Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.3 LQualified Make: JAINKO
Model: GVJ-1 GATE VALVE 15MM 34 L INDUSTRIAL ESTATE DIGIANA JAMMU JAMMU AND KASHMIR 180010 INDIA | JAMMU | JAMMU AND KASHMIR | 180010 | Make: JAINKO
Model: GVJ-1 GATE VALVE 15MM | L1 | Qualified MSE, MII, Category: General | |
| 2 | L2₹32.2 L+₹2.8 L (9.72%)Qualified Make: JAINKO
Model: GVJ-1 GATE VALVE 15MM H NO 2663 GYATRI PURAM PATEL PURAM SEC 1 GOMTI NAGAR VISTAR LUCKNOW UTTAR PRADESH 226010 | LUCKNOW | UTTAR PRADESH | 226010 | Make: JAINKO
Model: GVJ-1 GATE VALVE 15MM | L2 | Qualified MII | |
| 3 | L3₹35.1 L+₹5.7 L (19.6%)Qualified Make: JAINKO
Model: GVJ-1 GATE VALVE 15MM 321 A TOMAL COLONYBHORI TALAB TILLOO TALAB TILLO TALAB TILLO JAMMU JAMMU JAMMU KASHMIR 180002 | JAMMU | JAMMU AND KASHMIR | 180002 | Make: JAINKO
Model: GVJ-1 GATE VALVE 15MM | L3 | Qualified MII |
Tender Value
Refer Docs
EMD Value
₹74,950
Closing Date
9 Jul 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Copper Alloy Gate Valve For Waterworks Purpose (V2) Conforming to IS 778 (Q3)
Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3)
Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3)
Stainless Steel Shelf Rack (Q3)
Bathroom Water Shower (V2) (Q3)
Ceramic ( Vitreous China ) Flushing Cisterns for Water Closets and Urinals conforming to IS 774 (Q3)
Soap Dish - Case (Q4)
Plastic Seats and Covers for Water - Closets as per IS 2548 (Q3)
Towel Rail (Q3)
Towel Ring (Q3)
9521776
GEM/2026/B/7712212
Two Packet Bid
Copper Alloy Gate Valve For Waterworks Purpose (V2) Conforming to IS 778,Copper Alloy Gate Valve Fo
Uttarakhand; Kullu
Total value wise evaluation
PRODUCT
7 documents required · 7 mandatory
3 yrs
₹31
50%
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| Copper Alloy Gate Valve For Waterworks Purpose (V2) Conforming to IS 778 (Q3) | Dehradun | 13pieces | 15 days |
| Copper Alloy Gate Valve For Waterworks Purpose (V2) Conforming to IS 778 (Q3) | Dehradun | 31pieces | 15 days |
| Copper Alloy Gate Valve For Waterworks Purpose (V2) Conforming to IS 778 (Q3) | Dehradun | 10pieces | 15 days |
| Copper Alloy Gate Valve For Waterworks Purpose (V2) Conforming to IS 778 (Q3) | Dehradun | 15pieces | 15 days |
| Copper Alloy Gate Valve For Waterworks Purpose (V2) Conforming to IS 778 (Q3) | Dehradun | 6pieces | 15 days |
| Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) | Dehradun | 25pieces | 15 days |
| Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) | Dehradun | 66pieces | 15 days |
| Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) | - | 300pieces | - |
| Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) | Dehradun | 97pieces | 15 days |
| Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) | Dehradun | 17pieces | 15 days |
| Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) | - | 25pieces | - |
| Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) | Kullu | 56pieces | 15 days |
| Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3) | - | 56pieces | - |
| Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3) | Kullu | 42pieces | 15 days |
| Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3) | Kullu | 9pieces | 15 days |
| Stainless Steel Shelf Rack (Q3) | Dehradun | 32pieces | 15 days |
| Stainless Steel Shelf Rack (Q3) | Dehradun | 6pieces | 15 days |
| Bathroom Water Shower (V2) (Q3) | Dehradun | 3pieces | 15 days |
| Bathroom Water Shower (V2) (Q3) | Dehradun | 89pieces | 15 days |
| Ceramic ( Vitreous China ) Flushing Cisterns for Water Closets and Urinals conforming to IS 774 (Q3) | Dehradun | 14pieces | 15 days |
| Soap Dish - Case (Q4) | Dehradun | 12pieces | 15 days |
| Plastic Seats and Covers for Water - Closets as per IS 2548 (Q3) | Dehradun | 36pieces | 15 days |
| Bathroom Water Shower (V2) (Q3) | - | 59pieces | - |
| Towel Rail (Q3) | - | 126pieces | - |
| Towel Ring (Q3) | - | 87pieces | - |
| Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) | - | 503pieces | - |
| Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) | - | 75pieces | - |
| Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3) | - | 595pieces | - |
CWE, CWEHILLS, Department of Military Affairs, Indian Army, Ministry of Defence, (Hq Cwe Hills Dehradun)
₹74,950
13 Jul 2026
1 Jul 2026
9 Jul 2026
45 days from bid end date (until 23 Aug 2026)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9521776.pdf
GEM_BID • 0.34 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .