Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC KERALA KL KERALA | ₹4.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.1 LRejected-AOC RAMANILAYAM H MOKERI PO | ₹5.1 L | L2 | Rejected-AOC L2 |
| 3 | L3₹6.1 LRejected-AOC | ₹6.1 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | VK BALAN L1 | CHANDRAN. P. L2 | MADATHUMBHAGAM LABOUR CONTRACT CO-OPERATIVE SOCIETY L3 |
|---|---|---|---|---|---|---|
| 1.00Concrete Road work- Sectioning work and Filling | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 83.72 | cum | 285.44 ₹23,896.75 | 330.08 ₹27,633.97 | 396.5 ₹33,194.58 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 14.25 | cum | 252.7 ₹3,600.98 | 292.22 ₹4,164.14 | 351.03 ₹5,002.18 |
| 2.00Concrete Road work | ||||||
| 2.00 | OD37326/2024-2025:Supply,stacking,spreading and consolidating of Quarry Muck inside the trench in canal bed, road work etc.. including carriage ,loading , unloading & stacking upto any lead. | 33.49 | cum | 815.76 ₹27,318.17 | 943.34 ₹31,590.57 | 1,133.15 ₹37,946.93 |
| 2.00 | 13.5.A:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M15 - Height upto 5m | 50.23 | cum | 7,147.42 ₹3,59,022.05 | 8,265.16 ₹4,15,167.25 | 9,928.13 ₹4,98,699.9 |
| 3.00DR Masonry | ||||||
| 3.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 2.1 | cum | 204.42 ₹429.28 | 236.4 ₹496.44 | 283.96 ₹596.32 |
| 3.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 4.35 | cum | 3,168.84 ₹13,784.45 | 3,664.4 ₹15,940.14 | 4,401.69 ₹19,147.35 |
| 3.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 1.57 | sqm | 666.23 ₹1,049.31 | 770.43 ₹1,213.43 | 925.45 ₹1,457.58 |
Tender Value
₹5.1 L
EMD Value
₹12,804
Closing Date
26 Feb 2026, 6:55 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer KyIP Canal Subdivision Vadakara
DEPOSIT kyip deposit work 24 25 Construction of Kodakkattu canal road at Azhiyur branch canal near ch 15 200km at Ward 19 of Eramala Grama PanchayathuGeneral Civil Work
2026_Irrig_838048_1
IRR/PI/TR/6608/2024_5_9_8/1
Open Tender
Civil Works - Roads
180 days
Thattolikkara
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,130
Yes
₹12,804
Yes
10 Jul 2026
19 Feb 2026
28 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Concrete Road work- Sectioning work and Filling | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.6 | cum | - | - |
| 1.002 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | cum | - | - |
| 2Concrete Road work | |||||
| 2.001 | OD37326/2024-2025:Supply,stacking,spreading and consolidating of Quarry Muck inside the trench in canal bed, road work etc.. including carriage ,loading , unloading & stacking upto any lead. | 1 | cum | - | - |
| 2.002 | 13.5.A:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M15 - Height upto 5m | - | cum | - | - |
| 3DR Masonry | |||||
| 3.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 3.002 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 1 | cum | - | - |
| 3.003 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 2.25 MB
BOQ_1411598.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid