Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹7.9 LAccepted-Finance | L 1 | Accepted-Finance L 1 | |
| 2 | L 2₹7.9 L+₹397 (0.05%)Rejected-Finance | L 2 | Rejected-Finance L 2 | |
| 3 | L 3₹8.1 L+₹20,799 (2.63%)Rejected-Finance | L 3 | Rejected-Finance L 3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Documents are not in order. | |
| 5 | Rejected-Technical | - | Rejected-Technical Documents are not in order. |
Tender Value
₹7.9 L
EMD Value
₹15,877
Closing Date
25 May 2026, 1:00 pmClosed
EXECUTIVE ENGINEERS BNED PWDTE
ROOM NO 118 and 119, 1ST FLOOR, PURTA BHAVAN, DF BLOCK, SECTOR I, SALT LAKE, KOLKATA 700 091
Construction of temporary Kitchen shed at open space infront of hostel building within the campus of West Bengal Judicial Academy,Newtown Kolkata 700160 under Bidhannagar East Division, PWDte.
2026_WBPWD_5014145_1
WBPWD/EE/BNED/NIeT-02/26-27
Open Tender
CIVIL WORKS
Percentage
45 days
New Town
Please refer Tender documents.
4 documents required · 4 mandatory
₹15,877
Yes
18 Aug 2026
15 May 2026
28 May 2026
16 May 2026
25 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm | - | cum | 142.2 | - |
| 2 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. | 17.32 | cum | 1,115.78 | ₹19,325.31 |
| 3 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | - | sqm | 430.24 | - |
| 4 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety | 4.46 | cum | 6,384.54 | ₹28,475.05 |
| 5 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approve stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (when the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht shall be allowed under 12 (e) for every 4 m or part thereof)
a. 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-charge. | - | sqm | 399.25 | - |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction
a. For works in foundation and upto roof of ground floor/upto 4 m
i. Tor steel / Mild Steel / SAIL / TATA / RINL
Ground floor | 1 | MT | 65,447.82 | ₹65,382.37 |
| 7 | Controlled Cement concrete with well graded stone chips (20 mm graded nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation. [using concrete mixture]
M 25 Grade (i) Pakur Variety | 1.89 | cum | 7,647.85 | ₹14,454.44 |
| 8 | Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth | 5.5 | cum | 6,397.64 | ₹35,187.02 |
| 9 | Plaster to wall, floor, ceiling etc with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary at ground floor.
i. With 1:6 cement mortar b. 20 mm thick plaster
Gr. floor | 22 | sqm | 204.67 | ₹4,502.74 |
| 10 | Supplying,fitting & fixing of 2-Track / 3-Track Aluminium sliding Window of all Aluminium sections viz. window frame (top,bottom & side frame), shutter (top, bottom, side & interlock member) made of aluminium alloy extrusions conforming to IS 733-1983 & IS 1285-1975, annodised conforming to IS 1868-1983, fitted with all other accessories viz. PVC roller, EPDM gasket, maruti lock, screws etc. including labour charges for fitting & fixing of aluminium 2-track/3-track sliding window with fixing of glass (excluding cost of glass) all complete as per architectural drawings and direction of Engineer-in-charge. 10-12 Micron thickness Annodizing film Natural white | 39 | kg | 533.93 | ₹20,823.27 |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_5082101.xls
BOQ • 0.32 MB
2911ii.pdf
Additional Documents • 0.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .