Loading…
Loading…
Tender Value
₹16.7 L
EMD Value
₹33,500
Closing Date
15 Sept 2026, 6:00 pmClosed
Executive Engineer PWD B and R Division Satna
Executive Engineer PWD B and R Division Satna
WBM/ BT Patch Shoulder Repair and Maintainence work on Naina Bathiya Sagmaniya Road Length 4.55 under Performance Gaurantee Sub Division Satna.
2026_PWDRB_532267_1
15.05-SATNA-2026-27
Open Tender
Civil Works - Roads
Percentage
30 days
SATNA
2 documents required · 2 mandatory
₹2,000
₹33,500
17 Sept 2026
31 Aug 2026
17 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and repairing by WMM layer including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per technical specification with depth 50mm to 100 mm including all material, labour, etc. complete. | 1,365 | Sqm | 135 | ₹1,84,275 |
| 2 | Filling Pot- holes and Patch Repairs with - Bituminous concrete, 40mm. (Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2)
(ii) for grading II Material | 1,706.25 | Sqm | 346 | ₹5,90,362.5 |
| 3 | Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees having girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness.
A) In area of light jungle | 0.38 | Hect. | 29,409 | ₹11,175.42 |
| 4 | Making up loss of material/irregularities on shoulders upto 100 mm thickness to the design level by adding fresh approved soil having CBR >12 and compacting it with appropriate equipment at OMC as per MoRT&H specification clause 3003 | 17,062.5 | Sqm | 52 | ₹8,87,250 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.27 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
TenDoc.pdf
Tender Documents • 33.58 MB
BOQ_641022.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .