Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.6 Cr Vertical extension on existing G plus 4 floor Bharat Rantna Abdul Kalam Boys Hostel Building RCC framed Structure from 5 to 9 floor completion of hostel rooms, etc, in IIITDM Kurnool Andhra Pradesh | Vertical extension on existing G plus 4 floor Bharat Rantna Abdul Kalam Boys Hostel Building RCC framed Structure from 5 to 9 floor completion of hostel rooms, etc, in IIITDM Kurnool Andhra Pradesh | ₹7.6 Cr | L1 | - |
| 2 | L2₹8.2 Cr+₹60.3 L (7.89%)Financial bid opened Vertical extension on existing G plus 4 floor Bharat Rantna Abdul Kalam Boys Hostel Building RCC framed Structure from 5 to 9 floor completion of hostel rooms, etc, in IIITDM Kurnool Andhra Pradesh | Vertical extension on existing G plus 4 floor Bharat Rantna Abdul Kalam Boys Hostel Building RCC framed Structure from 5 to 9 floor completion of hostel rooms, etc, in IIITDM Kurnool Andhra Pradesh | ₹8.2 Cr+₹60.3 L (7.89%) | L2 | Financial bid opened |
| 3 | L3₹8.7 Cr+₹1.1 Cr (14.2%) Vertical extension on existing G plus 4 floor Bharat Rantna Abdul Kalam Boys Hostel Building RCC framed Structure from 5 to 9 floor completion of hostel rooms, etc, in IIITDM Kurnool Andhra Pradesh | Vertical extension on existing G plus 4 floor Bharat Rantna Abdul Kalam Boys Hostel Building RCC framed Structure from 5 to 9 floor completion of hostel rooms, etc, in IIITDM Kurnool Andhra Pradesh | ₹8.7 Cr+₹1.1 Cr (14.2%) | L3 | - |
| 4 | L4₹10.0 Cr+₹2.3 Cr (30.4%)Financial bid opened Vertical extension on existing G plus 4 floor Bharat Rantna Abdul Kalam Boys Hostel Building RCC framed Structure from 5 to 9 floor completion of hostel rooms, etc, in IIITDM Kurnool Andhra Pradesh | Vertical extension on existing G plus 4 floor Bharat Rantna Abdul Kalam Boys Hostel Building RCC framed Structure from 5 to 9 floor completion of hostel rooms, etc, in IIITDM Kurnool Andhra Pradesh | ₹10.0 Cr+₹2.3 Cr (30.4%) | L4 | Financial bid opened |
| 5 | - | - | - | - |
Tender Value
₹10.7 Cr
EMD Value
₹20.7 L
Closing Date
27 Oct 2025, 3:00 pmClosed
EE-Kurnool Central Division
Executive Engineer
O/o. Executive Engineer, Kurnool Central Division, CPWD, IIITDM Kurnool Campus, Jagannatha Gattu, G.
Vertical extension on existing G plus 4 floor Bharat Rantna Abdul Kalam Boys Hostel Building RCC framed Structure from 5 to 9 floor completion of hostel rooms, etc, in IIITDM Kurnool Andhra Pradesh
129770
13/EE/KURNOOL/e-tender/2025-2026
OPEN
Civil Works - Buildings
ICB
300 days
Kurnool, Andhra Pradesh
9 documents required · 9 mandatory
₹20.7 L
O/o Executive Engineer, CPWD, Kurnool 518008
27 Oct 2025
13 Oct 2025
27 Oct 2025
27 Oct 2025
22 Oct 2025
22 Oct 2025
stage.html
html • 0.07 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
PN+13+.pdf
document • 0.78 MB
NIT+13+Vertical+Extension+Bidg.pdf
document • 12.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .