Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹25.2 L
Closing Date
30 Jun 2026, 10:00 am
Superintending Engineer 4th Circle HPPWD Shimla
Superintending Engineer 4th Circle HPPWD Shimla
C/O R.O.F.D., Protection Work, Cross Drainage Work, Road Side Drain, Metalling and Tarring, Road Furniture and Dumping Structure in km 0/000 to 11/970
2026_PWD_136366_1
SE-IV-PWD-Tender-NABARD-26- 3240-60 dt 10-06-2026 dt 2-6-26
Open Tender
Civil Works
540 days
Shimla
AS per SBD
22 documents required · 22 mandatory
₹20,000
₹25.2 L
12 Jun 2026
12 Jun 2026
30 Jun 2026
12 Jun 2026
30 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation in hilly area in all heights and depths and in all kind of soil by manual/mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/wedging out of rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, cutting and trimming of side slopes to level as shown in the drawing and as directed by engineer-in-charge at site according to the MORD 2014 technical specification Clause 1603.1, 1603.2 section 1600 and sorting out useful materials and stacking the same in all leads, lifts in acquired width of road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour if required. Recovery of stones that tune of 3510.07 Cum quantity ( Three thousand five hundred ten point zero seven) cubic metres at the rate of 300/- (Rupees three hundred ) per cubic metre quantity shall be effected from the contractor's running bills on pro-rate basis as per actual quantity executed. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. The rates are i.c. all taxes imposed by the Govt. (but excluding GST) | 87,553.83 | Per Cubic Meter | 141.56 | ₹1,23,94,120.17 | BI01010001010000000000000515BI0100001113 |
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government but excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | 3,713.12 | Per Cubic Meter | 93.15 | ₹3,45,877.13 | BI01010001010000000000000515BI0100001119 |
| 3Earth work in excavation for all type of road structure such as retaining walls,Breast walls,culverts,drainds and parapets etcetra. in all types of classification of soil comprising of ordinary soil ,ordinary rock and hard rocks, chiselling/wedging out of rock (where blasting is prohibited) as per drawing and MORD 2014 Technical specifications Clause 305, 1101.4, 1603.4 section 300 & 1600 and as per direction of Engineer in Charge including setting out, shoring and bracing, removal of stumps and other deleterious material and disposal of material up to any lead and upto any lift, including dressing of sides and bottom and back filling in trenches with excavated suitable material to the orignal surface in layers not exceeding 150 mm (one hundred fifty milimeters) compected thickness including sorting and sturting and pumping and bailing out water (surface and sub soil water) up to all depth or any quantum of water including cleaning of slush which may arise out during dewatering . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government but excluding GST, including hauling of materials in all leads and lifts as per entire satisfaction and direction of Engineer-in- Charge. | ||||||
| 3.1 | Protection Work | 1,190.62 | Per Cubic Meter | 504.15 | ₹6,00,251.07 | BI01010001010000000000000515BI0100001122 |
| 3.2 | RCC Slab Culvert | 392.44 | Per Cubic Meter | 504.15 | ₹1,97,848.63 | BI01010001010000000000000515BI0100001123 |
| 3.3 | RCC Box Culvert | 738.75 | Per Cubic Meter | 504.15 | ₹3,72,440.81 | BI01010001010000000000000515BI0100001124 |
| 3.4 | Road Side Drain | 451.78 | Per Cubic Meter | 504.15 | ₹2,27,764.89 | BI01010001010000000000000515BI0100001125 |
| 3.5 | Crash Barrier | 97.69 | Per Cubic Meter | 504.15 | ₹49,250.41 | BI01010001010000000000000515BI0100001126 |
| 3.6 | Parapets | 37.21 | Per Cubic Meter | 504.15 | ₹18,759.42 | BI01010001010000000000000515BI0100001127 |
| 3.7 | Dumping Structure | 150 | Per Cubic Meter | 504.15 | ₹75,622.5 | BI01010001010000000000000515BI0100001128 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.12 MB
SBD1179000SE.pdf
Tender Documents • 8.98 MB
BOQ_201813.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid