Loading…
Loading…
Tender Value
₹7.2 Cr
EMD Value
₹14.5 L
Closing Date
10 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
ADEN MTD
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less: where V= Advertised value of the tender in crores of Rupees. N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Any consultancy services involving joint feasibility report (JFR)/details project report(DPR) of services of ROB/RUB/ROR ( Click here to download Format)
20 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
General Conditions of the Contract (GCC), 2022 is applicable to this contract.
Non-compliance with any of the conditions set forth therein above is liable to result in the tender being rejected.
It shall not be obligatory on the said authority to accept the lowest tender and no tenderer/tenderers shall demand any explanation for the cause of rejection of his/their tender.
If the tenderers deliberately gives/give wrong information in his/their tender or creates/create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
If the tenderer/s expires after the submission of his/their tender or after the acceptance of his tender, the Rly. shall deem such tender as cancelled. If a partner of a firm expires after the submission of their tender or after the acceptance of their tender, the Railway shall deem such tender as cancelled unless the firm retains its character.
Preparation of DPR and GADs of RUB/ROB at various LCs over Jodhpur Division
127of2026-27~NWR
127of2026-27
Open
Works - General
6 Months
Jodhpur, Rajasthan
₹0
₹14.5 L
13 Aug 2026
13 Aug 2026
27 Aug 2026
23 items across 1 schedule · ₹1,49,89,829.38 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | 0m to 10m | Metre | 1880.00 | 1,300.48 | 24,44,902.4 |
| 2 | 10m to 20m | Metre | 1880.00 | 1,343.29 | 25,25,385.2 |
| 3 | Extra for 150mm dia. bore in hard Rock/large Boulder at all levels | Metre | 846.00 | 2,282.52 | 19,31,011.92 |
| 4 | 0m to 10m | Metre | 282.00 | 3,189.64 | 8,99,478.48 |
| 5 | 10m to 20m | Metre | 282.00 | 3,418.43 | 9,63,997.26 |
| 6 | Taking out 100mm dia. & 450mm long undisturbed samples of soil from bore holes, including provision of air tight containers for packing and, labeling incl. transporting the samples to laboratory. Piston sampler shall be used for extracting undisturbed samples where necessary. Samples shall be collected as per IS:2720. | Each | 564.00 | 152.52 | 86,021.28 |
| 7 | Taking out 100mm dia. & 450mm long disturbed samples of soil from bore holes, including provision of air tight containers for packing, labeling and transporting the samples to laboratory. Samples shall be collected as per IS:2720. | Each | 564.00 | 164.57 | 92,817.48 |
| 8 | Conducting standard penetration test as per IS:2131 at approximate1.5m intervals in bore holes, as directed by the Engineer in charge | Each | 282.00 | 852.27 | 2,40,340.14 |
| 9 | Collection of water samples at required intervals | Each | 282.00 | 234.14 | 66,027.48 |
| 10 | Moisture Content/Dry Density | Each | 282.00 | 287.66 | 81,120.12 |
| 11 | Atterberg Limits | Each | 282.00 | 586.02 | 1,65,257.64 |
| 12 | Specific Gravity | Each | 282.00 | 631.51 | 1,78,085.82 |
| 13 | Grain size analysis including Hydrometer analysis | Each | 282.00 | 727.84 | 2,05,250.88 |
| 14 | Direct Shear Test | Each | 282.00 | 2,330.69 | 6,57,254.58 |
| 15 | Natural Density | Each | 282.00 | 674.32 | 1,90,158.24 |
| 16 | Consolidation Test | Each | 282.00 | 6,886.37 | 19,41,956.34 |
| 17 | Unconfined Compression Test | Each | 282.00 | 2,006.91 | 5,65,948.62 |
| 18 | Tri-axial Test | Each | 282.00 | 2,158.09 | 6,08,581.38 |
| 19 | Density Test | Each | 282.00 | 301.04 | 84,893.28 |
| 20 | Water Absorption & Porosity | Each | 282.00 | 301.04 | 84,893.28 |
| 21 | Hardness | Each | 282.00 | 167.24 | 47,161.68 |
| 22 | Unconfined Compression Test | Each | 282.00 | 2,144.71 | 6,04,808.22 |
| 23 | Point Load Test | Each | 282.00 | 1,150.63 | 3,24,477.66 |
| Schedule total | ₹1,49,89,829.38 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
FinalSTDWorks12.2.20191.pdf
ATTACHMENT
Splconddprwork.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.221.pdf
ATTACHMENT
CorrigendumintenderdocumentJU01052023.pdf
ATTACHMENT
ACSno1to6inGCC2022.pdf
ATTACHMENT
ACSno7to10inGCC2022.pdf
ATTACHMENT
ACSno11dated13.03.26toIRGCCApril-2022.pdf
ATTACHMENT
7GuidelineregardingsubmissionofAnnexure-VofGCC.pdf
ATTACHMENT
SeekingclarificationonapplicabilityofGCCCorrectionSlipNo1024-06-2025.pdf
ATTACHMENT
Splconddprwork.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].