Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BUILDING NO 430 A PLOT NO 11 25 BADHALWADI MAWAL TALEGAON MIDC PUNE PUNE MAHARASHTRA 411045 | PUNE | MAHARASHTRA | 411045 | Admitted-Finance |
| 2 | Admitted-Finance 2 REGENT AVENUE DIWALIPURA VASNA ROAD VADODARA GUJARAT 390007 UDYAM GJ 24 0003773 24AAGCG8907M1Z7 R M MII STATUS AS NOT VERIFIED | VADODARA | GUJARAT | 390007 | Admitted-Finance |
| 3 | Admitted-Finance PLOT NO 66 67 SECTOR 58 FARIDABAD HARYANA 121004 | FARIDABAD | HARYANA | 121004 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
23 Jun 2020, 12:30 pmClosed
Mr. Puneet Khanna (Head-Supply Chain Management)
Worley India Private Limited, (formerly Jacobs Engineering India Private Limited) New Energy House, Ramakrishna Mandir Road, Kondivita, Andheri (East), Mumbai-400 059, India
PROCESS STREAM ANALYZER - MOISTURE
2020_REFHQ_116851_1
44AD0600-ER-64-0150
Limited
Instrumentation-Goods
Supply
150 days
IOCL, GUJARAT REFINERY
3 documents required · 3 mandatory
Exempted
13 Nov 2020
11 May 2020
24 Jun 2020
11 May 2020
23 Jun 2020
25 May 2020
SUPPLY OF PROCESS STREAM ANALYZER - MOISTURE
Moisture Analyzer with Probe, Sensor Assembly, Analyzer Transmitter, Rotameter (2071-FIF-1206), Thermal Mass Flow switch (2071-FSL-1207), Sample take-off and return assembly, Panel for Sample Cell Assembly. + A) Consider Cost of Calibration of 2 Probes after every Six months for a period of 2 year from the date of commissioning. + B) factory inspection and acceptance tests, certificates + C) Site Acceptance Tests
Moisture Analyzer with Probe, Sensor Assembly, Analyzer Transmitter, Rotameter (2071-FIF-1302), Thermal Mass Flow switch (2017-FSL-1303), Sample take-off and return assembly, Panel for Sample Cell Assembly. + A) Consider Cost of Calibration of 2 Probes after every Six months for a period of 2 year from the date of commissioning. + B) factory inspection and acceptance tests, certificates + C) Site Acceptance Tests
Description of Work / Item(s)
SUPPLY OF PROCESS STREAM ANALYZER - MOISTURE
Moisture Analyzer with Probe, Sensor Assembly, Analyzer Transmitter, Rotameter (2071-FIF-1206), Thermal Mass Flow switch (2071-FSL-1207), Sample take-off and return assembly, Panel for Sample Cell Assembly. + A) Consider Cost of Calibration of 2 Probes after every Six months for a period of 2 year from the date of commissioning. + B) factory inspection and acceptance tests, certificates + C) Site Acceptance Tests
Moisture Analyzer with Probe, Sensor Assembly, Analyzer Transmitter, Rotameter (2071-FIF-1302), Thermal Mass Flow switch (2017-FSL-1303), Sample take-off and return assembly, Panel for Sample Cell Assembly. + A) Consider Cost of Calibration of 2 Probes after every Six months for a period of 2 year from the date of commissioning. + B) factory inspection and acceptance tests, certificates + C) Site Acceptance Tests
Description of Work / Item(s)
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.01 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.02 OF BOQ1
Description of Work / Item(s)
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.01 OF BOQ2
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.02 OF BOQ2
Description of Work / Item(s)
CHARGES FOR SITE SUPERVISION OF ERECTION,PRE-COMMISSIONING / COMMISSIONING OF ALL SUPPLIES AS PER MR. Refer Annexure-F of ITB for Terms & conditions for Site Supervision Services and Training for Indian bidders.
For Tag No. 2071-AT-1201 & 2071-AT-1301 : Moisture Analyzer : Total 16 (8 + 8) Mandays estimated for site supervision of Erection, Testing & Commissioning. Total : 16 Man-Days
Per diem charges (per person) for 8 hours work on normal working days.
Overtime rate / hour beyond normal 8 hours work on normal working days.
Overtime rate / hour for work on weekly off days/ holidays (as applicable to Refinery site).
TRAINING FOR OWNER PERSONNEL AT SITE (Tag#2071-AT-1201 & 2071-AT-1301 ) Total : 05 Mandays
Per diem charges (per person) for 8 hours work on normal working days.
Description of Work / Item(s)
CHARGES FOR SITE SUPERVISION OF ERECTION,PRE-COMMISSIONING / COMMISSIONING OF ALL SUPPLIES AS PER MR. Refer Annexure-G of ITB for Terms & conditions for Site Supervision Services and Training for Indian bidders.
For Tag No. 2071-AT-1201 & 2071-AT-1301 : Moisture Analyzer : Total 16 (8 + 8) Mandays estimated for site supervision of Erection, Testing & Commissioning. Total : 16 Man-Days
Per diem charges (per person) for 8 hours work on normal working days.
Overtime rate / hour beyond normal 8 hours work on normal working days.
Overtime rate / hour for work on weekly off days/ holidays (as applicable to Refinery site).
TRAINING FOR OWNER PERSONNEL AT SITE (Tag#2071-AT-1201 & 2071-AT-1301 ) Total : 05 Mandays
Per diem charges (per person) for 8 hours work on normal working days.
Description of Work / Item(s)
Charges for Post Warranty Annual Maintenance Contract
COMPREHENSIVE POST WARRANTY ANNUAL MAINTENANCE CONTRACT FOR 5 YEARS AFTER COMPLETION OF WARRANTY PERIOD. (AS DETAILED IN “TECHNICAL REQUIREMENTS FOR THE SUPPLY OF PROCESS STREAM ANALYZER - MOISTURE ”
PWCAMC for 1st YEAR
PWCAMC for 2nd YEAR
PWCAMC for 3rd YEAR
PWCAMC for 4th YEAR
PWCAMC for 5th YEAR
Description of Work / Item(s)
Charges for Post Warranty Annual Maintenance Contract
COMPREHENSIVE POST WARRANTY ANNUAL MAINTENANCE CONTRACT FOR 5 YEARS AFTER COMPLETION OF WARRANTY PERIOD. (AS DETAILED IN “TECHNICAL REQUIREMENTS FOR THE SUPPLY OF PROCESS STREAM ANALYZER - MOISTURE ”
PWCAMC for 1st YEAR
PWCAMC for 2nd YEAR
PWCAMC for 3rd YEAR
PWCAMC for 4th YEAR
PWCAMC for 5th YEAR
Glotex Solutions Pvt. Ltd
Spectrum Automation and Controls
GE Oil and Gas India Private limited
Spectrum Automation and Controls
Glotex Solutions Pvt. Ltd
GE Oil and Gas India Private limited
Spectrum Automation and Controls
GE Oil and Gas India Private limited
GE Oil and Gas India Private limited
Spectrum Automation and Controls
Glotex Solutions Pvt. Ltd
GE Oil and Gas India Private limited
Spectrum Automation and Controls
GE Oil and Gas India Private limited
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Portion of Quoted Rate in Currency
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
Description of Work / Item(s)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .