Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance NO 17 WABAG HOUSE 200 FEET THORAIPAKKAM PALLAVARAM MAIN ROAD SUNNAMBU KOLATHUR CHENNAI KANCHIPURAM TAMIL NADU 600117 | CHENGALPATTU | TAMIL NADU | 600117 | Admitted-Finance |
| 5 | Rejected-Technical 0 NARA MEERUT ROAD MUZAFFARNAGAR UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | Rejected-Technical As per approval bidder is techno commercially not acceptable |
Tender Value
Refer Docs
EMD Value
₹77.0 L
Closing Date
13 Aug 2020, 4:00 pmClosed
Puneet Khanna (Head-Supply Chain Management)
WORLEY India Private Limited, New Energy House , Ramakrishna Mandir Road, Kondivita, Andheri (East), Mumbai-400 059, India
LSTK_D Water Treatment Package and Waste Water Treatment Package
2020_REFHQ_117766_1
44AC9100-00-ER-370021
Open Tender
Lump Sum TurnKey
480 days
IOCL GUJARAT REFINERY, INDIA
Please refer Tender documents
10 documents required · 10 mandatory
₹77.0 L
Yes
WORLEY India Private Limited
2 Nov 2020
27 May 2020
14 Aug 2020
27 May 2020
13 Aug 2020
24 Jun 2020
12 Jun 2020
Amount
Residual Process Engineering, Detailed Design Engineering including HAZOP/HAZID/SIL Study & Other Safety Studies as mentioned in Bidding Documents, Project Management, Topography Survey and Soil Investigation, Site enabling jobs including area filling and grading upto FGL, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares, Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil foundation, piling works, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation, Painting, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance which will be obtained by M/s IOCL),pre commissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel, Contract closure activities , Final invoice/ billing & document hand over and handing over of the facilities with Final and “As Built” documentation for LSTK-D Package comprising of Water Treatment Package (WTP) & Waste Water Treatment Package (WWTP) (which consists of Raw Water System, Raw Water Treatment unit, Drinking Water System, Demineralized Water Unit, Condensate Polishing Unit, Effluent Treatment Plant including ZLD) of Acrylic/Oxo-Alcohol Project at IOCL Dumad Complex, Near Gujarat Refinery
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
ENGINEERING PRICE ( DESIGN AND DETAILED ENGINEERING OF WATER TREATMENT / WASTE WATER TREATMENT PACKAGES AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
LUMPSUM PRICE FOR CONSTRUCTION / INSTALLATION, START-UP, PRECOMMISSIONING, COMMISSIONING, PGTR, TRAINING PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Tax Details
GST ON SUPPLY OF INDIGENOUS GOODS (PART BREAK-UP OF SP-1 )
Customs Duty on Foreign Component of SP-1
SWS on Customs duty on Foreign Component of SP-1
IGST/ (CGST+SGST) on (Foreign Component of SP-1 + (Customs duty at Sr.2.1 + SWS at 2.2 above))
GST ON SUPPLY OF SERVICES (PART BREAK-UP OF SP-2)
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for ALL TYPES OF ANALYSERS (including GCs) / ANALYSER SHELTERS as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for DCS (Supplied by Contractor) as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for PLC system (if applicable for UF & RO) as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Annual charges for Post Warranty maintenance for Machine Monitoring System - MMS (if applicable as per equipment load rating and criticality) as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
GUARANTEED UTILITY CONSUMPTION FOR WATER TREATMENT / WASTE WATER TREATMENT PACKAGES AS PER BIDDING DOCUMENT
GUARANTEED POWER CONSUMPTION FOR WATER TREATMENT / WASTE WATER TREATMENT PACKAGES AS PER MR
GUARANTEED STEAM (MP STEAM) CONSUMPTION FOR WATER TREATMENT / WASTE WATER TREATMENT PACKAGES AS PER MR
GUARANTEED COOLING WATER CONSUMPTION FOR WATER TREATMENT / WASTE WATER TREATMENT PACKAGES AS PER MR
Description of Work / Item(s)
Amount
Optional Price for 3 Years Operation & Maintenance (O&M) Contract for Water Treatment Package & Waste Water Treatment Package as per detailed scope of work defined elsewhere in the Bidding Document.
SUPPLY PORTION (SUPPLY OF ALL MATERIALS INCLUDING CHEMICAL, OIL, LUBRICANTS ETC. AFTER 6 MONTHS OPERATION)
SERVICE PORTION
TOTAL VALUE
VA Tech Wabag Ltd
LARSEN AND TOUBRO LIMITED
PARAMOUNT LIMITED
LARSEN AND TOUBRO LIMITED
PARAMOUNT LIMITED
Praj Industries Limited
VA Tech Wabag Ltd
LARSEN AND TOUBRO LIMITED
PARAMOUNT LIMITED
LARSEN AND TOUBRO LIMITED
VA Tech Wabag Ltd
PARAMOUNT LIMITED
PARAMOUNT LIMITED
LARSEN AND TOUBRO LIMITED
VA Tech Wabag Ltd
VA Tech Wabag Ltd
PARAMOUNT LIMITED
LARSEN AND TOUBRO LIMITED
VA Tech Wabag Ltd
PARAMOUNT LIMITED
LARSEN AND TOUBRO LIMITED
VA Tech Wabag Ltd
Praj Industries Limited
PARAMOUNT LIMITED
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid