Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC | ₹13.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.7 L+₹51,412.24 (3.89%)Rejected-Finance | ₹13.7 L+₹51,412.24 (3.89%) | L2 | Rejected-Finance L2 |
| 3 | L3₹14.0 L+₹79,042.89 (5.97%)Rejected-Finance | ₹14.0 L+₹79,042.89 (5.97%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically not qualified |
Tender Value
₹13.7 L
EMD Value
₹27,493
Closing Date
12 Jun 2026, 12:00 pmClosed
EE,JHD
Nayabasti,Jalpaiguri
Emergent repairing and maintenance of protection work of Dharaikuri river bridge of Mallickhat Sitapara road at km 2.20
2026_WBPWD_5014388_1
WBPWD/EE/JHD/eNIT-01/26-27
Open Tender
CIVIL WORKS
Percentage
60 days
Dhupguri
Please refer Tender documents.
3 documents required · 3 mandatory
₹27,493
Yes
20 Aug 2026
23 May 2026
15 Jun 2026
23 May 2026
12 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specifications Clause 201 for Rural Roads of MORD.
By Manual Means | 0.16 | Hect. | 11,868 | ₹1,898.88 |
| 2 | Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .
In all sorts of soil excluding marshy soil & rocks
(soft or hard) by manual means.
upto 3 m depth
With pumping out water excluding shoring | 478.72 | Cum. | 123 | ₹58,882.56 |
| 3 | Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. | 139.14 | Cum. | 2,370.4 | ₹3,29,817.46 |
| 4 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 17.6 | Sqm. | 233.7 | ₹4,113.12 |
| 5 | Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge. | 29.7 | Cum. | 1,267.11 | ₹37,633.17 |
| 6 | Weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including cost of supply of G.I. wire. (With 100mm x 100mm mesh.) | 47.7 | Sqm. | 201 | ₹9,587.7 |
| 7 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
Use River Bazree | 39.03 | Cum. | 3,821.68 | ₹1,49,160.17 |
| 8 | Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications.
PCC Grade M20
Use NB variety stone materials | 71.72 | Cum. | 4,924.45 | ₹3,53,181.55 |
| 9 | M.S. work in Rolled steel joists, channels, angles. Tees, plates etc. including hoisting, placing in position including providing staging and removing after completion of works and cutting to sizes as required.(including cost of supply of steel material)
(v) Steel plates :
(E 250 conforms to IS:2062-2006)
(b) 10 – 20 mm. | - | MT. | 47,161.1 | - |
| 10 | Welding by gas / electric plant including transportation of welding plant at site including cutting, forging & drilling to required shape. | 2,000 | Cm. | 1.8 | ₹3,600 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
BOQ_5082449.xls
BOQ • 0.28 MB
WBF__2911.pdf
Tender Documents • 3.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .