Executive Engineer, EDD, Almora
EDD Almora, Laxmeshwar, Almora
Replacement of 11 KV MES feeder and new 11 KV line construction to add TF for 11 KV Cantt and 11 KV AIR Feeder
2021_UPCL9_40288_1
83/2021-22/EDD(A)
Open Tender
Electrical Works
Item Wise
365 days
Almora
As per tender document
2 documents required · 2 mandatory
₹590
Executive Engineer, EDD, Almora
₹15,600
16 Mar 2022
18 Dec 2021
7 Jan 2022
18 Dec 2021
6 Jan 2022
24 Dec 2021
Amount
Cartage of SP-55 Pole from Store Centre Almora to contruction site including loading & unloading at both points and proper stocking.(distance 7 Km.)
Cartage of SP-23 Pole from Store Centre Almora to contruction site including loading & unloading at both points and proper stocking.(distance 7 Km.)
Cartage of Small Material from Store Centre Almora to contruction site including loading & unloading at both points and proper stocking.(distance 7 Km.)
Head load cartage of SP-55 Pole from road to site.(lead distance-0.5 Km.)
Head load cartage of SP-23 Pole from road to site.(lead distance-0.5 Km.)
Head load cartage of Small Material from road to site.(lead distance-0.5 Km.)
Fabrication of MS channel/Angle iron after cutting in required sizes with drilling of holes upto good finish for tp channel, bracing and special type braket etc. as per RESPO schedule and local approved drawing.
Excavation of earth for pole pit of size 0.9X0.6X1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work.
Erection of SP-55 Pole in place of dismantled Single pole in proper level and alignment alongwith fixing of accessories like Top Channel & clamps as per RESPO constructio manual.
Erection of SP-23 Pole in place of dismantled Single pole in proper level and alignment alongwith fixing of accessories like Top Channel & clamps as per RESPO constructio manual.
Grouting of pole in size 0.45X0.45X1/9 of the support in CC ratio 1:4:8 (1 cement,4 graded stone 20 mm nominal size,8 coarse sand) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment,leveling as per RESPO construction manual
Muffing of pole size 45 cm X 60 cm radius with CC 1:3:6 (1 cement,3 coarse sand and 6 graded stone 10 mm nominal size 45 cm height from ground level including cost of cement, sand and stone etc.
Laying, spreading, stringing and sagging of dismantled 02 nos. of Double Pole of11 KV line in 3 phase (3 phase 4 wire) of following wire as phase wireof GI earth wire complete including fixing of all accessories in 03 no. conductor in parallel with binding and jumpering as per profile and sagging chart.
Guarding of line over telephone/road/LT linecrossing as per drawing with 4mm/8 SWG GI wire including fixing of guarding channel/angle as per RESPO mannual. 11 KV.
M/S HARINANDAN JOSHI
GURUKRIPA ENGINEERS AND CONTRACTORS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .