 L (15.9%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | UTTRAKHAND BUILDERS L1 | Builders Harpal L2 | Shikhar ji Enterprises L3 | Garg Construction L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster including racking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer - in - Charge. | 1,874 | Sqm | 17 ₹31,858 | 29 ₹54,346 | 15 ₹28,110 Lowest | 25 ₹46,850 |
| 2.00 | Dismantling, floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises | 936.06 | Sqm | 15 ₹14,040.9 Lowest | 27 ₹25,273.62 | 25 ₹23,401.5 | 25 ₹23,401.5 |
| 3.00 | Dismantling of stone slabs and tiles of any description or thickness in floors, aprons Laid, bedded and pointed in any mortar etc. | 12.9 | 10 Sqm | 200 ₹2,580 Lowest | 200 ₹2,580 Lowest | 200 ₹2,580 Lowest | 200 ₹2,580 Lowest |
| 4.00 | Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove. | 255 | Sqm | 4 ₹1,020 Lowest | 5 ₹1,275 | 10 ₹2,550 | 15 ₹3,825 |
| 5.00 | Demolition of cement concrete (un-reinforced) in ground floors and pavings not exceeding 15 cm thickness below or above ground level complete all as specified and directed by Engineer-in-Charge. | 13.3 | Cum | 150 ₹1,995 Lowest | 600 ₹7,980 | 200 ₹2,660 | 200 ₹2,660 |
| 6.00 | Demolition of brick work or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars etc but excluding ashlar facing dressed stone work and precast concrete articles complete all as specified and directed by Engineer-in-Charge. | 20 | Cum | 150 ₹3,000 Lowest | 600 ₹12,000 | 200 ₹4,000 | 200 ₹4,000 |
| 7.00 | Demolition of concrete of any description and in any position not otherwise specifically provided for | 40 | Cum | 200 ₹8,000 Lowest | 550 ₹22,000 | 200 ₹8,000 Lowest | 200 ₹8,000 Lowest |
| 8.00 | Taking down chowkats or frames not exceeding 1.5 Sqm each with shutter (without taking off shutter from the frame) complete all as specified and directed by Engineer-in-Charge. | 64 | Each | 140 ₹8,960 | 150 ₹9,600 | 100 ₹6,400 Lowest | 100 ₹6,400 Lowest |
| 9.00 | Taking down chowkats or frames exceeding 1.5 Sqm but not exceeding 4 Sqm each with shutter (without taking off shutter from the frame) complete all as specified and directed by Engineer-in-Charge. | 54 | Each | 160 ₹8,640 | 200 ₹10,800 | 150 ₹8,100 Lowest | 150 ₹8,100 Lowest |
| 10.00 | Taking down shutter of any description exc. 1 sqm but n.exc 2 sqm each and removing from site complete all as specified and directed by Engineer-in-Charge. | 56 | Each | 15 ₹840 Lowest | 60 ₹3,360 | 60 ₹3,360 | 40 ₹2,240 |
Tender Value
₹1.1 Cr
EMD Value
₹1.8 L
Closing Date
24 Aug 2026, 6:00 pmClosed
CWE Bareilly
HEADQUARTERS, COMMANDER WORKS ENGINEER, MILITARY ENGINEER SERVICES, STATION ROAD, BAREILLY CANTT, PIN 243001
CA NO.CWE BLY/GE (E)/26 OF 2026- 2027SPECIAL REPAIRS TO BLDG NO. T-173 (01 TO 08) AND P-174 (01 TO 08) MD ACCN AT MTTC AREA OF 506 ASC UNDER GE (EAST) BAREILLY
2026_MES_779757_1
8200/B/939/E8
Open Tender
Civil Works
Item Rate
270 days
Bareilly
As per NIT
6 documents required · 6 mandatory
₹1,000
GE (East) Bareilly
₹1.8 L
Yes
5 Sept 2026
20 Jul 2026
31 Aug 2026
20 Jul 2026
24 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down cement plaster including racking out joints, hacking for key & scrubbing down with water etc complete all as specified and directed by Engineer - in - Charge. | 1,874 | Sqm | -1 | - |
| 2 | Dismantling, floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises | 936.06 | Sqm | -1 | - |
| 3 | Dismantling of stone slabs and tiles of any description or thickness in floors, aprons Laid, bedded and pointed in any mortar etc. | 12.9 | 10 Sqm | -1 | - |
| 4 | Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove. | 255 | Sqm | -1 | - |
| 5 | Demolition of cement concrete (un-reinforced) in ground floors and pavings not exceeding 15 cm thickness below or above ground level complete all as specified and directed by Engineer-in-Charge. | 13.3 | Cum | -1 | - |
| 6 | Demolition of brick work or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars etc but excluding ashlar facing dressed stone work and precast concrete articles complete all as specified and directed by Engineer-in-Charge. | 20 | Cum | -1 | - |
| 7 | Demolition of concrete of any description and in any position not otherwise specifically provided for | 40 | Cum | -1 | - |
| 8 | Taking down chowkats or frames not exceeding 1.5 Sqm each with shutter (without taking off shutter from the frame) complete all as specified and directed by Engineer-in-Charge. | 64 | Each | -1 | - |
| 9 | Taking down chowkats or frames exceeding 1.5 Sqm but not exceeding 4 Sqm each with shutter (without taking off shutter from the frame) complete all as specified and directed by Engineer-in-Charge. | 54 | Each | -1 | - |
| 10 | Taking down shutter of any description exc. 1 sqm but n.exc 2 sqm each and removing from site complete all as specified and directed by Engineer-in-Charge. | 56 | Each | -1 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_873388.xls
BOQ • 0.35 MB
PS_26.pdf
Tender Documents • 2.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .