Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically Qualified |
| 2 | Rejected-Technical | Rejected-Technical Technically Not Qualified |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
4 Aug 2026, 5:30 pmClosed
Chief Financial Officer
36A, Hemanta Basu Sarani, Kolkata 700001
Maintenance, Repairing, Renovation and Retrofitting works of the interior of the Registered Office Premises of WBIDFC Ltd at 36A, Hemanta Basu Sarani, Kolkata 700001 at specified locations and as per BOQ
2026_IDFCL_1034780_1
WBIDFC/CFO/2026-27/08
Open Tender
Miscellaneous Services
Item Wise
60 days
WBIDFC Ltd.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹50,000
Yes
WBIDFC Ltd.
20 Aug 2026
28 Jul 2026
7 Aug 2026
29 Jul 2026
4 Aug 2026
29 Jul 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling existing Wall/Floor Tiles, any types of massonary work, sanitary fittings, water line etc. and removing the rubbish outside the compound complying local municipal rules as per direction of Engineer in Charge | |||||
| 1.01 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed | 351.85 | Sqm | - | - |
| 1.02 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars - In ground floor including roof. | 1 | Cu.M | - | - |
| 1.03 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars - In Mezzanine Floor | 5.08 | Cu.M | - | - |
| 1.04 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars - In First Floor | 0.05 | Cu.M | - | - |
| 1.05 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars - In Second Floor | 1.38 | Cu.M | - | - |
| 1.06 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars -I n Third Floor | 0.47 | Cu.M | - | - |
| 1.07 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars - In Fourth Floor | 2.35 | Cu.M | - | - |
| 1.08 | Cleaning the exposed reinforcement preferably upto full diameter by wirebrush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification] [Mode of measurement:The affected surface area of reinforcement shall be considered for payment] | 60 | Sqm | - | - |
| 1.09 | Removing corroded worn out portion of reinforcement (when the area of bar is damaged by more than 25%) by cutting and replacing the same by a new plain round bar of requisite diameter by binding with required lap / welding with old bar, including cost of reinforcement, complete in all respect including removing unserviceable materials from site as per direction of the Engineer - in - charge. Note : Payment on weight (Kg.) of new reinforcement. | 100 | Kg | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.71 MB
BOQ_2541718.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .